10kV小区供配电英文文献及中文翻译
10kV小区供配电英文文献及中文翻译,.在广州甚至广东的住宅小区电气设计中一般都会涉及到小区的高低压供配电系统的设计
10kV,.,如高压配电系统图低压配电系统图等等图纸一大堆然而在真正实施过程中供电部门
(),尤其是供电公司指定的所谓电力设计小公司根本将这些图纸作为一回事按其电脑里原有
(?),的电子档图纸将数据稍作改动以及断路器按其所好换个厂家名称便美其名曰设计可笑不
,:(拿出来的图纸根本无法满足电气设计的设计意图致使严重存在以下问题也不知道是职业
) 道德问题还是根本一窍不通
1.,,跟原设计的电气系统货不对板存在与低压开关柜后出线回路严重冲突对实际施工造成严
,(). 重阻碍经常要求设计单位改动原有电气系统图才能满足它的要求垄断的没话说
2.()(),对消防负荷和非消防负荷的供电主要在高层建筑里应严格分回路从母线段都不清楚将
(,消防负荷和非消防负荷按一个回路出线尤其是将电梯和消防电梯地下室的动力合在一起
,,). 等等有的甚至将楼顶消防风机和梯间照明合在一个回路以一个表计量
3.TN-S"TN-S-C-S"(室内的还需要做系统接地保护接地型式由原设计的系统竟曲解成系统
TN-C,?),"",在好玩吧严格的按照所谓的三相四线制再做重复接地来实施导致
后续施工中存
.. 重复浪费资源以及安全隐患等等问题
............................(,违反建筑电气设计规范等等问题实在不好意思一一例举给那帮人留点混
) 饭吃的面子算了
,,总之吧在通过图纸审查后的电气设计图纸在这帮人的眼里根本不知何物经常是完工后的
,. 高低压供配电系统已是面目全非了能有百分之五十的保留已经是谢天谢地
了
.:,!,,所以我觉得住宅建筑电气设计让供电部门走大不了留点位置让他供几个必需回路的电
.. 爱怎么折腾让他自个怎么折腾去
Guangzhou, Guangdong, even in the electrical design of residential quarters, generally involving high-low cell power supply system design. 10kV power distribution systems, such as maps, drawings, etc. low-voltage distribution system map a lot. But in the real implementation of the process, the power sector (especially the so-called power supply design company appointed a small company) did these drawings for one thing, according to computer drawings of the original electronic file data to make a little change, and circuit breakers by their the name of another manufacturer will be sounding good design (ridiculously?), drawing out the design simply can not meet the electrical design intent,
resulting in a serious following problems: (do not know or not know nothing about ethical issues)
1. With the original design of the electrical system not meeting board, the existence and low voltage switchgear circuit after qualifying serious conflicts seriously hinder the actual construction, often require changes to the original design unit plans to meet its electrical system requirements (monopoly impress ).
2. On the fire load and fire load of non-supply (mainly in high-rise building in) should be strictly sub-loop (from the bus segment) are not clear, the fire load and fire load of non-qualifying press of a circuit (especially the elevator and fire elevator, basement, etc.
together power, and some fans and even the roof of the staircase lighting the fire together in a loop to a table measurement).
3. Grounding system grounding protection type of the original design of the TN-S system actually twisted into a "TN-SCS" system (needs to be done indoors TN-C, fun, right?), Strictly in accordance with the so-called "three-phase four-wire system "do repeat the ground to implement, resulting in repeated follow-up construction of a waste of resources and the existence of security risks and so on ..
............................( Violation of building electrical
design and so on enumerate really sorry to those people leave bread where the face Forget)
In short it, the review by drawing the electrical design drawings in the group of people's eyes do not know what, often after the completion
of the high and low voltage power supply system has been distorted beyond recognition, and to have 50 percent of reservations have been is thankful.
So. I think: residential building electrical design for power sector to go! Big deal leave here, let him for a few essential circuits of power, love how frustrating tossing him from a how to ..。
(完整版)建筑电气文献及外文翻译
建筑电气电气工程设计包括两个主要的设计方面。
主要是一部分的电能的转换及分配和电力的供配、照明系统、防雷接地系统。
一般来说,建筑主要的变化包括:高压和低压配电系统、变压器、备用电源系统。
电力系统包括配电和控制,室内和室外照明系统包括所有类型的照明,防雷系统包括入侵波防护、闪电传感器、接地、等电位连接和局部等电位连接等。
辅助等电位连接等。
在短短的20年里,系统在技术和产品的面貌发生了翻天覆地的变化。
许多的设计理念也发生了巨大的变化。
开关设备如高压系统的第一个断路器油断路器,后来油断路器的逐步发展,不仅规模大,但是一般都包含油物质。
由于开关设备尺寸较大,我们还必须建立独立的设备房间,占据了大量的建筑面积。
现在真空断路器和六氟化硫断路器,不仅体积小,而且短路容量大,外壳尺寸远小于原来的橱柜,并且断路器没有任何油,防火性能大大提高。
而且断路器和其他低压设备在一个房间里,这样即节省空间又方便管理。
过去大容量的低压断路器,短路电流容量逐渐变大,规模也逐渐变小,而且更加稳定,使系统运行更加安全可靠,为设计带来了方便。
向着智能化低压断路器方向发展,断路器各种参数可以通过总线工业控制,信号直接传输到计算机。
干式变压器的出现,对建筑电气设计带来了极大的方便,因为没有变压器油泄漏和火灾的可能性,以便它可以很容易地安装在建筑本身,甚至直接到负荷中心。
它还消除变压器对油的需求限制,构建大容量设备时可以使用干式变压器。
在实际工程设计中曾应用四个台湾2500kVA干式变压器。
在使用紧急发电机方面,从性能和尺寸的角度来看,比过去进步很多。
除了使用柴油发电机;应急照明使用EPS备用电源;中断供电在一个毫秒以内的设备,可以使用UPS。
电力设备的控制从单一元件的控制到控制继电器控制变化。
除了更好的性能的各种组件的规模较小,也降低控制箱的规模。
由于数字技术更多的运用于控制能达到最佳的控制状态来控制设备。
进一步提高了节能的效果。
照明系统从过去单一光源、灯具和低效率的状态向更广泛的前景发展。
电气外文文献 翻译
Circuit breaker断路器Compressed air circuit breaker is a mechanical switch equipment, can be i 空气压缩断路器是一种机械开关设备,能够在n normal and special conditions breaking current (such as short circuit cur 正常和特殊情况下开断电流(比如说短路电流)。
rent). For example, air circuit breaker, oil circuit breaker, interference circ 例如空气断路器、油断路器,干扰电路的导体uit conductor for the application of the safety and reliability of the circuit 干扰电路的导体因该安全可靠的应用于其中,breaker, current in arc from is usually divided into the following grades: a 电流断路器按灭弧远离通常被分为如下等级:ir switch circuit breaker, oil circuit breaker, less oil circuit breaker, compr 空气开关断路器、油断路器、少油断路器、压缩空essed air circuit breaker, a degaussing of isolating switch, six sulfur hexaf 气断路器、具有消磁性质的隔离开关、六氟luoride circuit breaker and vacuum breaker. Their parameters of voltage, 化硫断路器和真空断路器。
他们的参数有电压等级、current, insulation level of breaking capacity, instantaneous voltage off ti 开断容量的电流、绝缘等级开断时间的瞬时电压恢复和me of recovery and a bombing. Breaker plate usually include: 1 the maxi 轰炸时间。
电力负荷和故障外文文献翻译、中英文翻译、外文翻译
附录Electrical Loads and FaultsPart1 Electrical LoadsThe electrical load devices used in industry, in our homes and in commercial buildings are very important parts of electrical power systems. The load of any system performs a function which involves power conversion. A load converts one form of energy to another. An electrical load converts electrical energy to some other form of energy, such as heat, light or mechanical energy. Electrical loads may be classified according to the function which they perform or by the electrical characteristics which they exhibit.In order to plan for power system load requirements, it is necessary to understand the electrical characteristics of all the loads connected to the power system. The types of power supplies and distribution systems which a building uses are determined by the load characteristics. All loads may be considered as either resistive, inductive, capacitive, or a combination of these. We should be aware of the effects which various types of loads will have on the power system. The nature of alternating current causes certain electrical circuit properties to exist.One primary factor which affects the electrical power system is the presence of inductive loads. These are mainly electric motors. To counteract the inductive effects, utility companies use power-factor corrective capacitors as part of the power system design. capacitor units are located at substations to improve the power factor of the system. The inductive effect, therefore, increases the cost of a power system and reduces the actual amount of power which is converted to another from of energy.Part2 faults and its DamageEach year new designs of power equipment bring about increased reliability of operation . Nevertheless, equipment failures and interference by outside sources occasionally result in faults on electric power systems . On the occurrence of a faults, current and voltage conditions become abnormal, the delivery of power from the generating stations to the loads may be unsatisfactory over a considerable area , and if the faulty equipment is not promptly disconnected from the remainder of the system ,damage may result to other pieces ofoperating equipment .A fault is the unintentional or intentional connecting together of two or more conductors which ordinarily operate with a difference of potential between them . The connection between the conductors may be by physical metallic contact or