Discussion on building water supply and drainage construction of commonproblems and Solutions浅谈建筑给排水施工中的常见问题及解决孙峰Abstract:Building water supply and drainage construction quality directly affects the building use function. In this paper, combined with the supervision of water supply and drainage engineering practice, for building water supply and drainage of common problems in construction were summarized and analyzed.Key words: building water supply and drainage construction qualityOur country national economy actual strength increases ceaselessly, construction industry develops rapidly, and constantly improve the level of overall construction of buildings. Construction equipment perfection degree and design level is the embodiment of building construction quality and an important symbol of modernization level, inside of the building water supply and drainage engineering is an important part of construction equipment, its technical level and advanced directly affects the using function of building, and people life, health, the environment, security. With the improvement of people's living standard, people in addition to the building safety, durability and economy have certain requirements, at the same time on the construction of the comfort, use requirements are also more attention, especially for the residential building energy saving and new energy utilization, Chuwei technology, pipeline technology, environment and security technology etc have higher requirements, these requirements in addition to the design and materials, equipment selection, construction greatly need assurance of installation quality. The quality of construction quality, directly affects the normal operation of the building water supply and drainage system. China's economic construction and development, various types of residential lots, building water supply and drainage technology of rapid development. However, with the increase of water supply and drainage engineering, also appeared some problems needed to be paid attention to, if not handled properly, will give householder brings a lot of unnecessary trouble. Therefore, the study on how to avoid water supply and drainage construction problems easy to occur is verynecessary. In the actual construction of water supply and drainage engineering construction, except in the raw materials and so on the objective factor to control the quality of water supply and sewerage works, improve employees' professional level, in strict accordance with the rules and regulations, standard operation, can be less problems, control of water supply and drainage project construction quality. Due to the level of management of construction enterprises, construction of personnel quality, building water supply and drainage construction quality is put in very big difference. Here in the construction process should pay attention to the problem is discussed:1 Living water supply systemAt present construction is widely used in aluminum-plastic composite pipe and polypropylene random copolymerization polypropylene ( PP - R ) tube. Plastic pipe has the advantages of light weight, no rust, scale, manufacturing, low energy consumption, smooth inner wall, hydraulic condition is superior, quality health, no pipeline two pollution, low labor intensity, saving installation of comprehensive construction cost advantages. PP - R water pipe connecting method is the use of fusion welding, aluminum-plastic composite pipe made of copper connection. The former applies for surface mounting, the latter applies to the dark. But there are some problems in the construction of which need special attention.(1) In the vertical tube lead-out branch tube three through parts arranged at the supporting point, the intermediate support is still in accordance with the provisions set. In the installation of pipelines should be considered in the pipeline of linear expansion, PP - R plastic water supply pipe expansion coefficient than the metal tube, wall concealed piping due to wall finally with cement mortar cement mortar filling pipeline, friction and plastic pipe special good creep effect, so that the shaft extension into radial change, therefore, block wall pipeline, can be considered linear expansion. For the pipeline, when the distance is longer, should consider adopting a telescopic device and the angle of natural compensation(2) Outdoor installed plastic water supply pipe must have reliable shading or heat preservation measures, through the pipeline settlement joints for compensating treatment. Because plastic pipe anti aging performance have certain limit, when exposed to install, long-term sun exposure can accelerate aging of plastic material, it should be considered to take effective shading or insulation measures. In addition the pipeline settlement joints shall be taken compensation measures, or easy to make pipeline rupture, appeared the phenomenonof water leakage(3)In the kitchen, Wei bovine apparatus for concentrating bathrooms, should adopt the water separator. Using plastic tube as a cold, hot water pipe concealed in floor slab of concrete in plastic pipe, due to the linear expansion coefficient of metal pipe to relatively large, because the water temperature or the ambient temperature changes, the expansion and contraction of the length change of large value. For branch pipe or pipe joint pipe, the higher chance of leakage. Water separator is a kind of multiple branch joint water distribution, it uses multiple unidirectional cloth tube, each a water distribution pipe through the water and sanitary ware and the tap connection, to reduce or cancel the concealed pipes used in branch pipe or pipe joint.(4) pipeline crossing roof slab should be set casing, through the roof should be used when the metal casing, height must meet the standard requirements. The casing and the cracks without perfusion of fine stone concrete, shall not use the asphalt in Yau Ma Tei wire packing seal. Otherwise, if the floor area of water sewage easily along the pipe wall infiltration into the submucosa.(5) the role of automatic exhaust valve. In no time delay self-closing valve of the squat toilet building water supply system, such as schools, hotels, office buildings and other force in water supply pipe system, if the top with self-closing valve can well control the flow of water, but not very good control of airflow. When the system is cut off, water pipes often accumulate a large amount of air. System after water supply pipe, air may be compressed to the tube at the top of water to form a compressed air zone. When someone is pressed delay self-closing valve button, then the compressed air with water gushing out of the closet, often within the dirt blowing to above ground, even spilled onto the clothes closet.2 Drainage system(1)The UPVC pipe wall is white, very susceptible to pollution, so the use of the process should pay attention to protection, in the pipeline in place should be promptly after the plastic packaging bag, to be removed after the completion of the project.(2) Drainage pipe out door horizontal pipe and vertical pipe connection should be used when the two45. Elbow instead of90. Elbow, which is beneficial to the drainage. There are also some engineering design for the three plus examination export method. In some projects, product quality, leading to the three links are often damaged, inconvenient repair. So in thevertical pipe and main pipe is connected with the fixed support, parts. Vertical pipe through floor roof should be fixed as supporting points, and with sheath.(3) In the legislative branch, floor, to do the protection work. For UPVC tube light weight, should be timely plugging holes in floors, planted bracket. There are a number of projects, because there was no time to fill the hole plugging holes, civil engineering, causing destruction and pipeline slope and verticality of affected. The correct approach is to stand pipe after completion of construction, straightening and planted bracket, with a good fine stone concrete plugging hole. Branch floor, planted set hanger and plugging holes. Because the floor, floor drain and the straight tube exposed to the ground, easily damaged, precautions should be taken. The specific approach is: in the floor drain and the straight tube around the100arm UPVC tube saw small short circle in the floor drain and straight around, with a fine stone concrete protection, height of not more than civil screed. For ease of maintenance, pipe water trap should be above the floor slab, for apparatus with water storing bend. Because the UPVC pipeline is light weight, thin tube wall, should pay attention to using a muffler noise reduction function fitting.(4)Installed to meet the requirements. The interior floor is mounted high above the surface, will cause the water leakage is too low, on the ground to form a pit, affect the surface clean and inconvenience in walking.(5)Air nozzle shall be located in a building ( such as eaves cornice took part, balcony and canopy ) above, otherwise cause odor accumulation. In accordance with the relevant standard requirements, the people often activity of roof, roof vent pipe extends the height of not less than 2m, and try to set bracket.