建筑给水排水外文翻译文献

建筑给水排水外文翻译文献
建筑给水排水外文翻译文献

建筑给水排水外文翻译文献

(文档含中英文对照即英文原文和中文翻译)

原文:

Supplying and draining waterin hospital construction

With the fact that modern medicine science promptness develops,new technique , the new armamentarium are continuing without end , modernized medical treatment thereby consonant with that is building a hospital , are also are confronted with new design idea and new technology applying. Disregarding secondary hospital building function , what whose gets along environment, still , finclause the hospital builds equipment and is equipped with system, the request is without exception higher and higher. Because of it is to ensure daily work living not only need the rapid and intense life relevance recovering from the illness , avoiding crippling , rescuing, and promote with giving treatment to a patient. Not only the design accomplishing to the special field draining away water need to satisfy the request being unlike a function in hospital building on equipment , but also safety is be obliged to reliable. Following is built according to the hospital.

一HOSPITAL GIVES A SEWERAGE

1) Modernized hospital equipment and equipment system content is numerous , the function is peculiar , the request is very high. Except demanding to swear to continue supplying with the use water according with quality level sufficiently, need more according to demand of different medical treatment instrument and different administrative or tehcnical office to water quality , water pressure , the water temperature, classify setting up water treatment system and be in progress to system to increase pressure reduction.

2) The hospital operating rooms , the delivery room operation the water hygiene, saliva washing hands by shower bath water , the dentistry dentistry chair ought to adopt the water purifying degassing. In the homeland few are large-scale , the high rank hospital centre supplies a room, the centre disinfecting has also adopted to purify the water disinfecting, now that swear to there be no dust , the sterility , to remove the pathopoiesia source , to avoid the blockage infecting , cutting down equipment microtubule.

3) Hospital preparation rooms preparation uses water to adopt distilled water, and sets up in making distilled water system to have part pressure boost facilities. The handicraft responds to according to different hospital preparation handicraft but fixes concrete system distilled water, should satisfy demand of whose handicraft to water quality , water yield , water pressure act in close coordination that the preparation handicraft reserves corresponding to drain-pipe and allocation chilled water circulatory system by the special field draining away water.

4) Hospital operating rooms , delivery rooms , baby rooms , supply rooms , medical treatment of the dermatological department wards, door emergency call, cures skill every administrative or tehcnical office and the request difference that the staff and worker logistics branch supplies to hot water need to set up hot water respectively supplying system more. Ordinary circumstances door emergency call, cures skill administrative or tehcnical office , centre supply a room , the staff and worker logistics branch supplies hot water to water supply the regular time, the comparison supplying time is consistent. The hospital is based on major part at present financial resources, ward building hot water supplies basic to the regular time , ought to be that 24 hs supply hot water judging from long-term angle but. Operating room , the delivery room operation wash hands, the hygiene h by the fact that the shower bath ought to be 24 supplies hot water, moreover the block of wood

5) Considers beautification to the environment , is inadvisable to adopt the steam boiled water

stove , completely eradicates occurrence aroused the ward building pantry inner floor moistness , avoided interior wall mustiness phenomenon by leak or sparse steam water implement aerofluxus thereby. The hospital disregards size , boiled water supplies to should adopt automation volume or the electricity boiled water stove, a general disease area considers one , volume ascertains that according to using condition. The first easy to protect labor is managed, two is supplying ensuring that to the patient , improves the internal environment of ward at the same time.

6)Especially infecting the section ward every door emergency call administrative or tehcnical office, every consulting room , the hand movement water curing a room , washing a basin should set up mistake chew , may adopt elbow style , knee style or dyadic switch of pedal. If using the dyadic switch of pedal to must use the product guarding against leakage, the floor is to avoid using a place often damp , makes the patient , the medical personnel slip down , an accident happened. Operation waits for the operating room , the delivery room to wash hands should adopt the constant temperature muddy water valve , the constant temperature to produce water, taking as an example infrared ray induced electromagnetic valve control mode for fine. Cure skill part control laboratory , laboratory of administrative or tehcnical office have the peculiar request , water chews the form should ascertain whose water according to every administrative or tehcnical office coming functional request chewing.

7)Many administrative or tehcnical office, especially downstream pipelines such as pickling bath , the pool disinfecting , develop pool in administrative or tehcnical office such as checking the room , the control laboratory , emitting section responds to of hospitals are adopt to be able to bear the rotten PVC2U draining off silent stock tube.

8) Pair of filth , waste water of all kinds must classify strictly according to the country in connection with the effluent standard , the field carrying out a pertinency with different treatment handicraft deals with and handles.

9) Uses a function to need since the modern hospital needs to be satisfied with not only , wants to think that the interior outside environment is beautiful too at the same time. The building needs especially door emergency call, cures skill sometimes because of medical treatment function , give the horizontal stroke draining away water , erect a tube arrange to lie scattered comparatively, more bright dew is in interior, warm the pipeline exchanging special field up in addition sometimes , make the pipeline that the room inner clearly shows more than the correct or required number , both inelegant, and affect hygiene. This demands right away in the process of

engineering design , the rational arrangement the structure form should fully utilize not being the same as is carried out, needs to make the various pipeline conceal arrangement to the full according to the function , pays attention to beautiful befitting one's position or suited to the occasion under not affecting the premise being put into use. Certainly, these require that building structure special field is dense. Tier of furred ceilings and the basement top sometimes are every special field pipeline aggregation field , every special field norm and request having every special field , each sometimes arranges if the building designs middle in the ward,whose result either increase building storey height, or cannot attend to one thing without neglecting another. For overcoming this one abuse, should think in general that bigger flue pipe arrangement be in the most superjacent, it's on the down part is that several special field arrangement props up the public space being in charge of , down part is to arrange to give draining off , driving force , strong , weak electricity every system to do a tube again. Such is arranged than form arrangement is other comparatively economical , pragmatic.