it may be through an arc .At the fault ,the voltage between the two parts is reduced to zero in the case of metal-to-metal contacts, or to a very low value in the case the connection is through an arc . Currents of abnormally high magnitude flow through the network to the point of fault . These short-circuit currents will usually be much greater than the designed thermal ability of the conductors in the lines or machines feeding the fault . The resultant rise in temperature may cause damage by the annealing of conductors and by the charring of insulation . In the period during which the fault is permitted to exist ,the voltage on the system in the near vicinity of the fault will be so low that utilization equipment will be inoperative .It is apparent that the power system designer must anticipate points at which faults may occur ,be able to calculate conductors that exist during a faults, and provide equipment properly adjusted to open the switches necessary to disconnect the faults equipment from the remainder of the system .Ordinarily it is desirable that no other switches on the system are opened , as such behavior would result in unnecessary modification of the system .Part 3 overloadA distinction must be made between a fault and an overload .An overload only that loads greater than the designed values have been imposed on system . Under such a circumstance the voltage at the overload point may be low ,but not zero . This undervoltage condition may extend for some distance beyond the overload point into the remainder of the system .The current in the overload equipment are high and may exceed the thermal design limits . Nevertheless , such current are substantially lower than in the case of a fault . Service frequently may be maintained , but at below-standard voltage.Overload are rather common occurrences in homes. For example, a housewife might plug five waffle irons into the kitchen circuit during a neighborhood party . Such an overload , if permitted to continue , would cause heating of the power center and might eventually start a fire . To prevent such trouble , residential circuits are protected by fuses or circuit breakers which open quickly when currents above specified values persist . Distribution transformersare sometimes overload as customers instant more and more appliances. The continuous monitoring of distribution circuits is necessary to be certain that transformer sizes are increased as load grows.Part4 Various FaultsFaults of many types and cause may appear on power system . Many of our homes have seen frayed lamp cords which permitted the two conductions of the cord to come in contact with each other . When this is occurs , there is a resulting flash , and if breakers or fuse equipment functions properly ,the circuit is opened.Overload lines , for the most part, are constructed of bare conductors . These are sometimes accidentally brought together by action of wind ,sleet, trees, cranes, airplanes, or damage to supporting structures .Overvoltages due to lightning or switching may cause flashover of supporting or from conductors to conductors .Contamination on insulators sometimes results in flashover even during normal voltage conditions.The conductors of underground cables are separated from each other and from ground by solid insulation, which may be oil-impregnated paper or a plastic such as polyethylene . These materials undergo some deterioration with age ,particularly if overload on the cables have resulted in their operation at elevated temperature . Any small void present in the body of the insulating material will result in ionization of the gas contained therein , the products of which react unfavorably with the insulation .Deterioration of the insulation may result in failure of the material to retain its insulating properties , and short circuits will develop between the cable conductors . The possibility of cable failure is increased if lighting or switching produces transient voltage of abnormally high values between the conductors .Transformer failures may be the result of insulation deterioration combined with overvoltages due to lightning or switching transients transients. Short circuits due to insulation failure between adjacent turns of the same winding may result from suddenly applied overvoltages. Major insulation may fail, permitting arcs to ge established between primary and secondary windings or between a winding and grounded metal parts such as the core or tank.Generators may fail due to breakdown of the insulation between adjacent turns in the same slot, resulting in a short circuit in a single turn of the generator. Insulation breakdown may also occur between one of the windings and the grounded steel structure in which the coils areembedded. Breakdown between different windings lying in the same slot results in short-circuiting extensive sections of machine.Balanced three-phase faults, like balanced three-phase loads, may be handled on a line to-neutral basis or on an equivalent single-phase basis. Problems may be solved either in terms of volts, amperes, and ohms. The handling of faults on single-phase lines is of course identical to the method of handling three-phase faults on an equivalent single-phase basis.Part5 permanent faults and temporary faultsFaults may be classified as permanent or temporary. Permanent faults are those in which insulation failure or structure failure produces damage that makes operation of the equipment impossible and requires repairs to be made. Temporary faults are those which overhead lines frequently are of this nature. High winds may cause two or more conductors may continue as long as the line remains energized. However, if automatic equipment can be brought into operation to deenergize the line quickly, little physical damage may result and the line may be restored to service as soon as the are is extinguished. Arcs across insulators due to overvoltages from lightning or switching transients usually can be cleared by automatic circuit-breaker operation before significant structure damage occurs.Because of this characteristic of faults on lines, many companies operate following a procedure known as high-speed reclosing. On the occurrence of a fault, the line is promptly deenergized by opening the circuit breakers at each end of the line. The breakers remain open long enough for the arc to clear, and then reclose automatically. In many instances service is restored in a fraction of a second. Of course, if structure damage has occurred and the fault persists, it is necessary for the breakers to reopen and lock open.电力负荷和故障一.电力负荷用于工业、家庭、商业建筑的负载设备是电力系统中十分重要的组成部分。
外文文献翻译原文及译文
华北电力大学毕业设计(论文)附件外文文献翻译学号: 200701000324 姓名:杨曦所在院系:电力工程系专业班级:电气化0707指导教师:安勃原文标题: Research on Smart Grid in China2011年06月20日对中国智能电网的研究1摘要——智能电网是电力系统的未来发展的新方向。
在本文中,首先是智能电网的背景,意义,以及概念和结构。
典型的智能电网图如下所示.然后,在美国和欧洲智能电网的发展现状进行了描述,并对这些国家未来发展思路的趋势进行了总结和比较及分析。
此外,分析了中国智能电网发展的必要性,详细介绍了在目前与中国与有关项目,并对特高压电网和智能电网之间的的关系进行了讨论。
最后,对智能电网在未来在中国电网的潜在作用进行了展望和并为中国的智能电网发展指明新方向.索引词,智能电网,特高压电网,规划,经营,管理一导言随着世界经济全球化的推广,石油价格一直维持在一个上升的趋势。
还值得注意的是世界范围内的的能源供应短缺,对资源和环境的压力越来越大,同时,由于目前电网的低效率,在能源输送过程中损失了巨大的电力。
此外,由于不断增长的电力需求和用户对电力可靠性和质量日益增长的要求,电力工业正面临着前所未有的挑战和机遇。
因此,一个有环境友好,经济,高性能,低投资,安全性,可靠性和灵活性特点的的电力系统一直是电力工程师的目标。
尽管如此,基础设施和先进的仪表出现互联网更广泛地的使用加速了这个过程[1]。
自1990年以来随着分布式发电越来越多地使用,已经对对电网的强度提出更多的需求和要求[2][3]。
对于这些问题,为了找出最佳的解决方案,电力公司应接受新的思路,采用新技术,对现有的能源系统进行潜力挖掘,对技术和应用加以改进。
来自不同国家的学者和专家已经达成共识:未来电网的必须能够满足不同的需求及能源发电,高度市场化的电力交易的需求,由此可以满足客户的自我选择。
所有这些都将成为未来智能电网的发展方向。
变电站建设外文文献翻译