(6)High-rise building in the UPVC ~ B pipe, without taking the measures to prevent fire from spreading. According to the" hard vinyl chloride building drainage pipeline engineering" ( cJJ / T29 - 98) Regulations: high-rise buildings indoor drainage pipelines that apply settings and big diameter or equal to 11Omm, in vertical pipe through the floor should be set to fire the casing or fire blocking ring, to prevent the fire spreading to the upper layer through a pipeline.(7)The floor drain and trap with. No provisions for floor drain must set up a trap, but it can affect users. The general water supply and drainage standard atlas will take seal circular bell type floor drain to a, B, C, Ding Si, although the standard of water seal section height to makespecific provision, but there is a water storage, water due to water evaporation and destroyed. Manufacture and installation and often fails to meet the design requirements. All indoor undertake a fecal sewage drainage floor drain, shall be set the trap, this can effectively prevent odor phenomenon.(8) Sewage emergency discharge tube. For kitchen and toilet adjacent residential, kitchen, toilet is if separate drainage system, is straight at the bottom of two system for emergency discharge unicom. The correct approach is to lead a floor drain from the kitchen and toilet pipe or by a toilet to kitchen pipe system. Its purpose is to once - side discharge pipe suddenly jam, still discharge sewage overflows when the ground floor drain into another system from the outside, but not to the other indoor room large area sewage soaks inundates.3 Fire water supply system(1) The design of automatic sprinkler system for pipeline connection made the trench should be used to clamp connections, or wire joint, flange connection. The current widespread use of the automatic sprinkler system, generally with galvanized steel pipe galvanized pipe, and larger in diameter than the5Omm, pipe parts of poor quality, construction difficulty. Diameter of1OOmm welding work, will destroy the galvanized layer, causing the two galvanized, the effect is not ideal. As the hoop connection parts, to avoid the above problem, and the construction is simple, without welding, and the grooves can be precast. Now the groove type clamps connecting piece is stereotypes products, mature technology, spare parts complete, quality assurance. When the proposed pipeline diameter is larger than 50mm, the groove type clamps connecting piece.(2) As the applicator interface diameter is 15mm, so some construction spaces using15ram galvanized steel pipe small vertical tube connected with the nozzle, effects of fire extinguishing water ability, should adopt the25mm diameter pipe with different diameter pipe hoop. Some engineering support, support installation is not standardized, not according to the specified distance setting, defenseless and Akira bracket, directly affect water effect, should be strictly in accordance with the relevant standard, set Branch hanger.(3) Network to carry out maintenance and leakage test of strength test is performed in two steps. Some construction unit only to the network leakage test or test the pressure does not meet the requirements of design and codes, this will give the normal operation of the system brings hidden trouble.(4) Banned the use of plastic water supply pipe for fire water supply pipe, or in a building plastic water supply pipeline and fire water supply pipeline. Because plastic pipe heating after reduced intensity, fire will cause the pipeline damage, will not play the role of fire water supply. Plastic water supply pipe and fire pipes, fire, damage to the plastic pipe, easy leakage, there is no guarantee that a fire water and hydraulic pressure.(5) Must be in conformity with the requirements of fire hydrant installation. Some concealed in brick wall of fire hydrant boxes above the hole without lintel, by loading body is deformed, causing the box door is open. In addition the construction of some units to randomly change the fire hydrant at the end position of a preformed hole, and welding and cutting hole, leading to the installation, hydrant mouth can not be with the wall into 45or 90degree angle; or with the surrounding distance is too small, causing the fire hose cannot be installed to a fire hydrant or the tape to form bending effect of water.4 Water supply and drainage noise solutionIn addition to the requirements of water supply and drainage pipe and equipment layout should be consistent and building structure, water supply and drainage noise reduction. During construction, attention to details, can effectively reduce the noise generation.(1) In order to reduce the water hammer occurrence possibility, the outlet valve Shuizui and not using the rapid opening and closing of the water supply fittings.(2) In order to reduce the flow induced vibration noise, according to the condition of the water supply pipe and selection of density of sanitary ware, and according to the standard setting of pipe support and hanger. Different pipes with different support spacing requirements; design pipeline fixing bracket, also should consider from pipeline temperature changes caused by the expansion and contraction force.(3) To reduce the cavitation noise of ascending and descending pipe, for heating system of water distribution pipe top and to elevation of the pipe section should be equipped with automatic exhaust valve; downfeed system can use the highest water distribution point when a branch is deflated splitting meter, in the water vertical tube top with automatic exhaust valve.(4) Drainage system reduces the vertical pipe and horizontal branch connection angle, or a branch connecting the upper part special parts, reduce the horizontal branch pipe to water flow, to avoid the water jump phenomenon, thereby reducing the drainage noise.(5) Drainage pipe and drainage standpipe connection should be45 degrees,60 degreeselbow, three links, or set up a special accessories. Connections of the elbow should be composed of 2to 45 degrees elbow, and shall be on the elbows set supporting pier or bracket. In this way, can slow down the drain pipe and the drain pipe of the water flow in the water flow and vertical draining pipe wall impact noise.(6) To increase the horizontal trunk pipe and vertical pipe and horizontal trunk pipe connecting bend radius of curvature, or installed with reduced height of hydraulic jump, stable drainage pipe pressure function lower special accessories, to improve the horizontal trunk pipe drainage condition.5 Conclusion:Living, live as the mankind indispensable material conditions, is restricted by social productivity, at the same time, is also the social productivity development level indicates one of. From the initial human ancestor looking for natural caves and trees do sacrifice body are today a multi-storey and high-rise residential buildings and supporting a full range of public facilities of residential area, residential construction technology, marked the social productive forces to a new level. Today, our life has stridden to well-off, residential construction quality, indoor and outdoor environment improvement, so that our country's housing situation in recent years have varying degrees of change. In residential construction, although our country starts later, but the government has pledged, formulate corresponding policies, government departments to organize and mobilize all aspects involved in residential development plan, planning, design, construction and management. No doubt, this is a huge task, need government, the construction industry and the vast majority of the practitioners, down-to-earth to make unremitting efforts. Upgrade and improvement of our people 's living environment and living conditions. With the water supply and drainage pipe of continuous improvement, we should constantly sum up the design and installation of the experience lesson in the process, improve the general level of the installation. Professional supervision engineer shall be in this play a greater role in the. In the new century, building water supply and drainage will shoulder the historical responsibility, facing new challenges. Building water supply and drainage will be more prominent in the people-oriented principle, and will focus on the adjustment to the civil and industrial construction to pay equal attention to both, public buildings and residential buildings, water supply and water supply and water, water pressure, and water quality to pay equal attention to, direction, into a comprehensive, balanced,practical, safe development road.References[1] Li Wenqing, Shao Zhuang. Building fire water supply and some problems in construction. Heilongjiang water conservancy science and technology,2006(4).[2] Chen Zhentie. Building water supply and drainage specialty on the coordination [J ]. Water supply and drainage, l996(11).[3] king growth. Building water supply and sewerage engineering ( Fifth Edition ) [ M]. Beijing: China Building Industry Press,2005[4] GBJ242 82heating and sanitary engineering code for construction and acceptance of.[5] CJJ / T29 - 98building drainage pipeline project technical specification of hard vinyl chloride.[6] GB5026l96automatic sprinkler systems code for construction and acceptance of.浅谈建筑给排水施工中的常见问题及解决孙峰摘要:建筑给排水施工质量的好坏直接影响建筑物的使用。