10) Exchangers forms choice. In the system the tradition hospital hot water is supplied, people adopt volume mainly dyadic exchanger. Have been to think that what be provided steam amounts and hot water supplies the adjustment amounts dispatching value between maximum value mainly , have diminished a steam boiler designing amounts , have decreased by boiler room Zhan field area , have saved one time investment. People demands but more highly, and more highly, especially the example discovering army group bacterium pathopoiesia in life hot water to water quality now , the altitude arousing people takes seriously. Be a bacterium mainly because of in the water 55 ~C is the easiest to breed an army group in 30 ~C ~, WHO (WHO) is recommended by for this purpose: "Hot water responds to in 60 ~C use And cycle at least above 50 ~C. Come if some users, need to fall to 40 ~C or 50 ~C or so with the faucet water temperature, to come true being able to use a thermoregulation to blend a valve at this time. The growth being a temperature Bu Li Yu pneumonia diplococcus swear to store water, is a regulating valve's turn to should set up the place closing down and suspending operation of point in drawing near". This be especially important to the hospital. Because of being in hospital the weak having disease,if bacterium of army group happened within the hospital is to be harmful for patient to treat and recover from the illness,the hospital has a grave responsibility. At present small hospital within the hospital especially a little condition is relatively poor , include the part area level hospital, 24 unable hs supply hot water, and volume the dyadic converter inner water temperature is to use

echelon in inside of exchanger, the water temperature very difficult to make keeps in 60 ~C or so. Thereby, lead to volume produce the bacterium of army group in the pipeline supplying hot water system within dyadic exchanger , change a hospital using the exchanger form to respond to be a task of top priority. Adopt half to be to heat up style or be a dyadic hot exchanger , make whose hot water supply the system water temperature keeping the water supply being in progress in all above 60 ~C area all the time, occurrence propagating , completely eradicating the bacterium of army group in order to avoiding the bacterium of army group.

二MULTILAYER WATER SUPPL Y SYSTEM

At present, great majority cities municipal administration pipe network pressure can maintain above 2 kilograms in the homeland , take place individual small town water pressure can reach 4 kilograms even. The pressure therefore, building the municipal administration pipe network's to the same multilayer has been already sufficient , has been in a small town especially since but municipal administration pipe network water yield supplying water , water pressure fluctuation are bigger. Have several kinds the following types mainly for overcome these shortcomings , multilayer water supply system design.

1) Direct water supply type is that pressure , direct water supply , sort making use of municipal administration pipe network directly apply to slightly high area of municipal administration pipe network pressure or higher range of water works vicinity pressure inner. The shortcoming it is water yield , water pressure to be able to not ensure that. This water supply scheme economy function is very good but, to less pipe network of scale , does not need any other equipment or measure.

2) Water box water supply types have led municipal administration pipe network water to roof water box , discrepancy in elevation , gravity depending on a water box and using the water appliance have supplied water , have overcome water pressure water yield block of wood stability and then. Since but, secondary pollution, moreover, water box volume that the water box there exists in possibility is bigger,this way does not encourage therefore.

3) Water boxes , pipe networks ally self with a type when the ordinary time water yield water pressure is sufficient , unnecessary water enters the roof water box when covering water supply , overpressure as with a net directly from municipal administration, think that the water box supplies water to the consumer by gravity automation when pressure or the water yield is insufficient. The main force who is that regular directness supplies water on physics structure

stretches the top cut-over water box , sets up and one exhalent siphon from the water box. Owe a scheme the volume having diminished a water box, and make water not need to enter a water box staying this one step , hygiene reliability increase by. The problem is (that the municipal administration now pipe network can accomplish) but if longtime stabilivolt supplies water , the water sojourn time in water box is on the contrary greatly increase by , easier to be contaminated. And, the water box all must readjust oneself to a certain extent in the building in all usage water boxes system most higher place, attractive looks being able to affect a building in some occasion , the physical design building even.

4) Pressure jars supply water since insecure water box factor , reason why use the jar sealing off reliable pressure to replace, and the pressure jar does not need, high position lay down, attractive looks and structure not affecting a building bearing , go down well very much over the past few years. Pressure jar system requires that the water pump and autocontrol system have to fit but , feasible cost increases by to some extent. However, in the late years whose market price already lets many consumers be able to choose.Systematic pressure jar principle is to make use of a water pump water compression to be sent to receive the pipe network building the inside , thinks that water enters the pressure jar , reaches certain pressure time , water pump motor stoppage or reduces the speed when pressure is too big,While pressure is smaller than regulation value, the pressure jar conveys water to the outside and starts the water pump or acceleration at the same time (frequency conversion water pump).

