&&& &&& **水利工程施工用表 目 录
CB01施工技术方案申报表 ···························································································· 1 CB02施工进度计划申报表 ···························································································· 2 CB03施工图用图计划报告 ···························································································· 3 CB04资金流计划申报表 ·························································································· 4 CB05施工分包申报表 ······························································································ 5 CB06现场组织机构及主要人员报审表 ············································································· 6 CB07材料/构配件进场报验单 ························································································ 7 CB08施工设备进场报验单 ···························································································· 8 CB09工程预付款申报表 ·························································································· 9 CB10工程材料预付款报审表 ······················································································· 10 CB11施工放样报验单 ····························································································· 11 CB12联合测量通知单 ···························································································· 12 CB13施工测量成果报验单 ·························································································· 13 CB14合同项目开工申请表 ·························································································· 14 CB15分部工程开工申请表 ·························································································· 15 CB16设备采购计划申请表 ·························································································· 16 CB17混凝土浇筑开仓报审表 ······················································································· 17 CB18工序(单元)工程施工质量报验单 ········································································ 18 CB19施工质量缺陷处理措施报审表 ·············································································· 19 CB20事故报告单 ····························································································· 19 CB21暂停施工申请报告 ···················································································· 20 CB22复 工 申 请 表 ································································································ 21 CB23变更申请报告 ······························································································ 22 CB24施工进度计划调整申请表 ···················································································· 23 CB25延长工期申报表 ································································································ 24 CB26变更项目价格申报表 ·························································································· 