建筑给排水工程施工管理问题与改进策略分析

建筑给排水工程施工管理问题与改进策略分析

建筑给排水工程施工管理问题与改进策略分析摘要:随着中国建筑业的快速发展,越来越多的建筑项目出现在城市中,在设计各种建筑项目时,重要的是要考虑建筑项目中给排水系统的施工质量。

在设计建筑给排水系统工程时,设计组织人员应尽量将建筑给排水工程的一些先进适用技术与施工中的各种实际技术需求相结合,以及在给排水工程项目中遇到的关键问题,以提高建筑工程的整体质量,提高给排水工程在建筑工程中的性能。

关键词:建筑给排水工程;施工管理;问题;改进策略1建筑给排水工程施工中存在的问题1.1施工人员的专业不足从目前的施工情况来看,建筑工程给排水最大的安全技术隐患主要来自施工人员的专业知识、技术和素质参差不齐。

大量施工人员对给排水系统的具体技术理解仍存在一定的模糊性和不确定性,导致给排水系统施工安装不专业、不科学、不可靠。

此外,由于工人的专业文化知识水平相对较低,他们无法正确理解过于复杂的施工图设计,导致对施工的模糊处理。

这直接导致了建筑工程整体质量管理中的许多问题,可能导致混乱、漏水、安装现场尺寸不准确,以及无法及时正确安装建筑给排水系统管道。

此外,对于质量监督管理人员来说,如果他们不具备足够的专业技术素质,他们可能无法稳定地对施工进行质量监督,这可能会导致施工过程中质量管理存在漏洞,导致项目施工过程的整体质量不令人满意。

1.2施工中使用的材料质量不合格给排水工程材料一直是建筑给排水工程施工中最基础的部分。

无论实际情况如何,都要确保整个给排水工程能够保质保量地完成,并严格控制建筑施工中使用的材料。

目前,由于我国给排水材料市场经济的快速发展,一些供应商意识到材料市场的可开发性和潜在发展,对各种工程材料和产品进行暗中操作,导致建筑材料的实用性和安全性缺乏保障,以及给排水工程的整体质量,导致建筑工程未能充分发挥正常功能,无法满足人们的需求。