变电站建设外文文献翻译(文档含中英文对照即英文原文和中文翻译)General Requirements to Construction of SubstationSubstations are a vital element in a power supply system of industrial enterprises.They serve to receive ,convert and distribute electric energy .Depending on power and purpose ,the substations are divided into central distribution substations for a voltage of 110-500kV;main step-down substations for110-220/6-10-35kV;deep entrance substations for 110-330/6-10Kv;distribution substations for 6-10Kv;shop transformer substations for 6-10/0.38-0.66kV.At the main step-down substations, the energy received from the power source is transformed from 110-220kV usually to 6-10kV(sometimes 35kV) which is distributed among substations of the enterpriseand is fed to high-voltage services.Central distribution substations receive energy from power systems and distribute it (without or with partial transformation) via aerial and cable lines of deep entrances at a voltage of 110-220kV over the enterprise territory .Central distribution substation differs from the main distribution substation in a higher power and in that bulk of its power is at a voltage of 110-220kV;it features simplified switching circuits at primary voltage; it is fed from the power to an individual object or region .Low-and medium-power shop substations transform energy from 6-10kV to a secondary voltage of 380/220 or 660/380.Step-up transformer substations are used at power plants for transformation of energy produced by the generators to a higher voltage which decreases losses at a long-distance transmission .Converter substations are intended to convert AC to DC (sometimes vice versa) and to convert energy of one frequency to another .Converter substations with semiconductor rectifiers are convert energy of one frequency to another .Converter substations with semiconductor rectifiers are most economic. Distribution substations for 6-10kV are fed primarily from main distribution substations (sometimes from central distribution substations).With a system of dividing substations for 110-220kV, the functions of a switch-gear are accomplished by switch-gears for 6-10kV at deep entrance substations.Depending on location of substations their switch-gear may be outdoor or indoor. The feed and output lines at 6-10kV substations are mainly of the cable type .at 35-220kV substations of the aerial type .When erecting and wiring thesubstations ,major attention is given to reliable and economic power supply of a given production.Substations are erected by industrial methods with the use of large blocks and assemblies prepared at the site shops of electric engineering organizations and factories of electrical engineering industry .Substations are usually designed for operation without continuous attendance of the duty personnel but with the use of elementary automatic and signaling devices.When constructing the structural part of a substation .it is advisable to use light-weight industrial structures and elements (panels ,floors ,etc.) made of bent sections .These elements are pre-made outside the erection zone and are only assembled at site .This considerably cuts the terms and cost of construction.Basic circuitry concepts of substations are chosen when designing a powersupply system of the enterprise .Substations feature primary voltage entrances .transformers and output cable lines or current conductors of secondary voltage .Substations are mounted from equipment and elements described below .The number of possible combinations of equipment and elements is very great .Whenelaborating a substation circuitry ,it is necessary to strive for maximum simplification and minimizing the number of switching devices .Such substations are more reliable and economic .Circuitry is simplified by using automatic reclosure or automatic change over to reserve facility which allows rapid and faultless redundancy of individual elements and using equipment.When designing transformer substations of industrial enterprises for all voltages ,the following basic considerations are taken into account:1. Preferable employment of a single-bus system with using two-bus systems only to ensure a reliable and economic power supply;2. Wide use of unitized constructions and busless substations;3.Substantiated employment of automatics and telemetry ;if the substation design does not envisage the use of automatics or telemetry ,the circuitry is so arranged as to allow for adding such equipment in future without excessive investments and re-work.e of simple and cheap devices-isolating switches ,short-circuiting switches ,load-breaking isolators ,fuses ,with due regard for their switching capacity may drastically cut the need for expensive and critical oil ,vacuum ,solenoid and air switches .Substation and switch-gear circuitries are so made that using the equipment of each production line is fed from individual transformers ,assemblies ,the lines to allow their disconnection simultaneously with mechanisms without disrupting operation of adjacent production flows.When elaborating circuitry of a substation, the most vital task is to properly choose and arrange switching devices(switches ,isolators ,current limiters ,arresters ,high-voltage fuses).The decision depends on the purpose ,power and significance of the substation.Many years ago, scientists had very vague ideas about electricity. Many of them thought of it as a sort of fluid that flowed through wires as water flows through pipes, but they could not understand what made it flow. Many of them felt that electricity was made up of tiny particles of some kind ,but trying to separate electricity intoindividual particles baffled them.Then, the great American scientist Millikan, in 1909,astounded the scientific world by actually weighing a single particle of electricity and calculating its electric charge. This was probably one of the most delicate weighing jobs ever done by man,for a single electric particle weighs only about half of a millionth of a pound. To make up a pound it would take more of those particles than there are drops of water in the Atlantic Ocean.They are no strangers to us, these electric particles, for we know them as electrons. When large numbers of electrons break away from their atoms and move through a wire,we describe this action by saying that electricity is flowing through the wire.Yes,the electrical fluid that early scientists talked about is nothing more than electrical flowing along a wire.But how can individual electrons be made to break away from atoms? And how can these free electrons be made to along a wire? The answer to the first question lies in the structure of the atoms themselves. Some atoms are so constructed that they lose electrons easily. An atom of copper, for example ,is continually losing an electron, regaining it(or another electron),and losing it again. A copper atom normally has 29 electrons, arranged in four different orbits about its nucleus. The inside orbit has 2 electrons. The next larger orbit has 8.The third orbit is packed with 18 electrons . And the outside orbit has only one electron.It is this outside electron that the copper atom is continually losing, for it is not very closely tied to the atom. It wanders off, is replaced by another free-roving electron, and then this second electron also wandersaway.Consequently,in a copper wire free electrons are floating around in all directions among the copper atoms.Thus, even through the copper wire looks quite motionless to your ordinary eye, there is a great deal of activity going on inside it. If the wire were carrying electricity to an electric light or to some other electrical device, the electrons would not be moving around at random. Instead, many of them would be rushing in the same direction-from one end of the wire to the other.This brings us to the second question .How can