5) Two time of compression types can make do for to small-scale consumer ,if the building , the pressure jar are only systematic. The direction that the dwelling house spends at present to housing estate develops but, shows for the cluster arrangement that multilayer builds , concentrates stabilivolt mainly. The ability can not satisfy a request with pressure jar volume , the water pump concentrates compression therefore having appeared give first place to, pressure jar stabilivolt (remove the system water hammer) is subsidiary way. Economy cost rises only , also needs the specially-assigned person upkeep. Besides, pipe network system belongs to low pressure since tier of numbers are not many, pipeline, the direct cut-over without exception with layers consumer is be OK , comparatively simple. The steel tube prepares pipeline material with low pressure low pressure PPR silent stock tube give first place to.

译文:

医院建筑给水排水

随着现代医学科学的迅速发展,新技术、新医疗设备层出不穷,从而与之相符的现代化医疗建筑———医院,也面临着新的设计理念和新技术的运用。无论从医院建筑物功能、其所处的环境,还是医院建筑设备及装备系统,要求均愈来愈高。因为它不仅是保障日常工作生活的需要,而且与救治病人、促进康复、避免致残、挽救生命紧密相关。作为给排水专业的设计不仅需要满足医院建筑中设备上不同功能的要求,而且必须安全可靠。下面根据医院建筑中有关给水、排水各系统设计,从社会不断发展和超前的理念方面谈几点体会

一医院给排水系统

1) 现代化医院的设备及装备系统内容繁多,功能特殊,要求很高。除了要求保证持续供给充分符合质量标准的用水外,更需要根据不同的医疗仪器以及不同科室对水质、水压、水温的要求,分门别类设置水处理系统和对系统进行增减压。

2) 医院的手术室、产房的手术洗手水、卫生通过淋浴水、牙科的牙科椅的口水宜采用净化消毒水。国内一些大型的、级别高的医院中心供应室,消毒中心也采用了净化消毒水,既保证无尘、无菌,消除致病源,避免感染,又减少设备微细管道的阻塞。

3) 医院制剂室的制剂用水采用蒸馏水,并在制蒸馏水系统中设有局部增压设施。具体制蒸馏水工艺应根据不同医院制剂工艺而定,给排水专业应密切配合

制剂工艺预留给排水管和配置相应的冷却水循环系统,满足其工艺对水质、水量、水压的要求。

4) 医院手术室、产房、婴儿室、供应室、皮肤科的医疗病房,门急诊、医技各科室和职工后勤部门对热水供应的要求差异较大,需要分别设置热水供应

系统。一般情况门急诊、医技科室、中心供应室、职工后勤部门供应热水为定时供水,供应时间比较一致。大部分医院根据目前的财力,病房楼的热水供应基本为定时,而从长远角度来看,应该是24 h 供应热水。手术室、产房的手术洗手,

卫生通过的淋浴器应该为24 h 供应热水,而且不能有任何间断,热水供应安全可靠,水温基本控制在人的正常体温37 ℃左右,故一般热水供应宜单独成为一个

系统,以确保供应热水系统万无一失。

5) 考虑到环境的美化,不宜采用蒸汽开水炉,从而杜绝蒸汽泄漏或疏水器排气所引起病房楼的备餐间内地面的潮湿,避免内墙发霉现象的发生。医院不管大小,开水供应都应采用自动容积或电开水炉,一般一个病区考虑一台,容积根据使用情况确定。一是便于护工管理;二是保证对病员的供应,同时改善病房内部的环境。

6) 各门急诊科室,尤其是传染科病房各诊室、治疗室、洗涤盆应设非手动水咀,可采用肘式、膝式或脚踏式开关。如使用脚踏式开关一定要使用防渗漏的产品,以免使用处地面经常潮湿,使病员、医务人员滑倒,发生事故。手术室、产房手术等洗手应采用恒温混水阀,恒温出水,以红外线感应电磁阀控制方式为好。医技科室的部分化验室、实验室有特殊要求,水咀应根据各科室功能的要求来确定其水咀的形式。

7) 医院的许多科室,尤其是检验室、化验室、放射科等科室中的酸洗池、消毒池、洗片池等下水管道应采用耐腐的PVC2U 排水塑料管。

8) 对各类污、废水必须严格按国家有关排放标准分门别类,用不同的处理工艺进行针对性地处置和处理。

9) 由于现代医院不仅要满足使用功能需要,同时还要考虑室内外环境美观。尤其是门急诊、医技楼往往由于医疗功能需要,给排水横、立管布置较为散乱,较多的明露在室内,有时加之暖通专业的管道,使房间内明露的管道过多,既不雅观,又影响卫生。这就要求在工程设计过程中,应充分利用不同的结构形式进行合理布置,根据功能需要尽量使各种管道隐蔽布置,在不影响使用的前提下,注意美观得体。当然,这些需要建筑结构专业密切配合和结构形式的合理。另外,随着医院建筑中设备及装备系统增多,管道的数量大大增加,合理、综合布置各系统在平面吊顶内的管道则能降低建筑层高,减少投资。如在病房楼设计中,往往首层吊顶和地下室顶部为各专业管道的集合地,各专业有各专业的规范和要求,往往各自布置,其结果要么增加建筑层高,要么顾此失彼。为了克服这一弊端,一般应考虑将较大的风管布置在最上方,其下方为几个专业布置支管的公用空间,再下方是布置给排水、动力、强、弱电各系统干管。这样布置比其他形式布置较为经济、实用。