1.3施工过程中的管理不规范一些工程建设单位为了降低施工管理成本或缩短工期,故意扰乱施工顺序或不严格执行行业标准程序,导致工程实施质量缺乏有效保障。

分析建筑给排水设计的常见难点及解决策略

分析建筑给排水设计的常见难点及解决策略

分析建筑给排水设计的常见难点及解决策略水是生命之源,是生态环境的控制性因素之一,是人类赖以生存和社会经济发展的命脉。

人在日常生活中需要喝水,洗漱需要用水,可见水在人们的生活中发挥着不可替代的作用。

水在建筑中也一样发挥着重要的作用,建筑给排水工程的意义是为居民提供生活用水,也将建筑内部所有的生活污水及时排出。

给排水工程是建筑能够正常发挥功能的基础保证。

一、建筑给排水设计的常见难点我国城市的建筑都具有面积大、用电设备多、供电要求高、人员集中等特点,这些都给建筑给排水设计的安全性及可靠性提出了很高的要求。

但是,在实际中,建筑给排水系统常会出现一些普遍性问题,需要我们在进行合理分析后,才能提出有效的设计对策。

(一)给水的大压力缩短了管材与卫生器具的寿命多层建筑中的给水需要的压力较小,可以在选择管材与卫生器具时就降低设计标准。

而高层建筑中的差异较大,一些设计人员仅仅利用水泵机组的高压区与低压区开展分组设计,并未综合思考小区内分区给水压力,进而造成水压较高的情况,不但浪费了大量电能,还降低了管材与卫生器具的寿命。

(二)给水管道材质影响了水质管网是给水系统的重要组成部分,其作用是把经水厂净化后的符合国家相关标准的水输送至用户。

传统的给水管道的材质基本都是铸铁,但是铸铁在使用的过程中会因为氧化而发生水锈,引起的“红水”问题,它降低了输水能力,增加了供水成本,严重影响着供水水质,给用户感官上带来不悦,是用户普遍投诉的问题。

为了提高供水质量,更换了给水管道的材质,使用塑料材质,大大的减少了对水质的污染,在一定程度上提高了人们的生活水平。

虽然塑料材质的管道减少了对水质的污染,但是噪声却比铸铁材质大很多,尤其是将管道设计在客厅或者卧室等位置的建筑中,严重影响了居民的生活。

(三)给水支管布置与敷设给水管道的敷设主要有明装和暗装两种。

明装其实是指管道外露,这种方式安装维修方便,所需的成本较低,也会直接影响到外部美观性,容易出现表面结露等不足的问题。

浅谈建筑给排水设计中常见的几点问题

浅谈建筑给排水设计中常见的几点问题

杂乱 ,电焊施 工过 程 中易形成 火灾 ,特别 是苯 板外 保 温系统 的建 筑 ,苯板 燃点低 ,电焊形 成 的火花 温 度 高 ,稍 不 注意 就 会 酿 成 大祸 ,因此 防 患 于未 然 , 就必 须 强化施 工安 全管 理 。无 论何 时都 要确 保场 区 内物 品堆放要 分类 ,易 燃物 品尽量 远离 施工 作业 范 围 ,施 工过程 中施 工人 员应 多注 意周 围环境 ,施 工 过 程严 格遵守 规定 ,不 违规操 作 。施工 监理 人员 应 把好施 工 质 量 和 安 全 关 ,切 实 落 实 安 全 生 产 责 任
重要 原 因 。
封高 度不小 于 5 mm,但 在 一些使 用 频 率 较低 的场 0 所 ,水封经 常 因为蒸 发后 得不 到补 给而干 涸 ,造 成 水封 破坏 ,排水 管道 内有 害气 体逸人 室 内 ,污染 室 内空 气环境 。另外这 类水 封地 漏水 流通 道 狭窄 、弯 曲 、容易堵 塞 ,为避 免这 种情 况发生 ,可 以考 虑采 用不 带水封 的直通地 漏 配合存 水弯使 用 。所 以设 计 人员 在工 程之 初一定 要仔 细分 析设计 场所 的具 体情 况 ,合理 选择 设计方 案 。另外 , 目前研发 的 防涸地
漏中,以磁性密封较为新颖实用 , 地面有排水时能
利用 水 的重力 打开排 水 ,排完 积水后 能 利用磁 铁磁 性 自动 回复密 封 ,且 防涸性 能好 ,应 予 以推荐 。
我们 平常 设计 大多使 用水 封地 漏 ,通 常要求 水 目标 是 否符合 设计 阶段 的质 量要 求 。因此 ,工程 竣 工验 收 阶段是 工程 质 量 控 制 的最 后 一 个 重 要 环 节 , 是对 前 一阶段 一 系列工 作 的综 合 检测 和验 证 ,但 验 收 阶段 必须聘 请有 国家 质量 监督 部 门认 证 的质 量检 验机 构 来执行 验 收和 出具验 收报 告 ,否则 不能作 为 验 收结 果 。 2 施 工安全 的影 响 因素 及控 制措 施 ( ) 首 先 ,施 工 现 场 变 化 大 ,工 种 多 ,多 处 1 作业 ,高处低处相互交叉 ,施工机械时开时停 ,人 与施 工 机械 接触频 繁 。因此 ,对 施工 现场 的人 、机 环境 系 统 的可靠 性 必 须进 行 经 常性 的检 查 、分 析 、 判断和及时处理 ;建立 健全施工现 场安全管理机 构 ,强化管理 ,完善约束机制 ,配备专职安全 员, 班 组设 置兼 职安 全员 ,形 成安 全管 理 网络施 工现场 的大型机 械设备 、施 工机 具 、脚 手架 、洞 口、临 边 、安 全 网架 设 、施 工用 电等 ,必 须在 安装 后组织 验收 ,使用移交手续 ,防止防护措施不足及带病运 转 ,同时确保使用合格的安全防护用品。 ( )其 次,施工现 场易燃物较多 ,物品堆放 2

