Saber2011仿真步骤

Saber2011仿真步骤
Saber2011仿真步骤

Saber2011仿真步骤

1.画好原理图。例如:

2.保存,格式命为XX.ai_sch

3.DC工作点分析,主要是求解系统的静态工作点,为其他分析提供初始值。设置如下:

采样点密度

进度显示控制

调试

释放保留点

自动显示结果

结束文件

是否使用初始条

4.瞬态(transient)分析(时域分析),瞬态分析用于检验系统的时域特性,此分析

通常从静态工作点开始。但对于自激振荡电路应从零时刻开始:

结束时间

时间步长

显示进度

先运行DC分析

5.显示瞬态分析结果:

点击Results > Operating Point Report,弹出:下划线可以减少空间

点击Design > Back-Annotate > Place Across Values,查看每个点的电压值。6.在设计文件中放探头(probe)查看时域波形:

在原理图的连线上点击右键,选择probe,就会弹出一个方框显示各点波形,拖动箭头可以显示各点的波形(电压---时间)。

7.交流小信号分析:

点击OK后将会弹出CosmosScope窗口

双击每个点将会显示波形,例如双击n_1得到下图:

8.测量波形中每个点的值;

还是在CosmosScope窗口的左下方单击,将会弹出:

单击可以显示所测的项目。

9.参数变化时,为每个电阻值分析:直流工作点分析,瞬态分析,小信号分析。下面以三极管的发射极电阻(re)变化时的分析举例:

在saber sketch窗口中单击,显示:

单击上面对话框中的显示窗口应更改后的对话框如下:

后单击Accept,回到Looping Commands中单击选择Within Loop(s) > Transient显示下窗口:

点击弹出:

只需要修改InputOut的参数,所以点击并修改参数后如下所示:

然后点击Accept.回到Looping Commands对话框中单击显示如下:

只需要修改InputOutput,修改后如下:

点击Accept,后点击OK

10.显示参数扫描结果

a.打开CosmosScope窗口,点击清除先前的波形;

b.关掉先前的XX.vary_a

c.ai_pl窗口;

c.从Signal Manager中单击在新的对话框中按Shift键选择

后点击“打开”,显示:

后选择下的各点显示波形:

可以从上图中删除(DEG):F(Hz)图形,剩下就是我们需要的图形:

d.双击XX.vary_tr.ai_pl中的每个点,(V):t(s)图形也将会显示在Graph中。可以用鼠标拖动某个点的图形到此点的另一中类型参数中经行对比。

11.管理显示的数据:

a.点击(dBV):f(Hz) dB(aout)信号,右键选择Member Attributes,弹出下面图框:

点击上面的按钮可以显示或隐藏各个图形。

12.多个仿真波形的测量:

a.填写Measurement对话框如下:

选择Levels > Maximum

务必选择一波形图

b.点击Apply ,显示:

这样创建一个新的波形信号最大分贝(AOUT)。电阻值绘制在X轴,分贝值绘制在Y轴。而且按照每20欧姆的步进显示一条连续的曲线

总结步骤:

(完整版)VERICUT的功能及其基本模块简介

VERICUT的功能及其基本模块介绍 VERICUT是全世界NC验证软件的领导者。使用VERICUT可在产品实际加工之前仿真NC加工过程,以检测刀具路径中可能存在的错误,并可用于验证G代码和CAM软件输出结果,VERICUT可在UNIX、Windows NT/95/98/2000/XP系统下运行。 本系统有五大主要功能:仿真、验证、分析、优化、模型输出。 一、选用VERICUT可以给企业/学校带来什么? 1、应用VERICUT软件后可以做到:数控编程者最终给出的加工程序(G.、M代码)保证是 100%的正确,绝无碰撞、干涉等现象。如还发现实际加工零件不合格,则只会发生在机床操作者的操作过程和数控机加工艺是否正确或合理等方面。比如,操作者使用刀具有错,零件装夹不正确,编程零点与实际零件基准没有精确找正,机床切削参数(F、S)人工有所变动,加工工艺对刀具、零件装夹、加工工序引起的工件变形考虑不周, 等因素都可影响到加工零件的最终精度结果! 2、应用VERICUT软件可以在短时间内反复比较多种加工方法(应用各种三轴、四轴、五轴 机床,各种走刀路径,进给精度等)的优劣,以找到或优化出一个适合客户目前生产要素(机床、刀具、工装、夹具、人员素质)的最佳加工方案!这对新产品开发、试验由为重要! 3、应用VERICUT软件可省去费时、费钱的真实机床程序试切、验证过程,并节约大量昂贵 的试切材料,缩短产品加工周期。 4、应用VERICUT软件可以优化CAD/CAM软件给出的加工程序( 以定义的优化策略来修改F和S值),达到始终保持一个最佳的切削模式, 不但缩短了零件加工时间,降低了成本,更重要的是还增加了机床及刀具的使用寿命(潜在和长远的效益十分可观)。 5、应用VERICUT软件可以在短时间内对初学者(如学生或刚进厂没有实际编程经验的员工)进行数控编程培训。因为在计算机上进行编程及加工模拟仿真,不需在实际机床上试切,因此成本十分低廉,并且可以将同一类加工零件在计算机上仿真不同的加工机床进行切削加工,以评定其可行性、合理性、经济性。反之要通过在不同的加工机床上进行实验是不现实的,就是可能,也会造成实验加工成本难以承受的结果。因此,该软件对教学、科研、人员技能培训非常有效和实用。 二、常用模块功能简介: 1.VERIFICATION(验证模块): 对三轴铣、钻、车、车铣复合、线切割、放电加工的数控 程序进行模拟、验证、分析。 该模块是VERICUT软件系列模块的基础。包括3轴铣、2轴车和多轴定位所必须的功能,既可以模拟由CAM软件输出的刀位文件,也可以模拟G代码文件。该模块包含由标准控制系