10) 热交换器形式的选择。传统的医院热水供应系统中,人们基本上采用容积式热交换器。主要是考虑所提供蒸汽量与热水供应最大值之间差值的调节量,减小了蒸汽锅炉设计量,减少了锅炉房占地面积,节约了一次性投资。然而现在人们对水质要求愈来愈高,尤其是生活热水中发现军团菌致病的实例,引起人们的高度重视。主要是因为在30 ℃~55 ℃水中最容易繁殖军团菌,为此世界卫生组织(WHO) 推荐:“热水应在60 ℃以上储存,并至少在50 ℃以上循环。如某些使用者,需要将水龙头水温降至40 ℃或50 ℃左右,这时可以使用调温混合阀来实现。为保证蓄水温度不利于肺炎双球菌的生长,该调节阀应设定在靠近关停点的地方”。这点对医院尤为重要。因为住院的是有病的弱者,如在医院内发生军团菌则不利于病员治疗与康复,医院责任重大。目前医院内尤其是一些条件较差的小医院,包括部分区级医院,不能24 h 供应热水,并且容积式交换器内水温是以

梯形状态分布,在热交换器内部很难使水温保持在60 ℃左右。从而导致容积式热交换器内供应热水系统管道中产生军团菌,改变医院使用热交换器形式应是

当务之急。采用半即热式或即热式热交换器,使其热水供应系统水温始终保持在60 ℃以上区域进行供水,以避免军团菌滋生,杜绝军团菌的发生。

二多层给水系统

目前,国内大多数城市的市政管网压力可以维持在2公斤以上,个别小城镇的出水压力甚至可以达到4公斤。因此,对于一般的多层建筑市政管网的压力已经足够了,但是由于市政管网的供水水量、水压波动较大,尤其在小城镇。为了克服这些缺点,多层给水系统的设计主要有以下几种类型。

1)直接供水型就是直接利用市政管网的压力,直接供水,一般适用于市政管网压

力稍高的地区或水厂附近压力较高的范围内。缺点就是水量、水压不能保证。但是,对于规模较小的管网这种供水方案的经济性能很好,不需要任何其他设备或措施。

2)水箱供水型将市政管网的水引至屋顶水箱,然后靠水箱与用水器具的高差,重力供水,克服了水压水量的不稳定性。但是,由于水箱可能存在的二次污染,而且,水箱体积较大,因此这种方式不提倡。

3)水箱、管网联合型平时水量水压足够时,直接由市政网供水,超压时,多余水进入屋顶水箱,当压力或水量不足时,水箱靠重力自动向用户供水。物理结构上就是正常的直接供水的主干管伸顶接入水箱,并由水箱设一出水管。该方案减小了水箱的体积,并使水不需要都进入水箱停留这一步骤,卫生可靠性增加。但是问题就是如果长时间的稳压供水(现在的市政管网可以办到的),水箱中的水的停留时间反而大大增加,更容易受污染。而且,所有使用水箱的

建筑工程及给排水专业中英文对照翻译

Laminar and Turbulent Flow Observation shows that two entirely different types of fluid flow exist. This was demon- strated by Osborne Reynolds in 1883 through an experiment in which water was discharged from a tank through a glass tube. The rate of flow could be controlled by a valve at the outlet, and a fine filament of dye injected at the entrance to the tube. At low velocities, it was found that the dye filament remained intact throughout the length of the tube, showing that the particles of water moved in parallel lines. This type of flow is known as laminar, viscous or streamline, the particles of fluid moving in an orderly manner and retaining the same relative positions in successive cross- sections. As the velocity in the tube was increased by opening the outlet valve, a point was eventually reached at which the dye filament at first began to oscillate and then broke up so that the colour was diffused over the whole cross-section, showing that the particles of fluid no longer moved in an orderly manner but occupied different relative position in successive cross-sections. This type of flow is known as turbulent and is characterized by continuous small fluctuations in the magnitude and direction of the velocity of the fluid particles, which are accompanied by corresponding small fluctuations of pressure. When the motion of a fluid particle in a stream is disturbed, its inertia

零售企业营销策略中英文对照外文翻译文献

零售企业营销策略中英文对照外文翻译文献(文档含英文原文和中文翻译)