浅谈建筑给排水发展过程中的常见问题

浅谈建筑给排水发展过程中的常见问题
五 技术
浅谈建筑给排水发展过程中的常见问题
尹铁志 通化市二道江 区铁 厂镇矿 区物业管理中心
吉林通化 1 3 4 0 0 6
质量 问题 ; 施 工方面出现 的问题 主要是 加 工不合格 的镀锌 钢 管螺 纹以 【 摘 要l随着我国经济建设 的不断发展 , 各 类住宅小区的不 断出 现, 建筑的给排水技 术也 随之迅 速 发展 , 提 高建 筑给排水的施 工质量 以及使 及管 道接 口的不严密连接 等, பைடு நூலகம்种 问题 出现的原因主要是在 施工的不认 用的安 全性 、 稳定性是施 工单位的考虑因素之一 , 因此 , 本文将针 对建 筑 真以及连 接管道 时深度插入 不足或是 忘记涂胶水 等原 因。
换。 可利 用非直埋管 道敷设方法 对P P R 管材 进行安装 , 并考虑安装 过程 中的热 胀冷缩 使 管道变 形带来 的影 响并 实施相 应措 施等。 针对 管 道的 引言 由于我 国综 合国力的提高 , 建筑行业的 不断崛起 , 使建筑 技术也相 连接 方式 , 可 采取水平干 管与水平支管 连接 、 水平干管与立 管以及 立管 同时, 在管 道伸缩时互不 受影 响。 若有 渗漏 应得到 了应 用 , 建筑 给排水技 术也 随之越 来越 重要, 与此同时 , 建 筑施 与每 层支 管连 接方式 进行, 应 先找 到渗 水点并进行原 因分析 , 更 换不 合格 的材 料 , 以及 工中给排水技 术 的问题也 日 益 显露 , 因此 , 在施 工过程 中的质量 技术 问 情况 出现 , 若P P R 管材是 由于 题 的控制 以及 问题 产生 的预 防和 产生后 的排 查工作等 , 应采 取相 应措 施工方面的不合格应进 行工程 返修并进行重新安 装, 施进行 解决处 理, 所 以, 针对给排水 工程的发展历程 以及工程 施工的常 热胀 冷缩 造成 的原因 , 应截取 一部 分管 道并进行 重新施 工和 工程 的改 见质量 问题 以及产生原 因做 了 具体分析, 并提 出了 处 理和预 防措施 。 修工作等。 2 . 3 阀门的选择安装 问题 1 . 给 排 水技 术 的发 展 阶段 ( 1 ) 产生 的原 因: 主要是 阀门类 型选 择错误 会导致给排 水过程 中出现 我 国建筑 的给排水 主要分 为3 个 阶段的发 展, 是于 1 9 4 9 - 1 9 6 4 年间 例如 阀型与管道 系统功能 以及压 力的不 匹配, 闸阀与截 止 阀、 柱 的房屋 卫生技 术 设备 阶段 , 设置 给排水 专业 , 确定 了专业 课程 ; 1 9 6 4 — 问题 , 明杆 阀与暗杆 阀的混 用以 及止 回阀的位 置安 装不 当等 都 1 9 8 9 年 间的室内给排 水和 热水 的供 应阶段 结合了相应 的工程实 践并形 塞 阀的混 用, 成和确 立了我 国独有的技 术体系 , 以及1 9 8 9 一 至今的建筑 给排水 工程阶 会给管 道的运行或者 管道的维修 带来严重的后果 。 ( 2 ) 预 防及处理 : 安 装时 需 注意 安装 的高度与手 柄的朝 向并考 虑操 段, 使给排 水的技 术手 段逐渐走 向成 熟等。 在连 接两个 阀门时 , 若中间缺 少螺栓 的 穿人 间隙 , 可 自1 9 8 6 年 以来 , 建 筑业 的不断发展 , 建筑 给排 水成了给 水排 水不 可 作和 维修 工作 等 , 同时须按照安装指 示安装止 回阀。 缺少 的组成部 分, 在发展 阶段, 积 累了 _ 一定经验 的设 计、 施工 、 安装管 理 增设短 管将其设在二 阀之 间, 人 员经过专业 的培训组 成了一支专业 的队伍 , 结合 国外新 技术 以及 自身 2 . 4 噪音问题 ( 1 ) 产生的原 因: 主要是 由于 当管路较 长其管径 小于或等于2 0 mm ̄ 积 累实践 经验等 , 专业 技术 上得到 了明显的突 破与发展 。 因此 , 全 国建 给水 管道压 力超 过0 . 3 — 0 . 4 MP a 时, 高速水 流动力与管道 系统 会产生共 筑给排 水 工程标 准技 术委员会和 中国土 木学会 给排水学 会建筑 给水排 所以会导 致管道产生啸 叫与振 动。 当排 水管道 的水流呈不充 盈和重 水委 员会成 立 , 近年来 , 由于给 排水 工程技 术的 不断发 展, 各界 学术 踊 振 , 力流 的状 态时就会产生噪音 问题 , 同时也受本身的材料 质量 影响 。 跃活动 , 加 强了各国之间的技术交 流。 ( 2 ) 预防及处理 : 可适 当去增加 管道管径 、 接头 采用曲挠橡胶 接头 、 2 、 给 排 水 施 工中的 常见 问题 给排 水工程施 工中常见的问题有排 水管道堵 塞、 管道渗 漏、 阀门的 加装 减压 阀或者橡 胶垫在 支架与管道接 触处 等来综 合解决 噪音 问题 , 但 由于减压 阀本身就有噪音, 想要 把噪 音减少到最 小应 进行多次的反复 选择和 安装、 噪音 等。