施工组织设计编制的步骤方法

施工组织设计编制的步骤方法 由于施工工程项目的大小不同,所要求编制组织设计的内容也有所不同,但其方法和步骤基本大同小异,大致可按以下步骤进行。 (1)收集编制依据文件和资料 1)工程项目设计施工图纸。 2)工程项目所要求的施工进度和要求。 3)施工定额、工程概预算及有关技术经济指标。 4)施工中可配备的劳力、材料和机械装备情况。 5)施工现场的自然条件和技术经济资料。 (2)编写工程概况 主要阐述工程的概貌、特征和特点,以及有关要求等。 (3)选择施工方案、确定施工方法 主要确定对工程施工的先后顺序、选择施工机械类型及其合理布置.明确工程施工的流向及流水参数的计算,确定主要项目的施工方法等(总设计还需先做出施工总体布署方案)。 (4)制定施工进度计划 包括对分部分项工程量的计算、绘制进度图表。对进度计划的调整平衡等。 (5)计算施工现场所需要的各种资源需用量及其供应计划(包括各种劳力、材料、机械及其加工预制品等)。 (6)绘制施工平面图 (7)其他 提出对有关工得的质量通病和易于发生安全问题的环节。订出防治措施、制定降低成本(如节约劳力、材料、机具及临时设施费等)的具体措施、超奖减罚等的具体要求和技术经济指标。 施工组织设计编制要点 1、封面:含编制单位、负责人、编制人、编制时间,有企业的logo。 2、目录:有页码、应细分层次,重点章节可列出三级目录,要章节层次明晰。 3、编制依据:招标文件、建设文件、工程勘察和技术经济资料、类似工程的有关资料、现行规范、规程和有关的技术规定;企业标准及现有资源。 4、工程概况:项目概况,工程地区的自然、技术经济条件,其他诸如主要设备、特殊物资供应,参加施工各单位生产能力和技术水平情况,建设单位或上级主管部门对施工的要求;有关建设项目的决议和协议;土地片用范围和居民搬迁情况等。 5、工程特点、重点、难点的分析:一份施工组织设计的质量在很大程度上取决于编制者对具体工程特殊部分的把握和在此基础上提现的解决方案,此部分应当详细。 6、施工部署:含确定工程开展程序,拟定主要工程项目的施工方案,明确施工任务划分与组织安排,编制施工准备工程计划等内容。 总体施工工序流程是对工程具体情况包括工程量、工期、工程特点、环境等总体分析的基础遵循一定的原则提出的,确定施工顺序的原则有:在保证工期的前提下,分期分批施工。一

cadence仿真步骤(精)