译文: 零售企业的营销策略 Philip Kotlor 今天的零售商为了招徕和挽留顾客,急欲寻找新的营销策略。过去,他们挽留顾客的方法是销售特别的或独特的花色品种,提供比竞争对手更多更好的服务提供商店信用卡是顾客能赊购商品。可是,现在这一切都已变得面目全非了。现在,诸如卡尔文·克连,依佐和李维等全国性品牌,不仅在大多数百货公司及其专营店可以看到,并且也可以在大型综合商场和折扣商店可以买到。全国性品牌的生产商为全力扩大销售量,它们将贴有品牌的商品到处销售。结果是零售商店的面貌越来越相似。 在服务项目上的分工差异在逐渐缩小。许多百货公司削减了服务项目,而许多折扣商店却增加了服务项目。顾客变成了精明的采购员,对价格更加敏感。他们看不出有什么道理要为相同的品牌付出更多的钱,特别是当服务的差别不大或微不足道时。由于银行信用卡越来越被所有的商家接受,他们觉得不必从每个商店赊购商品。 百货商店面对着日益增加的价格的折扣店和专业商店的竞争,准备东山再起。历史上居于市中心的许多商店在郊区购物中心开设分店,那里有宽敞的停车场,购买者来自人口增长较快并且有较高收入的地区。其他一些则对其商店形式进行改变,有些则试用邮购盒电话订货的方法。超级市场面对的是超级商店的竞争,它们开始扩大店面,经营大量的品种繁多的商品和提高设备等级,超级市场还增加了它们的促销预算,大量转向私人品牌,从而增加盈利。 现在,我们讨论零售商在目标市场、产品品种和采办、服务以及商店气氛、定价、促销和销售地点等方面的营销策略。 一、目标市场 零售商最重要的决策时确定目标市场。当确定目标市场并且勾勒出轮廓时,零售商才能对产品分配、商店装饰、广告词和广告媒体、价格水平等作出一致的决定。如沃尔玛的目标市场相当明确:

给水排水工程毕业设计正文外文翻译

1 设计任务及设计资料 1.1 设计任务 根据有关部门的批准,新乡某置业有限公司拟建一幢十五层商住楼,该建筑属一类高层建筑,地上一至三层为商场,四层以上为住宅;地下二层为设备用房,地下一层为车库,顶层设有水箱间。室内外高差为0.60m。 要求完成该高层住宅楼的建筑给水排水工程设计,并与土建工程配套。具体内容包括三部分: (1)建筑给水系统设计:生活给水; (2)建筑消防系统设计:包括消火栓给水系统、自动喷水灭火系统、灭火器的布置; (3)建筑排水系统设计:生活排水。 1.2 设计依据 (1)建筑设计资料包括建筑各层平面图、电梯机房平面图、水箱间给排水放大图。 (2)设计规范《高层民用建筑设计防火规范》GB 50045—95、《建筑给水排水设计规范》GB 50015—2003、《自动喷水灭火系统设计规范》GB 50084—2001等、《建筑灭火器配置设计规范》GB J140—90等。 1.3 市政给水排水资料及设计过程 1.3.1 给水水源及给水设计 采用两路市政给水供给,市政自来水接管管径为DN200,接管标高为地面下1.0m,供水压力为0.27MPa,市政管网不允许直接抽水。 建筑内采用独立的生活给水系统。根据设计资料,已知室外给水管网常年水头为27米,不能满足该建筑的用水要求,故室内给水系统采用分区给水方式,分为高低两区。低区地下2–3层由城市管网直接供水,采用下行上给供水方式;高区4–15层由水泵水箱联合供水,采用上行下给供水方式。但高区最下层(即4层)静水压力超过了0.45MPa, 故在这三层的横支管上设减压阀。高区管道路径为:城市管网-->地下贮水池-->水泵-->层顶水箱-->高区各层用水点。为供水安全,高区与低区连通,见图1–1。