浅谈建筑给排水施工中应注意的问题及解决措施

浅谈建筑给排水施工中应注意的问题及解决措施
仅供参考。
关键 词 :给排 水施 工 ;施 工技 术 ;施 工 质量
4 .给水 系统中的减压阀前后应设置 阀门 , 否则会造成减压阀
无法检修。在 给水系统中的减压阀前后均应设置阀门,以方便减
压阀的检修; 减压阀前还应加过滤器,以便过滤除去水中杂物。
5 .当 采 用 塑 料 管 作 为 冷 、热水 管暗 敷 在 楼 层 混 凝 土楼 板 内 以及水温等提出了更高要求。为保证排水工程质量 ,除注重设计 时 ,有分支或接头 的管道没有采用分水器 。在用水量多的厨房 、
8 1 .钻孔 内底板加 固注浆 :首先通过均 衡压力 向孔 内注入添 时4 天。通过一年多的观察 ,该孔及附近再没有出水 ,说明封堵 G 水文孔的封堵是成功 的。 加 速凝剂的稠水泥浆 (.5: ) 08 1 ,经孔 内破损处 向地层注入 了水 方法是正确 的,C 3 泥量为4 ,候凝7 d 时后进行第二次注浆 ,水泥量为4 ,候凝 吨 2x 吨
棠 玉
( 口市建 筑设 计研 究院 ,河 南 周 口 4 6 0 ) 周 600
摘 要 :给 排 水 工 程 的施 工质 量 直接 影 响到 建 筑物 给排 水 系统 管 道通 过 沉 降 缝处 无 进 行 补偿 处 理 。应 考 虑采 取 有 效 的遮 光 或 保
的正常运行 ,关 系到建筑物 的使 用质量 ,因此把好建筑物给排 水 温措施 ,塑料给水管宜暗敷在楼板内或墙体内。另外管道穿越沉 施 工质量一关至关重要 。文章结合给排 水施工 管理的工程 实践 , 降伸缩时应采取相应 的补偿措旌 ,否则 当建筑物 的沉降量 较大 分析 了给排 水施 . 阶段 应注意的 问题 ,并提 出了相应解决措施 。 时 ,容易使管道接 口破裂 ,出现漏水现象。 7 -

建筑给排水设计常见问题及图示

建筑给排水设计常见问题及图示

建筑给排水设计常见问题及图示给排水专业常见问题1.给水1.1.承接用水器与配水件出水口空气间隙不够,而且不采取措施游泳池、水景观赏池、循环水冷却池、洗涤池(槽)等的配(补)水口空气间隙不够,且不采取措施。

违反了《建筑给水排水设计规范》GB50015-2003第3.2.4条。

(强制性条文)“3.2.4生活饮用水不得因管道产生虹吸回流而受污染”生活饮用水管道的配水件西湖水口应符合下列规定:1.出水口不得被任何液体或杂质所淹没;2.出水口高出承接用水器溢流边缘的最小空气间隙,不得小于出水口直径的2.5倍;3.特殊器具不能设置最小空气间隙时,应设置管道倒流防止器或采取其他有效的隔断措施。

1.2未设置倒流防止器在规范要求的位置上,未设置倒流防止器或其他有效的防止倒流污染的装置。

违反了《建筑给水排水设计规范》GB50015-2003第3.2.5条(强制性条文)“3.2.5从给水管道上直接接出下列用水管道时,应在这些用水管道上设置倒流防止器或其他有效的防止倒流污染的装置:1.单独接出消防用水管道时,在消防用水的起端;(注:不含室外给水管道上接出的室外消火栓)2.从城市给水管道上直接吸水的水泵,其吸水起端3.当游泳池、水上游乐池、按摩池、水景观赏池、循环冷却水集水池等的充水或补水管道溢流水位之间的空气间隙小于出口管径的2.5倍式,在充(补)水管道上;4.由城市给水管道直接向锅炉、热水机组、水加热器、气压水罐等有压容器或密闭性容器注水的注水管上;5.垃圾处理站、动物养殖场(含动物园的饲养展览区)的冲洗管道及动物饮水管道的起端;6.绿地等自动喷灌系统,当喷头为地下式或自动升降式时,其管道起端;7.从城市给水环网的不同管段接出引入管向居住小区供水,且小区供水管与城市给水管网形成环状管网时,其引入管上(一般在总水表后)。

”按照规范要求,更改后见图下:1.3生活饮用水水池(箱)与其他用水水池(箱)合用生活与消防合用违反了《建筑给水排水设计规范》GB50015-2003第3.2.8条。