free electrons be made to move along a wire? Well ,men have found several ways to do that .One way is chemical. V olta,s voltaic pile,or battery, is a chemical device that makes electricity(or electrons)flow in wires. Another way is magnetic. Faraday and Henry discovered how magnets could be used to make electricity flow in a wire.MagnetsAlmost everyone has seen horseshoe magnets-so called because they are shaped like horseshoes. Probably you have experimented with a magnet, and noticed how it will pick up tacks and nails, or other small iron objects. Men have known about magnets for thousands of years.Several thousand years ago, according to legend, a shepherd named Magnes lived on the island of Crete, in the Mediterranean Sea .He had a shepherds crook tipped with iron. One day he found an oddly shaped black stone that stuck to this iron ter, when many other such stones were found, they were called magnets(after Magnets).These were natural magnets.In recent times men have learned how to make magnets out of iron. More important still, they have discovered how to use magnets to push electrons through wires-that is, how to make electricity flow. Before we discuss this, there arecertain characteristics of magnets that we should know about.If a piece of glass is laid on top of a horse- shoes magnet, and if iron filings are then sprink ledon the glass, the filings will arrange themselves into lines. If this same thing is trid with a bar magnet(a horseshoe magnet straightened out),the lines can be seen more easily. These experiments demonstrate what scientists call magnetic lines of force. Magnets, they explain, work through lines of force that ext- end between the two ends of the magnet. But electrons seem to have magnetic lines of force around them, too.This can be proved by sticking a wire through a piece ofcard board, sprinkling iron filings on the cardboard, and connecting a battery to the wire. The filings will tend to form rings around the wire,as a result of the magnetism of the moving electrons(or electricity).So we can see that there is arelationship between moving electrons and magnetism, Magnetism results from the movement of electrons.Of course, electrons are not really flowing in the bar magnet, but they are in motion, circling the nuclei of the iron atoms. However, in the magnet, circling thelined up in such a way that their electrons are circling in the same direction. Perhaps a good comparison might be a great number of boys whirling balls onstrings in a clockwise direction around their heads.翻译:变电站建设的一般要求变电站(所)在电源系统的工业企业是一个至关重要的因素。
(完整版)电力系统外文英语文献资料
(完整版)电力系统外文英语文献资料Electric Power SystemElectrical power system refers to remove power and electric parts of the part,It includes substation, power station and distribution. The role of the power grid is connected power plants and users and with the minimum transmission and distribution network disturbance through transport power, with the highest efficiency and possibility will voltage and frequency of the power transmission to the user fixed .Grid can be divided into several levels based on the operating voltage transmission system, substructure, transmission system and distribution system, the highest level of voltage transmission system is ZhuWangJia or considered the high power grids. From the two aspects of function and operation, power can be roughly divided into two parts, the transmission system and substation. The farthest from the maximum output power and the power of the highest voltage grade usually through line to load. Secondary transmission usually refers to the transmission and distribution system is that part of the middle. If a plant is located in or near the load, it might have no power. It will be direct access to secondary transmission and distribution system. Secondary transmission system voltage grade transmission and distribution system between voltage level. Some systems only single second transmission voltage, but usually more than one. Distribution system is part of the power system and its retail service to users, commercial users and residents of some small industrial users. It is to maintain and in the correct voltage power to users responsible. In most of the system, Distribution system accounts for 35% of the total investment system President to 45%, andtotal loss of system of the half .More than 220kv voltage are usually referred to as Ultra high pressure, over 800kv called high pressure, ultra high voltage and high pressure have important advantages, For example, each route high capacity, reduce the power needed for the number of transmission. In as high voltage to transmission in order to save a conductor material seem desirable, however, must be aware that high voltage transmission can lead to transformer, switch equipment and other instruments of spending increases, so, for the voltage transmission to have certain restriction, allows it to specific circumstances in economic use. Although at present, power transmission most is through the exchange of HVDC transmission, and the growing interest in, mercury arc rectifier and brake flow pipe into the ac power generation and distribution that change for the high voltage dc transmission possible.Compared with the high-voltage dc high-voltage ac transmission has the following some advantages: (1) the communication with high energy; (2) substation of simple maintenance and communication cost is low; (3) ac voltage can easily and effectively raise or lower, it makes the power transmission and high pressure With safety voltage distribution HVDC transmission and high-voltage ac transmission has the following advantages: (1) it only need two phase conductors and ac transmission to three-phase conductors; (2) in the dc transmission impedance, no RongKang, phase shift and impact overvoltage; (3) due to the same load impedance, no dc voltage, and transfer of the transmission line voltage drop less communication lines, and for this reason dc transmission line voltage regulator has better properties; (4) in dc system withoutskin effect. Therefore, the entire section of route conductors are using; (5) for the same work, dc voltage potential stress than insulation. Therefore dc Wire need less insulation; (6) dc transmission line loss, corona to little interference lines of communication; (7) HVDC transmission without loss of dielectric, especially in cable transmission; (8) in dc system without stability and synchronization of trouble.A transmission and the second transmission lines terminated in substation or distribution substations, the substation and distribution substations, the equipment including power and instrument transformer and lightning arrester, with circuit breaker, isolating switch, capacitor set, bus and a substation control equipment, with relays for the control room of the equipment. Some of the equipment may include more transformer substations and some less, depending on their role in the operation. Some of the substation is manual and other is automatic. Power distribution system through the distribution substations. Some of them by many large capacity transformer feeders, large area to other minor power transformer capacity, only a near load control, sometimes only a doubly-fed wire feeders (single single variable substation)Now for economic concerns, three-phase three-wire type communication network is widely used, however, the power distribution, four lines using three-phase ac networks.Coal-fired power means of main power generating drive generators, if coal energy is used to produce is pushing the impeller, then generate steam force is called the fire. Use coal produces steam to promote the rotating