市场营销_外文翻译_外文文献_英文文献_顾客满意策略与顾客满意

顾客满意策略与顾客满意营销 原文来源:《Marketing Customer Satisfaction 》自20世纪八十年代末以来, 顾客满意战略已日益成为各国企业占有更多的顾客份额, 获得竞争优势的整体经营手段。 一、顾客满意策略是现代企业获得顾客“货币选票”的法宝随着时代的变迁, 社会物质财富的极大充裕, 顾客中的主体———消费者的需求也先后跨越了物质缺乏的时代、追求数量的时代、追求品质的时代, 到了20世纪八十年代末进入了情感消费时代。在我国, 随着经济的高速发展,我们也已迅速跨越了物质缺乏时代、追求数量的时代乃至追求品质的时代, 到今天也逐步迈进情感消费时代。在情感消费时代, 各企业的同类产品早已达到同时、同质、同能、同价, 消费者追求的已不再是质量、功能和价格, 而是舒适、便利、安全、安心、速度、跃动、环保、清洁、愉快、有趣等,消费者日益关注的是产品能否为自己的生活带来活力、充实、舒适、美感和精神文化品位, 以及超越消费者期望值的售前、售中、售后服务和咨询。也就是说, 今天人们所追求的是具有“心的满足感和充实感”的商品, 是高附加值的商品和服务,追求价值观和意识多元化、个性化和无形的满足感的时代已经来临。 与消费者价值追求变化相适应的企业间的竞争, 也由产品竞争、价格竞争、技术竞争、广告竞争、品牌竞争发展到现今的形象竞争、信誉竞争、文化竞争和服务竞争, 即顾客满意竞争。这种竞争是企业在广角度、宽领域的时空范围内展开的高层次、体现综合实力的竞争。它包括组织创新力、技术创新力、管理创新力、产业预见力、产品研发力、员工向心力、服务顾客力、顾客亲和力、同行认同力、社会贡献力、公关传播沟通力、企业文化推动力、环境适应力等等。这些综合形象力和如何合成综合持久的竞争力, 这就是CSft略所要解决的问题。CS寸代,企业不再以“自己为中心”,而是以“顾客为中心”;“顾客为尊”、“顾客满意”不再是流于形式的口号, 而是以实实在在的行动为基础的企业经营的一门新哲学。企业不再以质量达标, 自己满意为经营理念, 而是以顾客满意, 赢得顾客高忠诚度为经营理念。企业经营策略的焦点不再以争取或保持市场占有率为主, 而是以争取顾客满意为经营理念。因此, 营销策略的重心不再放在竞争对手身上而是放在顾客身上, 放在顾客现实的、潜在的需求上。当企业提供的产品和服务达到了顾客事先的期望值, 顾客就基本满意;如果远远超越顾客的期望值, 且远远高于其他同行, 顾客才真正满意;如果企业能不断地或长久地令顾客满意, 顾客就会忠诚。忠诚的顾客不仅会经常性地重复购买, 还会购买企业其它相关的产品或服务;忠诚的顾客不仅会积极向别人推荐他所买的产品, 而且对企业竞争者的促销活动具有免疫能力一个不满意的顾客会将不满意告诉16-20个人, 而每一个被告知者会再传播给12-15个人。这样, 一个不满意者会影响到二、三百人。在互联网普及的今天, 其影响则更大。据美国汽车业的调查, 一个满意者会引发8笔潜在的生意, 其中至少有一笔会成交。而另一项调查表明, 企业每增加5%的忠诚顾客, 利润就会增长25%-95%。一个企业的80%的利润来自20%的忠诚顾客;而获取一个新顾客的成本是维持一个老顾客成本的6倍。所以,美国著名学者唐?佩 珀斯指出: 决定一个企业成功与否的关键不是市场份额, 而是在于顾客份额。 于是, 企业纷纷通过广泛细致的市场调研、与消费者直接接触、顾客信息反馈等方式来了解顾客在各方面的现实需求和潜在需求。依靠对企业满意忠诚的销售、服务人员, 定期、定量地对顾客满意度进行综合测定, 以便准确地把握企业经营中与“顾客满意” 目标的差距及其重点领域, 从而进一步改善企业的经营活动。依靠高亲和力的企业文化、高效率的人文管理和全员共同努力, 不断地向顾客提供高附加值的产品, 高水准的亲情般的服

给排水专业毕业设计英文翻译--中英文对照

河北建筑工程学院 毕业设计(论文)外文资料翻译 系别:城建系 专业:给水排水工程 班级: 姓名: 学号: 外文出处:Wan Fang foreign languages (用外文写) literature datebase 附件:1、外文原文;2、外文资料翻译译文。

1、外文原文(复印件) Supplying and draining waterin hospital construction With the fact that modern medicine science promptness develops,new technique , the new armamentarium are continuing without end , modernized medical treatment thereby consonant with that is building a hospital , are also are confronted with new design idea and new technology applying. Disregarding secondary hospital building function , what whose gets along environment, still , finclause the hospital builds equipment and is equipped with system, the request is without exception higher and higher. Because of it is to ensure daily work living not only need the rapid and intense life relevance recovering from the illness , avoiding crippling , rescuing, and promote with giving treatment to a patient. Not only the design accomplishing to the special field draining away water need to satisfy the request being unlike a function in hospital building on equipment , but also safety is be obliged to reliable. Following is built according to the hospital. 一HOSPITAL GIVES A SEWERAGE 1) Modernized hospital equipment and equipment system content is numerous , the function is peculiar , the request is very high. Except demanding to swear to continue supplying with the use water according with quality level sufficiently, need more according to demand of different medical treatment instrument and different administrative or tehcnical office to water quality , water pressure , the water temperature, classify setting up water treatment system and be in progress to system to increase pressure reduction. 2) The hospital operating rooms , the delivery room operation the water hygiene, saliva washing hands by shower bath water , the dentistry dentistry chair ought to adopt the water purifying degassing. In the homeland few are large-scale , the high rank hospital centre supplies a room, the centre disinfecting has also adopted to purify the water disinfecting, now that swear to there be no dust , the sterility , to remove the pathopoiesia source , to avoid the blockage infecting , cutting down equipment microtubule. 3) Hospital preparation rooms preparation uses water to adopt distilled water, and sets up in making distilled water system to have part pressure boost facilities. The handicraft responds to according to different hospital preparation handicraft but fixes concrete system distilled water, should satisfy demand of whose handicraft to water quality , water yield , water pressure act in close coordination that the preparation handicraft reserves corresponding to drain-pipe and

文献检索课程教学设计(全部)

《文献检索》课程教学设计 目录 绪论:文献(信息)检索的意义及基础 (2) 项目一科技文献检索方法和图书馆的科学利用 (8) 项目二常见化学化工科技论文的写作 (11) 项目三美国化学文摘的使用 (14) 项目四专利文献的查询 (17) 项目五标准文献的查询 (20) 项目六计算机信息检索的应用 (23) 项目七信息检索策略综合应用训练 (26)

徐州工业职业技术学院教学设计(讲稿)