25 CB27索 赔 意 向 通 知 ··························································································· 26 CB28索 赔 申 请 报 告 ··························································································· 27 CB29工程计量报验单 ························································································ 28 CB30计日工工程量签证单 ·························································································· 29 CB31工程价款月支付申请书( 年 月) ·································································· 30 CB32 施工月报( 年 月) ················································································ 31 CB32附表1 材料使用情况月报表 ················································································ 33 CB32附表2 主要施工机械设备情况月报表 ···································································· 34 CB32附表3 现场施工人员情况月报表 ·········································································· 35 CB32附表4 施工质量检验月汇总表 ············································································· 36 CB32附表5 工程事故月报表 ·············································································· 37 CB32附表6 完成工程量月汇总表 ················································································ 38 CB32附表7 施工实际进度月报表( 年 月) ························································ 39 CB33 验 收 申 请 报 告 ··························································································· 40 CB34 报 告 单 ·································································································· 41 CB35 回 复 单 ································································································· 42 CB36 完工/最终付款申请表 ························································································ 43 注:依据《水利工程建设项目施工监理规范SL288-2003》编制,使用时应注意剪切后的排版和字体。
水利部 2016年版《水利水电工程单元工程施工质量验收评定表及填表说明》上册
编著者 2015 年 12 月
填表基本规定
《水利水电工程单元工程施工质量验收评定表及填表说明》(以下简称《质评表》)是检 验与评定施工质量及工程验收的基础资料,是施工质量控制过程的真实反映,也是进行工程维 修和事故处理的重要凭证。工程竣工验收后,《质评表》作为档案资料长期保存。
1.单元(工序)工程施工质量验收评定应在熟练掌握《水利水电工程单元工程施工质量验 收评定标准》(SL 631~SL 637—2012、SL 638~SL 639—2013)和有关工程施工规程规范及 相关规定的基础上进行。
5.验收评定表中的检查(检测)记录可以使用黑色水笔手写,字迹应清晰工整;也可以使 用激光打印机打印,输入内容的字体应与表格固有字体不同,以示区别,字号相同或相近,匀 称为宜。质量意见、质量结论及签字部分(包括日期)不可打印。施工单位的三检资料和监理 单位的现场检测资料应使用黑色水笔手写,字迹清晰工整。
张全喜
刘金山 李Байду номын сангаас 余少林 张颖 费凯 涂雍 戚波 窦宝松
韩新
齐秀琴 李恒山 宋新江 林京 贺永利 黄玮 韩连超 谭辉
水利工程施工常用表格
E.3 水利施工经常使用表格汇总之马矢奏春创作E.3.1承包人用表目录CB01施工技术方案申报表(承包[ ]技案号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核后,随同审批意见承包人、监理机构、发包人、设代机构各1份。
CB02施工进度计划申报表(承包[ ]进度号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核后,随同审批意见承包人、监理机构、发包人、设代机构各1份。
CB03施工用图计划陈述(承包[ ]图计号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核后,随同审核意见承包人、监理机构、发包人、设代机构各1份。
CB04资金流计划申报表(承包[ ]资金号)合同名称:合同编号:承包人:单位:说明:本表一式份,由承包人填写,监理机构审核后,随同审核意见承包人、监理机构、发包人各1份。