CDNLive! Paper – Signal Integrity (SI for Dual Data Rate (DDR Interface Prithi Ramakrishnan iDEN Subscriber Group Plantation, Fl Presented at Introduction The need for Signal Integrity (SI analysis for printed circuit board (PCB design has become essential to ensure first time success of high-speed, high-density digital designs. This paper will cover the usage of Cadence’s Allegro PCB SI tool for the design of a dual data rate (DDR memory interface in one of Motorola’s products. Specifically, this paper will describe the following key phases of the high-speed design process: Design set-up Pre-route SI analysis Constraint-driven routing Post-route SI analysis DDR interfaces, being source synchronous in nature, feature skew as the fundamental parameter to manage in order to meet setup and hold timing margins. A brief overview of source synchronous signaling and its challenges is also presented to provide context. Project Background This paper is based on the design of a DDR interface in an iDEN Subscriber Group phone that uses the mobile Linux Java platform. The phone is currently in the final stages of system and factory testing, and is due to be released in the market at the end of August 2007 for Nextel international customers. The phone has a dual-core custom processor with an application processor (ARM 11 and a baseband processor (StarCore running at 400MHz and 208MHz respectively. The processor has a NAND and DDR controller, both supporting 16-bit interfaces. The memory device used is a multi-chip package (MCP with stacked NAND (512Mb and DDR (512Mb parts. The NAND device is run at 22MHz and the DDR at 133MHz. The interface had to be supported over several memory vendors, and consequently had to account for the difference in timing margins, input capacitances, and buffer drive strengths between different dies and packages. As customer preference for smaller and thinner phones grows, the design and placement of critical components and modules has become more challenging. In addition to incorporating various sections such as Radio Frequency (RF, Power Management, DC, Audio, Digital ICs, and sub-circuits of these modules, design engineers must simultaneously satisfy the rigid placement requirements for components such as speakers, antennas, displays, and cameras. As such, there are

最详细最好的Multisim仿真教程

第13章Multisim模拟电路仿真本章Multisim10电路仿真软件,讲解使用Multisim进行模拟电路仿真的基本方法。 目录 1. Multisim软件入门 2. 二极管电路 3. 基本放大电路 4. 差分放大电路 5. 负反馈放大电路 6. 集成运放信号运算和处理电路 7. 互补对称(OCL)功率放大电路 8. 信号产生和转换电路 9. 可调式三端集成直流稳压电源电路 13.1 Multisim用户界面及基本操作 13.1.1 Multisim用户界面 在众多的EDA仿真软件中,Multisim软件界面友好、功能强大、易学易用,受到电类设计开发人员的青睐。Multisim用软件方法虚拟电子元器件及仪器仪表,将元器件和仪器集合为一体,是原理图设计、电路测试的虚拟仿真软件。 Multisim来源于加拿大图像交互技术公司(Interactive Image T echnologies,简称IIT公司)推出的以Windows为基础的仿真工具,原名EWB。 IIT公司于1988年推出一个用于电子电路仿真和设计的EDA工具软件Electronics Work Bench(电子工作台,简称EWB),以界面形象直观、操作方便、分析功能强大、易学易用而得到迅速推广使用。 1996年IIT推出了EWB5.0版本,在EWB5.x版本之后,从EWB6.0版本开始,IIT对EWB进行了较大变动,名称改为Multisim(多功能仿真软件)。 IIT后被美国国家仪器(NI,National Instruments)公司收购,软件更名为NI Multisim,Multisim 经历了多个版本的升级,已经有Multisim2001、Multisim7、Multisim8、Multisim9 、Multisim10等版本,9版本之后增加了单片机和LabVIEW虚拟仪器的仿真和应用。 下面以Multisim10为例介绍其基本操作。图13.1-1是Multisim10的用户界面,包括菜单栏、标准工具栏、主工具栏、虚拟仪器工具栏、元器件工具栏、仿真按钮、状态栏、电路图编辑区等组成部分。

实验一、Cadence软件操作步骤

实验一基本门电路设计——电路仿真 一、实验内容: 完成CMOS 反相器的电路设计完成CMOS 反相器的电路设计 实验目的 掌握基本门电路的设计方法掌握基本门电路的设计方法 熟悉Cadence 的设计数据管理结构,以及定制设计的原理图输入、电路仿真、版图设计、版图验证工具的使用 二、实验目的:基于csmc05工艺,完成一个具有逻辑反相功能的电路 设计要求:设计要求: 1.反相器的逻辑阈值在Vdd/2附近,即噪声容限最大 2.反相器的版图高度限制为24微米,电源和地线宽度各为2微米 3.反相器宽度限制为mos 器件不折栅 4.为了给顶层设计留出更多的布线资源,版图中只能使用金属1和多晶硅作为互连线,输入,输出和电源、地线等pin脚必须使用金属1 5.版图满足设计规则要求,并通过LVS 检查 三、设计过程: 启动icfb 1.建立自己的设计库 2.用Virtuoso Schematic Composer 画电路图 3. 在Analog Design Environment中进行电路仿真 4. 用Virtuoso (XL)Layout Editer 画版图 5. 利用diva 工具进行DRC检查,用dracula进行DRC和LVS验证。 四、实验步骤 1.Cadence软件操作步骤: (1).点击桌面虚拟机快捷方式图标; (2).打开虚拟机(存放路径:F:\cadence); (3).启动虚拟机