教学内容与设计 绪论:文献(信息)检索的意义及基础 自我介绍 提问一:你会检索吗? 如果会,那么会用检索以下毕业专题的相关资料吗? ?杜仲叶中绿原酸的提取分离 ?有机废水处理工艺设计 ?蚕丝蛋白制备工艺研究 ?铁矿石含铁量测定方法新工艺 ?基因工程干扰素生产工艺研究 提问的目的:突出检索技术直接是为毕业专题服务,这是一门技术。提问二:信息检索课是什么? 学生如是说: 文献检索课程是井底之蛙的升降机,是雄鹰的翅膀,是横跨天堑的桥梁。 针对某一课题,通过电子检索查阅有关资料,才知道知识的浩瀚,才知道世界的宽广,才知道“山外青山,楼外楼”。 它是我在大学期间所学的最重要,最有用的课程之一,有了它,我们将会受益终生。教会我们一种方法,一种主动 了解外界,提高自己,放眼世界的方法。 检索不仅是我们学习的制胜法宝,更是一条贯穿我们生活的红线。正因为有了这门课的学习,现在大脑的检索意识 就比较强烈,越搜越快!前几天,问同学借自行车,他告 诉我车子大致地点,是永久牌,有车栏,略有一点蓝。到 了现场,脑海中一下就有了先找有栏的,再找蓝颜色的, 最后确定是不是永久的,很快就找到了。 我爱检索,就像爱自己的生命一样。 最后我想说,我们是幸运的!我们学到了一门真正有用的课,它对我的影响和帮助将是伴随我一身的。 提问三:借鉴与创新的关系? 科学研究是“站在前人肩膀上”的事业,而创新又是科学研究的灵魂,即要求“前无古人”。 时间分配 2min 引导学生回答 8min 10min 通过往届学生对信息检索课的评价能够激起学生学习这门课的兴趣,也可以突出这门课对个人的作用。 10min 通过提问让学生

差异化营销策略外文文献翻译

文献出处: Dalman, M. Deniz, and Junhong Min. "Marketing Strategy for Unusual Brand Differentiation: Trivial Attribute Effect." International Journal of Marketing Studies 6.5 (2014): 63-72. 原文 Marketing Strategy for Unusual Brand Differentiation: Trivial Attribute Effect Dalman, M. Deniz & Junhong Min Abstract This research investigates that brand differentiation creating superior values can be achieved not only by adding meaningful attributes but also meaningless attributes, which is called "trivial attribute effect." Two studies provided empirical evidences as following; first, trivial attribute effect creates a strong brand differentiation even after subjects realize that trivial attribute has no value. Second, trivial attribute effect is more pronounced in hedonic service category compared to the utilitarian category. Last, the amount of willingness to pay is higher when trivial attribute is presented and evaluated in joint evaluation mode than separate evaluation mode. Finally, we conclude with discussion and provide suggestions for further research. Keywords: brand differentiation, evaluation mode, service industry, trivial attribute Introduction Problem Definition Perhaps the most important factor for new product success is to create the meaningful brand differentiation that provides customers with superior values beyond what the competitors can offer in the same industry (Porter, 1985). Not surprisingly, more than 50 percent of annual sales in consumer product industries including automobiles, biotechnology, computer software, and pharmaceuticals are attributed to such meaningful brand differentiation by including new or noble attributes (Schilling &Hill, 1998). However, the brand differentiation that increases consumer preference is not only by introducing meaningful attributes but also meaningless attributes. For

给排水专业外文翻译

History of Water Supply Man’s search for pure water began in prehistoric times. Much of his earliest activity is subject to speculation. Some individuals might have led water where they wanted it through trenches dug in the earth, a hollow log was perhaps used as the first water pipe. Thousands of years must have passed before our more recent ancestors learned to build cities and enjoy the convenience of water pipes to the home and drains for water-carried wastes. Our earliest archeological records of central water supply and wastewater disposal date back about 5000 years, to Nippur of Sumeria. In the ruins of Nippur there is an arched drain with the stones set in full "voussoir" position, each stone being a wedge tapering downward into place. Water was drawn from wells and cisterns.An extensive system of drainage conveyed the wastes from the palaces and residential districts of the city. The earliest recorded knowledge of water treatment is in the Sanskrit medical lore and Egyptian Wall inscri ptions. Sanskrit writings dating about 2000 B.C. tell how to purify foul water by boiling in copper vessels,exposing to sunlight, filtering through charcoal, and cooling in an earthen vessel. The earliest known apparatus for clarifying liquids was pictureed on Egyptian walls in the fifteenth and thirteenth centuries B.C. The first picture represents the siphoning of either water of settled wine. A second picture shows the use of wick siphons in an Egyptian kitchen. The first engineering report on water supply and treatment was made in A.D. 98 by Sextus Julius Frontinus, water-commissioner of Rome. He produced two books on the water supply of Rome. In these he described a settling reservoir at the head of one of the aqueducts. His writings were first translated into English by the noted hydraulic engineer Clemens Herschel in 1899. In the eight century A.D. an Arabian alchemist,Geber,wrote a rather specialized treatise on distillation that included various stills for water and other liquids. The English philosopher Sir Francis Bacon wrote of his experiments on the purification of water by filtration, boiling, distillation and clarification by coagulation. This was published in 1627, one year after his death. Bacon also noted that clarifying water trends to improve health and increase the "pleasure of the eye". The first known illutrated descri ption of sand filters was published in 1685 by Luc Antonio Porzio, an Italian physician. He wrote a book on conserving the health of soldier in camps, based on his experience in the Austro-Turkish War. This was probably the earliest published work on mass sanitation.He described and illustrated the use of sand filters and sedimentation. Porzio also stated that his filtration was the same as "by those who built the wells in the Palace of the Doges in Venice and in the palace of Cardinal Sachett,at Rome." The oldest known archeological examples of water filtration are in Venice and the colonies she occupied. The ornate heads on the cisterns bear dates,but it is not known when the filters were placed.Venice,Built on a Series of islands, depended on catching and storing rainwater for its principal freshwater supply for over 1300 years. Cisterns were built and many were connected in stone-grated catch basins and then filtered through sand into cisterns. A comprehensive article on the water supply of Venice appeared in the Practical Mechanics Journal in 1863.The land area of Venice was 12.85 acres and the average yearly rainfall was 32 inches(in). Nearly all of this rainfall was collected in 177 public and 1900 private cisterns. These