浅谈建筑给排水设计中的环保问题

浅谈建筑给排水设计中的环保问题
Q 塑 Q: !
S ci ence an T ech d noI ogy nn I ovaton 1 Her d a1
建 筑 科 学
浅谈建筑给排水设计 中的环保 问题
田元福 ( 广东宏 图建筑设计有 限公司 广东梅 州 5 2 ) 10 1 4 摘 要: 环境保 护工作是每 一个 给排水 工作 者义不容辞 的责任 , 保型建筑是未 来建 筑的发展 方向 , 环 本文将从 节约 用水 、节省能濠 .防 治水质污 染等方 面着手 , 讨如何 利 用现 有的新 材料 、新设备 和新 工艺 实现建 筑给排 水的环保 设计 。 探 关键词 : 建筑给排水 节水 节能 环保 设备 中图分类号 : 【 2 T| 27 文献标识码 : A 文章编号 : 6 4 0 8 ( 0 81 () O 0 - 1 1 7 - 9 X 2 0 ) Ob- l 8 0 人类为 生存 、发展 和繁荣 不懈地 努 力和 创造 , 进 了人类 文明的 历史进程 。在 享受 推 大 自然 无私给予恩赐的同时 , 我们每 个人也 同 样肩负着节约能源、保护环 境的责任。作为与 环保工作息息相关的给排水 专业 工作者 , 从我 做起 , 从本职 工作做起 , 更是 我们 义不容辞 的 责任。本文将从 节水 、节能和 二次供水的污染 防治等 几个方 面探讨建 筑给排 水设 计中的环
面。
1 1 采用新型卫生器具及其配件 . 老 的卫生 器具特 别是 大便 器冲洗 水箱耗 水量 大 , 生 器具给 水 配件 密封 性 和耐 用性 卫 差, 经常造成 “ 、冒、滴 、漏 ”等现象 , 跑 造成 水资源的 巨大浪 费。而新型 的卫生 设备 , J 如 s 型虹 吸式高 效节水 型坐便 器每次 冲洗 水量仅 为5, L 可节水 5 %; 0 公共 浴室采用单管恒温供 水配合脚踏 阀淋浴 器、光 电淋 浴器、手拉延 时 自 闭淋浴器等 比一般双管淋浴器可节水 2 %~ 0 5 % ; 陶瓷芯 水龙头 密封 性能好 , 0 而 开关数 万 次无 滴漏 , 节水效 果十分显 著。 1 2 屋顶水箱浮球阀 . 屋顶水 箱浮球 阀继 阀芯两 步到 位的配 重 逆开 式浮 球 阀 之 外 , 出现 了双 简浮 球 阀 、 有 液 压式浮球 阀和 呼吸 阀。最具 特点 的是导 阀 控制 型浮球 阀 , 兼有浮球阀 、减压阀 、 回阀、 止 流量控 制阀、泄 压阀等多种功 能。这 些新 式浮 球 阀克服了传统产品开关 不灵的现 象 , 减少 了
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

第 1 页 共 1 页
浅谈建筑给排水 浅谈建筑给排水设计中存在的
问题

摘要:随着国民经济的不断发展,国内建筑业得到了迅速发
展。建筑给排水设计是建筑设计的一个重要方面,它对于建筑设
计质量有直接的影响,所以,设计人员需对建筑给排水设计过程
中存在的问题给予足够重视,并积极寻找问题的解决办法。本文
深入分析了现阶段建筑给排水设计过程中存在的问题,并针对问
题产生的原因,提出了问题的解决办法。
关键词:给排水设计;建筑;问题;措施
引言
自建国以来,我国的建筑给排水发展迅速,总体来说经历了
以下三个发展阶段:第一,房屋卫生技术设备阶段。我国给排水
专业设置的初级阶段就是房屋卫生技术设备,它随即被设定成一
门单独的专业课程;第二,室内给排水阶段。这是一个反思阶
段,从1964年开始的22年时间里,《建筑给水排水设计规范》
通过了国家的审批。我国结合实践工程经验,认真总结和反思了
往年在借鉴国外技术时所导致的失误及损失,进而建立了具有我
国特点的建筑给排水技术体系;第三,建筑给排水阶段。现阶
段,我国建筑给排水已经进入发展时期,我国注重人才的培养,
建立专门的培训机构,对给排水系统中个各类人员进行专业培
第 1 页 共 1 页

训,使他们加深对专业领域的认识,提高专业的业务能力。在技
术上,累积在实际运作中的经验,参照、借鉴国外的新型技术,
而且有了很大的进展和突破。
1 现阶段建筑给排水设计过程中存在的问题
笔者通过多年的工作经验,认为现阶段建筑给排水设计过程
存在如下问题:
给排水管道之间的距离。有些工程建筑物内地下铺设的给排
水管线间距太小,不符合标准。一般来讲,建筑物内地下铺设的
生活给水管与排水管在平行铺设时的最小净距不宜小于,交叉铺
设时的最小净距则最好超过,并且给水管要设在排水管的上方。
为避免会发生漏水污染给水管线的情况,在设计中一般会避免将
给水管线跟排水管线铺设在一起。
没有设置倒流防止器。倒流防止器在给排水设计中作用比较
重要,若漏设,则会给人们的生活带来诸多的不便。倒流防止器
通常设置在引入管上,没有倒流防止器的后果是,城市环网里的
水会在压力差的作用下,向压力较低的接口流动,这样会直接导
致居民区管网里的水与城市管网内的水融在一起,造成污染和水
表倒转。
生活用水水池各通道未采取防止外来物进入的措施。在钢筋
混凝土水池的内壁和池内管道、金属附件均没有采用对水质无污
染的材料,这种情况很可能会造成生活用水和市政水遭受一定程
度的污染。若要防止这种情况的出现,便要将生活用水水池的入
第 1 页 共 1 页