(4).单击右键,Open Teminal,弹出终端对话框,输入Cadence启动命令icfb&(&是后台运行的意思)。 2.. 新建一个库 建立自己的Design Lib 第一步: CIW-> Tools-Library manager 第二步:File-New 弹出“New Library ”对话框,在“Name”项填写要建的design lib的名字,这里是“lesson1”,选择“Attach to an existing techfile” 第三步: 弹出”Attach Design Library to Technology File”对话框,在“Technology Library”中选择st02

Vericut 基础教程-构建机床、程序原点、刀具设置、宏程序仿真 by ljg

Vericut 基础培训一构建三轴机床、仿真宏程序 Vericut 基础培训1 ——构建三轴机床,仿真宏程序 作者:LJG 使用Vericut仿真,必须包含毛坯、数控程序、刀具三个部分,但为了仿真的准确性和真实性,我们还需要机床、夹具用于仿真碰撞,设计模型用于比对仿真结果的正确性等。 这一章我们从基本的三轴机床构建讲起。 在Vericut里有两种方法构建机床,一种是通过Vericut自带的简单建模工具建立机床模型,另外一种是使用其它CAD软件先建立好机床模型,再将机床模型文件导出为Vericut可以接受的文件格式,再导入Vericut。用Vericut自带的建模工具建立机床模型比较麻烦,这里我们用第二中方法,利用NX将建好的机床模型文件导出为.STL 格式文件,并导入Vericut用以构建三轴机床。 一、从NX输出机床模型 从论坛https://www.360docs.net/doc/fb8893360.html,上下载机床模型文件,用NX6打开,如下图1所示。 图 1 一般像机床外壳,控制系统操作面板等实际仿真过程中不需要的部件可以不导出,不过在Vericut里导入不参与仿真的部件可以增加机床的真实感。这里我们不导出机床外壳,控制系统操作面板这两个部件,将这两个部件隐藏如图2所示。

图 2 将不用的部件隐藏后,我们可以看见如图3所示的主轴端面的坐标系。 图 3 在机床建模的时候,我们一般会按照机床的机械零点位置来建立各个机床运动部件的模型,而机床的Z轴的机械原点一般在主轴端面,如图3所示。但从这个机床模型可以看出X、Y轴的位置并不在机械原点,所以我们导出后还要在Vericut里进行调整。 下面先输入机床床身,即在仿真过程中不运动的部件。选择主菜单File > Export >STL…,弹出Rapid Prototyping对话框,这里可以设置输出模型的公差,公差的大小会影响STL文件的大小,不改变参数,单击OK,在弹出的对话框中输入要保存的文件名,输入Based_Y,双击鼠标中键(单击两次OK),选择绿色的底座和导轨,如图4所示的高亮显示部件,选择完成后所有弹出的窗口,都选择OK。 图4

电路仿真软件的使用方法

电路仿真软件的使用方法

河南机电高等专科学校软件实习报告 系部:电子通信工程系 专业:应用电子技术 班级:应电111 学生姓名: xxx 学号: xxxxxxxx

201x年xx月xx日 实习任务书 1.时间:201x年xx月xx日~201x年xx月xx日 2. 实训单位:河南机电高等专科学校 3. 实训目的:学习电路仿真软件的使用方法 4. 实训任务: ①了解电路仿真与EDA技术的基础常识; ②了解电路仿真软件的作用及其特点; ③了解软件仿真结果与实际电路结果的异同; ④熟悉电路仿真软件的界面,能熟练的在电路仿真软件环境中绘制电路图; ⑤能够使用电路仿真软件的各种分析功能对电路进行软件仿真; ⑥会使用电路仿真软件中的虚拟仪器对电路进行数据和波形等的测量; ⑦作好实习笔记,对自己所发现的疑难问题及时请教解决; ⑧联系自己专业知识,体会本软件的具体应用,总结自己的心得体会; ⑨参考相关的的书籍、资料,认真完成实训报告。

软件实习报告 前言:经过半学期深入地学习基础电路知识,我们终于有机会学习电路仿真用软件设计并检验电路,深入的理解电路定理,增加我们对专业的兴趣,增强我们的实际动手操作能力。 实习报告: 实验一、戴维南定理和诺顿定理的研究 一、实验目的 1、求出一个已知网络的戴维南等效电路。 2、求出一个已知网络的诺顿等效电路。 3、验证戴维南定理和诺顿定理的正确性。