外文文献—动画讲课教案

外文文献—动画

Animation Animation is the rapid display of a sequence of images of 2-D or 3-D artwork or model positions to create an illusion of movement. The effect is an optical illusion of motion due to the phenomenon of persistence of vision, and can be created and demonstrated in several ways. The most common method of presenting animation is as a motion picture or video program, although there are other methods. Early examples An Egyptian burial chamber mural, approximately 4000 years old, showing wrestlers in action. Even though this may appear similar to a series of animation drawings, there was no way of viewing the images in motion. It does, however, indicate the artist's intention of depicting motion. Five images sequence from a vase found in Iran There is no single person who can be considered the "creator" of film animation, as there were several people working on projects which could be considered animation at about the same time. Georges Méliès was a creator of special-effect films; he was generally one of the first people to use animation with his technique. He discovered a technique by accident which was to stop the camera rolling to change something in the scene, and then continue rolling the film. This idea was later known as stop-motion animation. Early examples of attempts to capture the phenomenon of motion drawing can be found in paleolithic cave paintings, where animals are depicted with multiple legs in superimposed positions, clearly attempting to convey the perception of motion. An Egyptian burial chamber mural , approximately 4000 years old, showing wrestlers in action. Even though this may appear similar to a series of animation drawings, there was no way of viewing the images in motion. It does, however, indicate the artist's intention of depicting motion. A 5,000 year old earthen bowl found in Iran.It has five images of a goat painted along the sides. This has been claimed to be an example of early animation. However, since no equipment existed to show the images in motion, such a series of images cannot be called animation in a true sense of the word. A Chinese zoetrope-type device had been invented in 180 AD. The phenakistoscope, praxinoscope, and the common flip book were early popular animation devices invented during the 19th century. These devices produced the appearance of movement from sequential drawings using technological means, but animation did not really develop much

建筑 给排水 外文翻译 英文文献 多层住宅建筑给排水设计的几个问题

译文来源:美国PE杂志建筑给排水工程师2010年第10期 The multilevel residential housing is given and drains off water several questions designed Summary : This text give and drain off water on multilevel residential housing design supply water the exertion of the tubular product , Way of laying of pipeline, water gauge produce family set up, establishment and air conditioner condensation water of pot-type boiler discharge issue goes on the discussion , And put forward some concrete views. Keyword: Skyscraper, supply water the tubular product , the pipeline is laid, The water gauge, the solar water heater The skyscraper is simple with its auxiliary facility, the fabrication cost is low, the characteristic such as being convenient of estate management, Receive the welcomes of the real estate developer and vast resident of small and medium-sized cities very much. How project planning and design of inhabited region, scientific and technological industry of comfortable house, lead the request according to 2000, Improve the design level of the house, build out a comfortable living space for each household, It is each designers duty. As the heart of the house --The kitchen, bathroom, is that the function is complicated, hygiene, safe and comfortable degree are expected much, It is miscellaneous to build, the space expecting much in technology. So, the designer must consider synthetically with the idea and method of global design that the kitchen, bathroom give installation of the drainage pipeline and equipment,etc. . Give and drain off water on skyscraper design supply water exertion, to lay pipeline of tubular product, water gauge produce family set up, establishment and empty of pot-type boiler now Transfer condensation water discharge issue discuss together with colleagues. ( 1)supply water tubular product select problem for use Traditional watersupply tubular product adopt zinc-plated steel tube generally, because zinc-plated steel tube exchange the corrosion, Use short-lived , use for and send domestic water can satisfied with water quality sanitary standard shortcoming, Ministry of Construction is popularizing the application of the feed pipe of plastics energetically . A lot of districts and cities have already expressed regulations: Forbid designing and using the zinc-plated steel tube , use widely the feed pipe of plastics. The plastics supply water In charge of compared with metal pipeline, light, it is fine to able to bear the intensity of keeping, Send obstruction little liquid , able to bear chemistry better to corrode performance, it is convenient to install, The steel energy-conservation of the province, merit of having long performance life etc.. Supply water and use plastics pipeline: Hard polyvinyl chloride( PVC-U), high density polyethylene( HDPE), pay and unite polyethylene( PEX) , modify the polypropylene( PP-R, PP-C), gather butene( PB), aluminium mould and compound and in charge of and the steel is moulded and compound and is managed etc.. Choice of tubular product economic comparative

相关文档
最新文档