impeller machine plant called coal-fired power plants. In the combustion process, the energy stored in the coal to heat released,then the energy can be transformed into the form within vapor. Steam into the impeller machine work transformed into electrical energy.Coal-fired power plants could fuel coal, oil and natural gas is. In coal-fired power plant, coal and coal into small pieces first through the break fast, and then put out. The coal conveyer from coal unloader point to crush, then break from coal, coal room to pile and thence to power. In most installations, according to the needs of coal is, Smash the coal storage place, no coal is through the adjustable coal to supply coal, the broken pieces of coal is according to the load changes to control needs. Through the broken into the chamber, the coal dust was in the second wind need enough air to ensure coal burning.In function, impeller machine is used to high temperature and high pressure steam energy into kinetic energy through the rotation, spin and convert electricity generator. Steam through and through a series of impeller machine parts, each of which consists of a set of stable blade, called the pipe mouth parts, even in the rotor blades of mobile Li called. In the mouth parts (channel by tube nozzle, the steam is accelerating formation) to high speed, and the fight in Li kinetic energy is transformed into the shaft. In fact, most of the steam generator is used for air is, there is spread into depression, steam turbine of low-pressure steam from the coagulation turbine, steam into the condenses into water, and finally the condensate water is to implement and circulation.In order to continuous cycle, these must be uninterrupted supply: (1) fuel; (2) the air (oxygen) to the fuel gas burning in the configuration is a must; (3) and condenser, condensed from the condensed water supply, sea and river to lake. Common coolingtower; (4) since water vapour in some places in circulation, will damage process of plenty Clean the supply.The steam power plant auxiliary system is running. For a thermal power plant, the main auxiliary system including water system, burning gas and exhaust systems, condensation system and fuel system. The main auxiliary system running in the water pump, condensation and booster pump, coal-fired power plants in the mill equipment. Other power plant auxiliary equipment including air compressors, water and cooling water system, lighting and heating systems, coal processing system. Auxiliary equipment operation is driven by motor, use some big output by mechanical drive pump and some of the impeller blades, machine drive out from the main use of water vaporimpeller machine. In coal-fired power plant auxiliary equipment, water supply pump and induced draft fan is the biggest need horsepower.Most of the auxiliary power generating unit volume increased significantly in recent years, the reason is required to reduce environment pollution equipment. Air quality control equipment, such as electrostatic precipitator, dust collection of flue gas desulfurization, often used in dust in the new coal-fired power plants, and in many already built in power plant, the natural drive or mechanical drive, fountain, cooling tower in a lake or cooling canal has been applied in coal-fired power plants and plants, where the heat release need to assist cooling system.In coal-fired power stations, some device is used to increase the thermal energy, they are (1) economizer and air preheater, they can reduce the heat loss; (2) water heater, he can increase the temperature of water into boiling water heaters; (3) they can increase and filter the thermal impeller.Coal-fired power plants usually requires a lot of coal and coal reservoirs, however the fuel system in power plant fuel handling equipment is very simple, and almost no fuel oil plants.The gas turbine power plants use gas turbine, where work is burning gas fluid. Although the gas turbine must burn more expensive oil or gas, but their low cost and time is short, and can quickly start, they are very applicable load power plant. The gas turbine burn gas can achieve 538 degrees Celsius in the condensing turbine, however, the temperature is lower, if gas turbine and condenser machine, can produce high thermal efficiency. In gas turbine turbine a combined cycle power plant. The gas through a gas turbine, steam generator heat recovery in there were used to generate vapor heat consumption. Water vapor and then through a heated turbine. Usually a steam turbine, and one to four gas turbine power plant, it must be rated output power.。
变电站施工建设外文系翻译中英文
外文文献翻译(含:英文原文及中文译文)文献出处:Power System Protection & Control, 2013, 3(5):63-68.英文原文General Requirements to Construction of SubstationCarpentier JennySubstations are a vital element in a power supply system of industrial enterprises. They serve to receive , convert and distribute electric energy .Depending on power and purpose ,the substations are divided into central distribution substations for a voltage of 110-500kV;main step-down substations for110-220/6-10-35kV;deep entrance substations for 110-330/6-10kV;distribution substations for 6-10kV;shop transformer substations for 6-10/0.38- the main step-down substations, the energy received from the power source is transformed from 110-220kV usually to 6-10kV(sometimes 35kV) which is distributed among substations of the enterprise and is fed to high-voltage services.Central distribution substations receive energy from power systems and distribute it (without or with partial transformation) via aerial and cable lines of deep entrances at a voltage of 110-220kV over the enterprise territory .Central distribution substation differs from the main distribution substation in a higher power and in that bulk of its power is ata voltage of 110-220kV;it features simplified switching circuits at primary voltage; it is fed from the power to an individual object or region .Low-and medium-power shop substations transform energy from 6-10kV to a secondary voltage of 380/220 or 660/380.Step-up transformer substations are used at power plants for transformation of energy produced by the generators to a higher voltage which decreases losses at a long-distance transmission .Converter substations are intended to convert AC to DC (sometimes vice versa) and to convert energy of one frequency to another .Converter substations with semiconductor rectifiers are convert energy of one frequency to another .Converter substations with semiconductor rectifiers are most economic. Distribution substations for 6-10kV are fed primarily from main distribution substations (sometimes from central distribution substations).With a system of dividing substations for 110-220kV , the functions of a switch-gear are accomplished by switch-gears for 6-10kV at deep entrance substations.Depending on location of substations their switch-gear may be outdoor or indoor. The feed and output lines at 6-10kV substations are mainly of the cable type .at 35-220kV substations of the aerial type .When erecting and wiring the substations, major attention is given to reliable and economic power supply of a given production. Substationsare erected by industrial methods with the use of large blocks and assemblies prepared at the site shops of electric engineering organizations and factories of electrical engineering industry .Substations are usually designed for operation without continuous attendance of the duty personnel but with the use of elementary automatic and signaling devices.When constructing the structural part of a substation .it is advisable to use light-weight industrial structures and elements (panels ,floors ,etc.) made of bent sections .These elements are pre-made outside the erection zone and are only assembled at site .This considerably cuts the terms and cost of construction.Basic circuitry concepts of substations are chosen when designing a power supply system of the enterprise .Substations feature primary voltage entrances .transformers and output cable lines or current conductors of secondary voltage .Substations are mounted from equipment and elements described below .The number of possible combinations of equipment and elements is very great .When elaborating a substation circuitry ,it is necessary to strive for maximum simplification and minimizing the number of switching devices .Such substations are more reliable and economic .Circuitry is simplified by using automatic enclosure or automatic change over to reserve facility which allows rapid and faultless redundancy of individual elements and using equipment.When designing transformer substations of industrial enterprises forall voltages, the following basic considerations are taken into account:1. Preferable employment of a single-bus system with using two-bus systems only to ensure a reliable and economic power supply;2. Wide use of unitized constructions and bustles substations;3.Substantiated employment of automatics and telemetry ;if the substation design does not envisage the use of automatics or telemetry ,the circuitry is so arranged as to allow for adding such equipment in future without excessive investments and re-work.e of simple and cheap devices-isolating switches ,short-circuiting switches ,load-breaking isolators ,fuses ,with due regard for their switching capacity may drastically cut the need for expensive and critical oil ,vacuum ,solenoid and air switches .Substation and switch-gear circuitries are so made that using the equipment of each production line is fed from individual transformers ,assemblies ,the lines to allow their disconnection simultaneously with mechanisms without disrupting operation of adjacent production flows.When elaborating circuitry of a substation, the most vital task is to properly choose and arrange switching devices (switches, isolators, current limiters, arresters, high-voltage fuses).The decision depends on the purpose, power and significance of the substation.Power System Substation is an important and indispensable component of the power it assumed the task of conversion anddistribution of grid security and the economy play a decisive role in running is to contact the user’s power plant s and intermediate links. With economic development, expanding grid capacity, reliability of operation of the power grid is getting higher and higher requirements. Development of science and technology, intelligent switches, photoelectric current and voltage transformer, a run-line state detection, training simulation Substation Operation matures, such as high-tech, as well as fiber-optic technology, computer high-speed network system in the development of real-time applications, bound to the existing substation automation technology have a profound impact, all-digital substation automation system development trend.Power system is operated by the production, transmission, distribution and consumption of a variety of power linked to the composition of electrical equipment. As a result of a large number of powers can not be stored, we must ensure that the production of electricity and energy balance. With the scientific and technological advances in the technological development of our country has reached a certain level. Intelligent switches, photoelectric current and voltage transformer, a run-line state detection, training simulation Substation Operation matures, such as high-tech, as well as fiber-optic technology, computer high-speed network system in the development of real-time applications, significantly increase the transformation degree ofautomation.Design of our substation cable programs tend to be simple, many of the recent domestic new 220 k V substation and 110kV voltage levels of wiring without the use of dual-bus bypass bus. The use of GIS, the priority sub-bus single wire. Terminal Substation, the line as far as possible, such as transformer unit wiring. A large number of the introduction of new technology, transformer substation rising level of electrical equipment, power distribution devices from the traditional form of moving toward oil-free, vacuum switches, SF6 switches and mechanical, electrical equipment combination of the development of small-scale integration. In recent years the world famous high-voltage electrical equipment companies have been developing, the development of the various types of 145-550 kV outdoor high-pressure and ultrahigh-pressure combination of electrical appliances, some high-voltage switchgear plant has also started production of 145 k V compact outdoor portfolio electrical appliances. Smart plug-in type outdoor switchgear is a more complete high-pressure and ultrahigh-pressure switch system, which includes electrical first and second equipment, as well as the associated fiber optic cable, such as plug-type compound. The entire distributed substation automation system; the introduction of advanced network technology; substation and the construction area covers an area of reduced substation program tosimplify wiring, switchgear, bus and steel pipes, such as the use of stents to substation layout is more simple, the abolition of the former station area and optimize the layout to make a substantial decline in an area substation.With technological advances, the traditional relay protection devices are gradually being replaced by microprocessor-based protection. Microprocessor-based protection is referred to as the protection of PC computer, a digital relay protection, is based on the programmable digital circuit technology and real-time digital signal processing technology of the Power System Protection. At present, both at home and abroad have been developed to 32-bit digital signal processor for hardware-based protection, control, measurement, and data communications integration of microprocessor-based protection control devices, and artificial intelligence technology into a number of relay protection, such as artificial neural networks, fuzzy theory to determine the realization of fault type, fault location, the direction of protection, the main equipment and other new methods of protection. By means of wavelet analysis of the theory of digital signal failure of the entire frequency band information and to achieve fault detection. These artificial intelligence technologies to improve the accuracy of failure to provide a means of identification, but also some single-frequency signal based on the traditional method difficult to identify the problems to be resolved. At present, themicroprocessor-based relay protection is along the microprocessor-based protection network, and intelligent, adaptive and protection, control, measurement, signal, data communications integration direction. The most basic request that charged barbed wire net in the city circulates is safe and stable. The core problem of charged barbed wire net safety in the city stability wants to build up to be a with the city mutually accommodative of, reasonable of charged barbed wire net structure. This text passes and programs to the charged barbed wire net with electric power and designs the technique principle of the aspect analysis. Elaborated the standard concerning electric voltage grade, power supply credibility, power supply ability and charged barbed wire net safe power supply requests etc. some problems that should notice in the charged barbed wire