孔盖和盖座紧密结合,采用一些有弹性且无毒的发泡材料嵌在连
接处;通气管口及溢流管的喇叭处要装上铜丝网罩或一些耐腐蚀
材料所制成的网罩,防止一些外来物进入水池。在水池进行水压
试验之后,需对水池内壁、内管道以及金属构件等部位刷瓷釉涂
料,水池内使用的爬梯也需选择不锈钢材料,防止在潮湿环境下
生锈,造成给排水系统出现故障。
装设地漏。除了一些常排水的房间,如厕所、盥洗室等,其
他装设了地漏的房间也是需要经常排水的,否则,地漏水封蒸发
后又无法及时补给而干涸,会导致水封遭到损坏,从而不能阻止
水管道里的各种有害气体进入室内。一般来说,卫生间及阳台装
设地漏的情况不会有太多的争议,厨房装设地漏的情况是争议较
大的。随着现代家居装饰要求的提高,厨房的地板已不需要用大
量的水冲洗了,因此,厨房可以不装设地漏。现实中,已有很多
工程中的厨房不再装设地漏或者有些装设了地漏的也会在二次装
修时将其取消掉。然而,现实生活中往往会有些特别的意外,如
洗涤时忘关水龙头,未装设地漏的厨房便会“闹水灾”,这种情
况往往会给户主带来一定程度的经济损失。
设置导流槽。施工人员在做室外检查井时,将检查井做成沉
泥井,并没有依照规定做导流槽,造成井底有大量的粪便残留。
这样影响了化粪池的处理效果,还影响了环境卫生。
UPVC 排水管未采取防火措施。在高层建筑的规范中对给排水
管道防火措施有明确的规定,规定指出,若在高层建筑中所采用
第 1 页 共 1 页

的室内塑料排水管径超过110mm,需在立管穿楼层处加设防火套管
或者阻火圈,以防止底层火灾越过管道蔓延至上层。
厨房与卫生间的排水立管没有分开设置,在布置与卧室相邻
的内墙排水立管没有使用消除噪音的管材。当厨房与卫生间处于
相邻的位置时,最好不要使用同一根排水立管,应该分开设立,
这样可以避免卫生间内的污浊气体流到厨房内,影响户主的卫生
健康。为给户主营造一个宁静、舒适的居住环境,在布置与卧室
相邻的内墙排水立管时,最好不要使用不能消除噪音的普通塑料
排水管,而宜选择不影响正常生活休息的消音排水管材。
2 建筑给排水设计过程中存在问题的解决措施
为保证建筑给排水施工的顺利进行,要进一步提升给排水设
计的力度,根据实际情况,做好建筑给排水设计施工的组织设
计,按照国家相关规定做到施工仔细、设计科学。使用合理、科
学的有效措施,保障建筑给排水施工工作顺利完成,给用户的使
用带来便捷。另外,灌水试验是给排水管道在隐蔽前务必认真执
行的工作,试验方式务必严格参照相关规定。针对地质条件较差
的地区,务必注意增加管道壁支撑的强度,准确计算地面沉降系
数,以保证埋管的安全。通常给水管道在暗设时不能直接铺设在
建筑物的结构内层。所以,给排水管道在通过楼板时,在选择浇
筑材料方面,不得使用质量低于楼板标号的细石混凝土,为达到
更好的防水效果,可往浇筑材料中加入适当的防水、防渗添加
剂,或者土建施工期间,预埋套管,上述方式对于解决建筑楼板
第 1 页 共 1 页

渗水问题有非常显著的效果。值得注意的是,地漏与存水弯的配
合问题需引起足够的重视。
实际施工经验表明,住宅内配备了存水弯,防渗效果会更加
突出。因此,建筑给排水设计时,可适当地对系统中的地漏采用
存水弯防漏。施工时,水封深度需严格控制在60-80mm间 ,以避
免出现污水串味的情况。为保证建筑给排水系统的质量,不仅要
在给排水设计阶段严格把关,而且在施工阶段也需格外注重施工
质量。除对设计、施工人员的综合素质及设 计技能等进行强化,
还需提高现场人员的质量意识,要求施工过程中严格按照有关规
范进行施工操作,重视给排水整体结构布局以及构件特性,防止
因为结构缺陷而引起不均匀沉 降,导致管道损坏。若排水管需管
过楼板面,设计时需要求楼板面开设一定槽宽,以方便管道敷
设。给排水设计出图前,给排水设计人员需参与技术交底活动,
使建筑主体设计人员熟悉给排水设计真实意图,避免主体结构的
设计出现冲突。
结束语
建筑给排水是建筑住宅设计施工过程中的重要环节,作为建
筑中重要的组成部分,建筑给排水设计施工工程应坚持以人为本
的原则,切实走好全面、实际、安全的发展之路。建筑给排水设
计及施工期间,需注重施工质量,并选择适宜的配套管材。在保
证给排水功能、卫生环保以及管路安全性的条件下,尽量地使设
计方案利于今后的检修维护。应该强化现场施工人员对给排水设
第 1 页 共 1 页

计施工缺陷等问题的认识,可通过培训的方式提高施工人员现场
施工及解决缺陷的能力,使他们对相关建筑给排水规范有更深刻
的理解。另外,施工设计人员还需对各种给排水建筑材料的特点
有清晰的了解,以使在实际施工设计中,可结合自身的工作经验
及对给排水建筑的认识,提出既具经济性,又具实用性的建筑给
排水设计施工方案,这对于保证建筑给排水设计施工工作的有序
展开颇有帮助。