CB05 施工分包申报表(承包[ ]分包号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核、发包人批准后,随同审批意见承包人、监理机构、发包人各1份。
CB06 现场组织机构及主要人员报审表(承包[ ]机人号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核后,随同审核意见承包人、监理机构、发包人各1份。
CB07资料/构配件进场报验单(承包[ ]材验号)说明:本表一式份,由承包人填写,监理机构检验、审核后,返回承包人2份,监理机构、发包人各1份。
CB08施工设备进场报验单(承包[ ]设备号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审签后,承包商人、监理机构、发包人各1份。
CB09工程预付款申报表(承包[ ]工预付号)合同名称:合同编号:承包人:注:本表一式份,由承包人填写,监理机构审批后,随同审批意见承包人2份,监理机构、发包人各1份。
CB10工程资料预付款报审表(承包[ ]材预付号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,作为CB 31表的附表,一同流转,审批结算时用。
2016年新规范表格水利水电工程质量评定表、三检表
2016年新规范表格水利水电工程质量评定表、三检表作者: 日期:单元工程施工质量报验单(承包[2015]质报23号)致: 福建省江海工程咨询有限公司C20埋石砼挡墙HZ0+479.32〜HZ0+569.32段(单元编码C-1-46 )单元工程已按合同要求完成施经自检合格,报请核验。
工,C20埋石砼挡墙HZ0+479.32〜HZ0+569.32段(单元编码C-1-46 )单元工程质量评定表附:承包人:三明市水利水电工程有限公司项目经理:日期:2015 年10月24日经核验,C20埋石砼挡墙HZ0+479.32〜HZ0+569.32段(单元编码C-1-46 )单元工程的质量: □合格;□按附言提供补充材料、证明文件或重做、补做检验;□不合格,提交《施工质量缺陷处理措施报审表》。
附言:监理机构:福建省江海工程管理有限公司监理工程师:日期:年月日合同名称:泉州市晋江防洪工程(一期)永春湖洋蓬莱堤段C1标合同编号:说明:本表一式份,由承包人填写,监理机构审签后,承包人2份,监理机构、发包人各水利水电工程表2.1水利水电工程表 2.1.1主控项目检验结果全部符合质量标准要求,一般项目逐项检验结果全部符合质量标准要求。
工序质量等级评定为:合格班组初检意见: 施工队(员)复检意见: 质检员终检意见:水利水电工程表 2.1.2柱、墙轴线 位置 允许偏差± 10 mm/ / / 垂直 度允许偏差± 5 mm///4结构物边线与设 计边线外露表面 内模板允许偏差-10 mm 〜0,V 外模板允许偏差 0〜+10 mm 设计高2500,宽 2050)高:2503, 2503, 2504, 2502, 2501, 2503 宽:2055, 2052, 2053, 2051, 2053, 205112 100%隐蔽内面 允许偏差15 mm / /5预留孔、洞尺寸 及位置孑L 、洞尺寸 允许偏差-10 mm/ / / 孔洞位 置允许偏差± 10 mm// / 1模板平整度、相 邻两板面错台夕卜露表 面钢模:允许偏差2 mm ; 木模:允许偏差3 mm ;V 3, 2, 5, 1 , 2, 1 , 2, 4, 2, 3,1,1,111 84.6% 隐蔽内 面允许偏差5mm// / 2 局部平整度外露表面 钢模:允许偏差3 mm ; 木模:允许偏差5 mm ;V 5,2 , 4, 1 , 2 , 6, 5 , 2 , 5 , 4 , 3,6 ,11184.6%隐蔽内 面允许偏差10 mm// / 3 板面缝隙夕卜露表 面 钢模:允许偏差1 mm ; 木模:允许偏差2 mm ;V3 , 2, 1, 2 , 2, 1 , 1, 2, 1, 19 90.0% 隐蔽内 面允许偏差2 mm// / 4 结构物水平断面 内部尺寸 允许偏差± 20 mm / / / 5 脱模剂涂刷产品质量符合标准要求,涂刷均匀, 无明显色差 脱模剂产品质量符合标准要求,涂刷均 匀,无明显色差 / / 6 模板外观 表面光洁、无污物 表面光洁、无污物//般 项 目 主控项目检验点100%合格,一般项目逐项检验点的合格率 86.1%,且不合格点不集中分布。
水利工程施工规范常用表格DOC 54页
施工监理工作常用表格目录(承包[ ]技案号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、设代机构各1份。
(承包[ ]进度号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、设代机构各1份。
(承包[ ]图计号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、设代机构各1份。
CB04 资金流计划申报表(承包[ ]资金号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人各1份。
CB05 施工分包申报表(承包[ ]分包号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审核、发包人批准后,随同审批意见,承包人、监理机构、发包人各1份。
CB06 现场组织机构及主要人员报审表(承包[ ]机人号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审核意见,承包人、监理机构、发包人各1份。
CB07 材料/构配件进场报验单(承包[ ]材验号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,承包人2份、监理机构、发包人各1份。
CB08 施工设备进场报验单(承包[ ]设备号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,承包人2份、监理机构、发包人各1份。
CB09 工程预付款申报表(承包[ ]工预付号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同付款证书,承包人2份、监理机构、发包人各1份。
CB10 工程材料预付款报审表(承包[ ]材预付号)合同名称:合同编号:说明:本表一式份,由承包人填写。