net safety; And have already aimed at sex's elaborating request to the concrete design principle opposite charged barbed wire net safe power supply of the 220 kV transformer substation and 110kV transformer substation.How to promise power supply credibility1) Satisfy charged barbed wire net power supply safe standard. The power supply network satisfies the request of power supply credibility. The standard that all satisfies N-l, city area center high burden density important customer in the district satisfies the standard of N-2.Disallow transformer over carry. Help a southern city net power supply credibilityrate index sign programming target is 99.99%.2) Press to go together with charged barbed wire net burden to transfer ability in the city satisfies following request:①The transformer substation loses any once enter line or one set lord transformer but lower power supply ability, win press to go together with charged barbed wire net to have to transfer burden to ensure the ability of power supply. ②When a female line of transformer substation stops luck because of putting, winning to press to go together with charged barbed wire net should have the ability that transfer all burden.③When the 10kV goes together with electric wire road any check to fix or breaks down, going together with the charged barbed wire net should have non- check of transfer to fix, non- breakdown segment ability for carrying. The non- check fixes, The non- breakdown segment carries to the power is off time only for go together with to give or get an electric shock an equipments to pour a Zia operation for time.3) Ask to satisfy a following principle while allowing the capacity of the power outage and the target of the instauration power supply while going together with charged barbed wire net breakdown to make the customer the power is off:①The customer of two back track power supplies, after losing a back track, should be unlimited to give or get an electric shock.②The customer of three back track power supplies , after losing aback track, should be unlimited to give or get an electric shock, again after losing a back track, should satisfy power supply capacity 50-70% is used an electricity.③When all of a back track or much customer's the power of back track power supplies stopped, resume target time of power supply broke down to handle for a back track restored of ask.④At wreath net power supply method in for open the customer in the wreath network, the lowest instauration power supply request for breaking down wreath net is to need to pass charged barbed wire net operation instaurationPower supply of time, its target time need for operating of asks; it is the power supply that passes to go together with net automation restriction to resume an intact block in the lain to go together with net automation circuit.(3)Power supply ability and safety1)Of each electric voltage layer net capacity in the city net, press definitely change the electric capacity carry to compare an allocation, the all levels electric voltage net changes the electric capacity carry compare satisfy the upper limit request that current 《electric power net in the city programming design lead 》stipulates. According to 2001 national economy trade committee promulgation of electric power profession standard 《electric power system safety stability lead 》middlefinger:N.a standard is under the normal movement method of the any component(is like circuit, generator, and transformer...etc.) In the electric power system have no break down or because of break down break to open, electric power system should Can keep stable to circulate with normal power supply, other components however carry, electric voltage and frequency all are allowing inside the scope. This is usually called N. one standard.The charged barbed wire net power supply safe standard has-l standard and quasi- N one 2 standards and Ns is one 2 standards.City's going together with the power supply safety of charged barbed wire net to usually request is to adopt N one standard. It is one 2 standards to have already adopted quasi- N as well at the power supply safety especially important place one 2 standards or Ns.2) Medium press and go together with charged barbed wire net and have certain back up capacity, generally should have 50% Yu degrees, while being any component check and fixing and breaking down and stopping and carrying should pass and pour a Zia operation can keep a segment the customer continue toward the customer or non- trouble power supply, go together with each component of charged barbed wire net while transferring burden however carry, unlimited electricity. When two set lords happen that the power is off at the same time, that is used circuit should adjust above 60% burden.中文译文变电站建设的一般要求作者:Carpentier Jenny变电站是工业企业供电系统的重要组成部分。
供配电外文翻译
供配电外文翻译附录一中文译文消防随着我国经济的快速发展,人民生活水平不断提高,城市一天一天变得焦虑,敦促着城市如何面对未来的发展方向。
这种高级的民间建筑所需的维修材料和方式多样化,用电的负载天然气和煤炭消费量扩大,对火灾自动报警系统的设计提出更高更严格的要求。
为了保证人民生命和财产安全,火灾自动报警系统的设计已成为高水平民用建筑设计一个最重要的设计内容。
目前经有经验的高层民用建筑师在监督共工作基础上讨论,在火灾报警系统设计的基础上提出国家有关标准和标准不清楚标准的细节的一些浅显的意见。
(1)设计依据火灾自动报警系统的设计,是一个专业性很强的技术工作,同时,还具有很强的政策性。
因此,首先应该在设计基础上明确以下几点:第一,必须把握建筑设计的防火标准,该系统的设计标准,设备制造标准,安装施工验收规范和管理的法律法规等五大方面的消防法律,法规,并在实际了解目前有关国家标准和标准关键字:“必须”,“应该”,“适合”,“五一”和反面:“严格禁止”,“不应该”,“没有”,“不适合”的含义。
第二,必须着眼于高层次的民间建筑的功能,使用和保护对象的防火等级,认真执行现行国家有关标准和规定,切实履行公安消防监督部门审批意见。
(2)火灾自动报警系统设备建立1火灾探测器的建立○敞开的空间或楼梯间应单独划分搜索范围,每2?3建立火灾探测器。
第一个房间(包括对防烟楼梯间前的警卫,前室,消防电梯前室,消防电梯烟楼梯间派上用场,对前室的警卫)和过道应区分单独划分搜索范围,特别前室和电梯,分散的楼梯间和想通的过道,烟雾更容易聚集或流动,人员分散,从而节省防火目标,因此应安装火灾探测器。
关于房间前面的普通电梯虽然不是分散人员,但这个前室和电梯井是相通的,烟雾容易聚集或流动,适当单独划分搜索范围,并安装防火探测器。
电缆轴因为很容易形成输出火灾的通道,发生火灾时火势不容易沿电缆延伸,为此,“高层民用建筑设计防火规范”和“民用建筑电气设计标准“分别提出的建设和在电线或电缆塑造了详细具体的规定。
供配电设计的英语
供配电设计的英语English:The design of power distribution involves the systematic planning and layout of electrical systems to ensure reliable and efficient energy distribution to various loads. This process includes determining the optimal location and capacity of substations, transformers, and distribution lines to meet the electrical demands of the intended users. In addition, the design must consider factors such as voltage stability, power quality, protection coordination, and economic feasibility. Proper coordination between various components, selection of equipment, and adherence to safety standards are crucial in ensuring a safe and reliable power distribution system. The design also involves calculating voltage drop, fault current, and load flow to ensure that the system can handle peak demand without experiencing voltage fluctuations or overloading. Overall, a comprehensive power distribution design is essential for delivering uninterrupted electricity to residential, commercial, and industrial consumers while optimizing energy efficiency and minimizing operational costs.中文翻译:供配电设计涉及对电气系统的系统规划和布局,以确保可靠高效地向各个负载分配能源。
变电所中英文对照外文翻译文献