作为CB31表的附表,一同流转,审批结算时用。
CB11 施工放样报验单(承包[ ]放样号)合同名称:合同编号:说明:本表一式份,由承包人填写。
水利工程施工常用表格
E。
3 水利施工常用表格汇总E.3.1承包人用表目录CB01 施工技术方案申报表(承包[ ]技案号)合同名称: 合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核后,随同审批意见承包人、监理机构、发包人、设代机构各1份。
CB02 施工进度计划申报表(承包[ ]进度号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核后,随同审批意见承包人、监理机构、发包人、设代机构各1份.CB03 施工用图计划报告(承包[ ]图计号)合同名称: 合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核后,随同审核意见承包人、监理机构、发包人、设代机构各1份.CB04 资金流计划申报表(承包[ ]资金号)合同名称:合同编号:承包人:单位:说明:本表一式份,由承包人填写,监理机构审核后,随同审核意见承包人、监理机构、发包人各1份.CB05 施工分包申报表(承包[ ]分包号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核、发包人批准后,随同审批意见承包人、监理机构、发包人各1份。
CB06 现场组织机构及主要人员报审表(承包[ ]机人号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审核后,随同审核意见承包人、监理机构、发包人各1份。
CB07 材料/构配件进场报验单(承包[]材验号)说明:本表一式份,由承包人填写,监理机构检验、审核后,返回承包人2份,监理机构、发包人各1份。
CB08 施工设备进场报验单(承包[ ]设备号) 合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审签后,承包商人、监理机构、发包人各1份.CB09 工程预付款申报表(承包[ ]工预付号)合同名称:合同编号:承包人:注:本表一式份,由承包人填写,监理机构审批后,随同审批意见承包人2份,监理机构、发包人各1份.CB10 工程材料预付款报审表(承包[ ]材预付号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,作为CB 31表的附表,一同流转,审批结算时用。
水利水电工程施工全表格
表1.1岩石边坡开挖单元工程质量评定表单位工程名称单元工程量分部工程名称施工单位单元工程名称、部位检验日期年月日项次检查项目质量标准检验记录1 △保护层开挖浅孔、密孔、少药量、火炮爆破2 △平均坡度小于或等于设计坡度3 开挖坡面稳定、无松动岩块项次检测项目设计值允许偏差(cm)实测值合格数(点)合格率(%)1 坡脚标高+20 -102 坡面局部超欠挖斜长≤15m+30-203斜长>15m+50-30检测结果共检测点,其中合格点,合格率% 评定意见单元工程质量等级主要检测项目全部符合质量标准。
一般检查项目。
检测项目实测点合格率%。
施工单位年月日建设(监理)单位年月日表1.2岩石地基开挖单元工程质量评定表单位工程名称单元工程量分部工程名称施工单位单元工程名称、部位检验日期年月日项次检查项目质量标准检验记录1 △保护层开挖浅孔、密孔、少药量、火炮爆破2 △建基面无松动岩块,无爆破影响裂隙3 △断层及裂隙密集带按规定挖槽,槽深为宽度的1~1.5倍。
规模较大时,按设计要求处理4 △多组切割的不稳定岩体按设计要求处理5 岩溶洞穴按设计要求处理6 软弱夹层厚度>5cm者,挖至新鲜岩层或设计规定的深度7 夹泥裂隙挖1~1.5倍断层宽度,清除夹泥,或按设计要求处理项次检测项目设计值允许偏差(cm)实测值合格数(点)合格率(%)1无结构要求或无配筋坑(槽)长宽<5m +20 -102 5~10m +30 -203 10~15m +40 -304 >15m +50 -305 坑(槽)底部标高+20 -106 垂直或斜面平整度207有结构要求或有配筋坑(槽)长宽<5m +10 -08 5~10m +20 -09 10~15m +30 -010 >15m +40 -011 坑(槽)底部标高+20 -012 垂直或斜面平整度15检测结果共检测点,其中合格点,合格率% 评定意见单元工程质量等级主要检查项目全部符合质量标准。
一般检查项目。
施工水利工程全套表格
施工水利工程全套表格 Company number【1089WT-1898YT-1W8CB-9UUT-92108】E.3 施工监理工作常用表格目录E.3.1承包人用表目录E.3.1承包人用表目录E.3.2监理机构用表目录E.3.2监理机构用表目录CB01 E.4、施工监理常用表格施工技术方案申报表(承包[2012 ]技案03号)合同名称:大方岔河水库灌溉工程合同编号:HS-2011-说明:本表一式份,由承包人填写,监理机构审核后,随同审批意见承包人、监理机构、发包人、设代机构各1份。
CB02 施工进度计划申报表(承包[ ]进度号)合同名称:广西蒙山县瓦冲水库除险加固工程合同编说明:本表一式份,由承包人填写,监理机构审核后,随同审批意见承包人、监理机构、发包人、设代机构各1份。
CB03 施工图用图计划报告(承包[ ]图计号)说明:本表一式份,由承包人填写,监理机构审核后,随同审核意见承包人、监理机构、发包人、设代机构各1份。
CB04 资金流计划申报表(承包[ ]资金号)合同名称:合同说明:本表一式份,由承包人填写,监理机构审签后,随同审核意见,承包人、监理机构、发包人各1份。
CB05 施工分包申报表(承包[ ]分包号)说明:本表一式份,由承包人填写,监理机构审核、发包人批准后,随同审批意见承包人、监理机构、发包人各1份。
CB06 现场组织机构及主要人员报审表(承包[ ]机人号)说明:本表一式份,由承包人填写,监理机构审核后,随同审核意见承包人、监理机构、发包人各1份。
CB07 材料/构配件进场报验单(承包[ ]材验号)说明:本表一式份,由承包人填写,监理机构审签后,返回承包人2份,监理机构、发包人各1份。
CB08 施工设备进场报验单(承包[ ]设备号)合同名称:合同编号:承包人:说明:本表一式份,由承包人填写,监理机构审签后,承包商人、监理机构、发包人各1份。
CB09 工程预付款申报表(承包[ ]工预付号)注:本表一式份,由承包人填写,监理机构审批后,随同审批意见承包人2份,监理机构、发包人各1份。
水利工程施工规范全套表格
附录E施工监理工作常用表格E.1表格讲明E.1.1表格可分为以下两种类型:1承包人用表。
以CB××表示。
2监理机构用表。
以JL××表示。
E.1.2表的标题〔表名〕应采纳如下格式:注2:“施工放样报验单〞——表格名称。
注3:“承包[]放样号〞——表格编号。
其中①“承包〞:指该表以承包人为填表人,当填表人为监理机构时,即以“监理〞代之。
②当监理工程范围包括两个以上承包人时,为区分不同承包人的用表,“承包〞可用其简称表示。
③[]:年份,[2003]表示2003年的表格。
④“放样〞:表格的使用性质,即用于“放样〞工作。
⑤“号〞:一般为3位数的流水号。
如承包人简称为“华安〞,那么2021年承包人向监理机构报送的第3次放样报表可表示为:E.2表格使用讲明E.2.1监理机构可依据施工工程的规模和复杂程度,采纳其中的局部或全部表格;要是表格不能满足工程实际需要时,可调整或增加表格。
E.2.2各表格足注中所列单位和份数为全然单位和推举份数,工作中应依据具体情况和要求予以具体指定各类表格的报送单位和份数。
E.2.3相关单位都应明确文件的签收人。
E.2.4“CB01施工技术方案申报表〞可用于承包人向监理机构申报关于施工组织设计、施工措施方案、专项施工方案、度汛方案、灾难应急预案、施工工艺试验方案、专项检查试验方案、工程测量施测方案、工程放样方案和方案、变更实施方案等需报请监理机构批准的方案。
E.2.5承包人的施工质量检验月汇总表、工程事故月报表除作为施工月报附表外,还应按有关要求另行单独填报。
E.2.6表格中凡属部门负责人签名的,工程经理都可签署;凡属监理工程师签名的,总监理工程师都可签署。
表格中签名栏为“总监理工程师/副总监理工程师〞、“总监理工程师/监理工程师〞和“工程经理/技术负责人〞的可依据工程特点和治理要求视具体授权情况由相应人员签署。
E.2.7监理用表中的合同名称和合同编号指所监理的施工合同名称和编号。
水利工程施工规范常用表格
施工监理工作常用表格目录(承包[ ]技案号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、设代机构各1份。
(承包[ ]进度号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、设代机构各1份。
(承包[ ]图计号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、设代机构各1份。
CB04 资金流计划申报表(承包[ ]资金号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人各1份。
CB05 施工分包申报表(承包[ ]分包号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审核、发包人批准后,随同审批意见,承包人、监理机构、发包人各1份。
CB06 现场组织机构及主要人员报审表(承包[ ]机人号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审核意见,承包人、监理机构、发包人各1份。
CB07 材料/构配件进场报验单(承包[ ]材验号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,承包人2份、监理机构、发包人各1份。
CB08 施工设备进场报验单(承包[ ]设备号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,承包人2份、监理机构、发包人各1份。
CB09 工程预付款申报表(承包[ ]工预付号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同付款证书,承包人2份、监理机构、发包人各1份。
CB10 工程材料预付款报审表(承包[ ]材预付号)合同名称:合同编号:说明:本表一式份,由承包人填写。
作为CB31表的附表,一同流转,审批结算时用。
CB11 施工放样报验单(承包[ ]放样号)合同名称:合同编号:说明:本表一式份,由承包人填写。
水利工程资料施工全套表格模板
CB01施工技术方案申报表(承包[]技案号)说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理CB02施工进度计划申报表(承包[]进度号)说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理CB03施工图用图计划报告(承包[]图计号)说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理CB04资金流计划申报表(承包[]资金号)说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、设代机构各1份。
CB05施工分包申报表(承包[]分包号)说明:本表一式份,由承包人填写。
监理机构审核、发包人批准后,随同审批意见,承包人、监理机构、发包人各1份。
CB06现场组织机构及主要人员报审表(承包[]机人号)说明:本表一式份,由承包人填写。
监理机构审签后,随同审核意见,承包人、监理机构、发包人各1份。
CB07材料/构配件进场报验单(承包[]材验号)说明:本表一式份,由承包人填写。
监理机构审签后,承包人2份,监理机构、发包人各1份。
CB08施工设备进场报验单(承包[]设备号)说明:本表一式份,由承包人填写。
监理机构审签后,承包人、监理机构、发包人各1份。
CB09工程预付款申报表(承包[]工预付号)说明:本表一式份,由承包人填写。
监理机构审签后,承包人人各1份。
CB10工程材料预付款付款报审表(承包[]材预付号)说明:本表一式份,由承包人填写。
作为CB11施工放样报验单(承包[]放样号)说明:本表一式份,由承包人填写。
监理机构审签后,承包人人各1份。
CB12联合测量通知单(承包[]联测号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,承包人、监理机构、发包人各1份。
CB13施工测量成果报验单说明:本表一式份,由承包人填写。
监理机构审签后,承包人、监理机构、发包人各1份。
CB14合同项目开工申请表说明:本表一式份,由承包人填写。