中英文对照外文翻译Reliability of Lightning ResistantOverhead Distribution LinesLighting continues to be the major cause of outages on overhead power distribution lines. Through laboratory testing and field observations and measurements, the properties of a lightning stroke and its effects on electrical distribution system components are well-understood phenomena. This paper presents a compilation of 32 years of historical records for outage causes, duration, and locations for eight distribution feeders at the Oak Ridge National Laboratory (ORNL) .Distribution type lightning arresters are placed at dead-end and angle structures at pole mounted wormer locations and at high points on the overhead line. Station class lightning arresters areused to protect underground cable runs, pad mounted switchgear and unit substation transformers. Resistance to earth of each pole ground is typically 15 ohms or less. At higher elevations in the system, resistance to earth is substantially greater than 15 ohms, especially during the dry summer months. At these high points, ground rods were riven and bonded to the pole grounding systems in the 1960's in an attempt to decrease lightning outages. These attempts were only partially successful in lowering the outage rate. From a surge protection standpoint the variety of pole structures used (in-line, corner, angle, dead end, etc.) and the variety of insulators and hardware used does not allow each 13.8 kV overhead line to be categorized with a uniform impulse flashover rating (170 kV, etc.) or a numerical BIL voltage class (95 kV BIL; etc.). For simplicity purposes in the analysis, each overhead line was categorized with a nominal voltage construction class (15 kV, 34 kV, or 69 KV). Six of the eight overhead lines (feeders 1 through 6) were built with typical REA Standard horizontal wood cross arm construction utilizing single ANSI Class 55-5 porcelain pin insulators (nominal 15 kV insulation). The shield angle of the overhead ground wire to the phase conductors is typically 45degrees. One overhead line (feeder 7) was built with transmission type wood pole construction because the line extended to a research facility which was to have generated electrical power to feed back into the grid. Pole structure of this line are of durable wood cross a construction which utilize double ANSI 52-3 porcelain suspension insulators to support the conductors (nominal 34 kV insulation). The shield angle of the overhead ground wire to the phase conductors for feeder 7 is typically 30 degrees. In 1969, an overhead line (feeder 8) was intentionally built with "lightning resistant" construction in an attempt to reduce lightning caused outages. Pole structures of the line have phase over phase 24-inch long fiberglass suspension brackets with double ANSI 52-3 porcelain suspension insulators to support the conductors (nominal 69 kV insulation). The shield angle of the overhead ground wire to the phase conductors for feeder 8 is typically 30 degrees. The failure data was compiled for each of the eight 13.8 kV feeders and is presented in Table, along with pertinent information regarding feeder construction, elevation, length, and age.A key finding of the failure analysis is that weather-relatedevents account for over half (56%) of the feeder outages recorded. Fifty-seven of the 76 weather-related outages were attributed to lightning. Insulation breakdown damage due to lightning is also suspected in at least a dozen of the equipment failures observed. The data indicates overhead lines which pass over high terrain are less reliable because of the greater exposure to lightning. For example, feeder 3 had the most recorded outages (48), of which two-thirds were due to weather-related events; this feeder is also the highest line on the plant site, rising to an elevation of 450 above the reference valley elevation. Overhead lines that are longer and to which more substations and equipment are attached were also observed to be less reliable (more exposure to lightning and more equipment to fail). The age of the line does not appear to significantly lessen its reliability as long as adequate maintenance is performed; none of the lines have had a notable increase in the frequency of outages as the lines have aged. As would be expected, the empirical data presented in Table I confirms the two overhead lines which have been insulated to a higher level (34 or 69 KV) have significantly better reliability records than those utilizing 15 kV class construction. Feeder 7 (insulated to 34 KV)and feeder 8 (insulated to 69 kV) have bad only 3 outages each over their 32 and 23 year life spans, respectively. These lines follow similar terrain and are comparable in length and age to the 15 kV class lines, yet they have a combined failure rate of 0.22 failures per year versus 4.32 failures per year for the remaining feeders.On typical 15 kV insulated line construction, lightning flashovers often cause 60 cycle power follow and feeder trip. With the higher insulation construction, outage rates are reduced by limiting the number of flashovers and the resultant power follow which causes an over current device to trip. This allows lightning arresters to perform their duty of dissipating lightning energy to earth. The number of re closer actions and their resultant momentary outages are also reduced. This is beneficial for critical facilities and processes which cannot tolerate even momentary outages. An additional benefit is that outages due to animal contact are also reduced because of the greater distance from phase conductor to ground on pole structures. Distribution line equipment to increase line insulation values are "off the shelf" items and proven technology. New lightning resistant construction typical by utilizes horizontal line posts, fiberglass standoff bracketsor any other method which world increase the insulation value. The replacement of standard pin insulators with line post insulators of greater flashover value is an effective means to retrofit existing wood cross arm construction. The doubling and tripling of dead end and suspension insulators is also a means of increasing flashover values on existing angle and dead-end structures. Current fiberglass, polymer, and epoxy technologies provide an affordable means to increase line insulation.While the use of increased insulation levels to reduce lightning flashovers and the resultant outages on overhead distribution lines has been thoroughly tested and demonstrated in laboratory and experimental tests [5], long term history field data has positively demonstrated that the use of "lightning resistant" construction can greatly reduce outages. Field use at ORNL has shown that in areas which are vulnerable to lightning, the use of increased insulation and a smaller shielding angle is an impressive and cost effective means to appreciably increase the reliability of overhead distribution lines. This reliability study clearly illustrates that the insulation requirements for high-reliability distribution feeders should be determined not by the 60 Hz operating voltage but ratherby withstand requirements for the lightning transients or other high voltage transients that are impressed upon the line. Electrical equipment (switchgear, insulators, transformers, cables, etc.) have a reserve (BE level or flashover value) to handle momentary over voltages, and by increasing that reserve, the service reliability is appreciably increased. As the electrical industry gradually moves away from standard wood cross arm construction and moves toward more fiberglass, polymer and epoxy construction, increased insulation methods can be applied as part of new construction or as part of an upgrade or replacement effort. In considering new or upgraded overhead line construction, the incremental increased cost of the higher insulation equipment is d in proportion to the total costs of construction (labor, capital equipment, cables, electric poles, right-of-way acquisition), Its cost effectiveness varies with the application and the conditions to which it is be applied. Economic benefits include increased electrical service reliability and its inherent ability to keep manufacturing processes and critical loads in service. Other more direct benefits include less repair of overhead distribution lines, which can have a significant reduction in maintenance cost due to less replacement materials anda large reduction in overtime hours for maintenance crews.抗雷击架空配电线路的可靠性闪电仍然是架空配电线路上的中断1的主要原因。