二、实验器材 直流电压源 1个 电压表 1个 电流表 1个 电阻 3个 万用表 1个 三、实验原理及实验电路 任何一个具有固定电阻和电源的线性二端网络,都可以用一个串联电阻的等效电压源来代替,这个等效电压源的电压等于原网络开路时的端电压U oc ,或用一个并联电阻的等效电流源来代替,这个等效电压源的电压等于原网络开路时的端电压I sc 。下图电路中负载为RL ,试用EWB 仿真测得到除去负载后的二端网络的开路电压、短路电流以及等效电阻大小。 0.5Ω RL=0.25Ω

cadence信号完整性仿真步骤

Introduction Consider the proverb, “It takes a village to raise a child.” Similarly, multiple design team members participate in assuring PCB power integrity (PI) as a design moves from the early concept phase to becoming a mature product. On the front end, there’s the electrical design engineer who is responsible for the schematic. On the back end, the layout designer handles physical implemen-tation. Typically, a PI analysis expert is responsible for overall PCB PI and steps in early on to guide the contributions of others. How quickly a team can assure PCB PI relates to the effectiveness of that team. In this paper, we will take a look at currently popular analysis approaches to PCB PI. We will also introduce a team-based approach to PCB PI that yields advantages in resource utilization and analysis results. Common Power Integrity Analysis Methods There are two distinct facets of PCB PI – DC and AC. DC PI guarantees that adequate DC voltage is delivered to all active devices mounted on a PCB (often using IR drop analysis). This helps to assure that constraints are met for current density in planar metals and total current of vias and also that temperature constraints are met for metals and substrate materials. AC PI concerns the delivery of AC current to mounted devices to support their switching activity while meeting constraints for transient noise voltage levels within the power delivery network (PDN). The PDN noise margin (variation from nominal voltage) is a sum of both DC IR drop and AC noise. DC PI is governed by resistance of the metals and the current pulled from the PDN by each mounted device. Engineers have, for many years, applied resistive network models for approximate DC PI analysis. Now that computer speeds are faster and larger addressable memory is available, the industry is seeing much more application of layout-driven detailed numerical analysis techniques for DC PI. Approximation occurs less, accuracy is higher, and automation of How a Team-Based Approach to PCB Power Integrity Analysis Yields Better Results By Brad Brim, Sr. Staff Product Engineer, Cadence Design Systems Assuring power integrity of a PCB requires the contributions of multiple design team members. Traditionally, such an effort has involved a time-consuming process for a back-end-focused expert at the front end of a design. This paper examines a collaborative team-based approach that makes more efficient use of resources and provides more impact at critical points in the design process. Contents Introduction (1) Common Power Integrity Analysis Methods (1) Applying a Team-Based Approach to Power Integrity Analysis (3) Summary (6) For Further Information (7)

VERICUT虚拟加工仿真过程研究

VERICUT虚拟加工仿真过程研究 随着现代工业的发展,零件的复杂程度、精度要求越来越高,经过软件自动生成的刀具路径处理后,生成的NC程序也更加复杂。因此,如何保证NC程序的精确性,成为数控加工生产中的一个难点。虚拟制造技术正是在这种背景下近年来出现的一种新的先进制造技术;在实际加工过程前,能够对具体加工过程进行仿真、优化,并对虚拟结果进行分析,可预先发现和改进实际加工中出现的问题,以较优的加工工艺投入生产。虚拟制造技术由建模技术、仿真技术、控制技术及支撑技术组成。其中,建模与仿真是虚拟制造技术的基础与核心。虚拟制造依靠建模与仿真技术模拟制造、生产和装配过程。虚拟加工环境是进行制造过程仿真、预测加工问题的前提和基础。 本文将在虚拟制造软件VERICUT平台上,提出建立仿真机床的方法与过程,并结合具体实例,说明在VERICUT平台上进行虚拟机床建模的过程。 1 VERICUT主要功能 VERICUT是CGTech公司提供的一种专用于数控加工仿真的软件,具有较强的机床和NC程序的仿真功能。其主要功能模块如下: 1)Verification:三轴加工验证及分析。 2)OptiPath:对切削用量进行优化设计,以满足最小加工时间的目标函数及最大机床功率等约束条件的要求。 3)Model Export:从NC刀具路径创建CAD兼容模型。 4)Machine Simulation:提供虚拟机床及其工作环境建模功能;解读可识别的数控代码。 5)Mult-iAxis:四轴及五轴验证。 6)AUTO-DIFF:实时擦伤检查和模型分析,并与CAD设计模型相比较。 7)Machine Developerps Kit:定制VERICUT功能,用来解释复杂或不常用的数据。 8)AdvancedMachine Features:提高VERICUT仿真复杂机床功能的能力。 9)CAD/CAM Interfaces:可从Pro/E、UG、CA TIA等CAD/CAM系统内部无缝运行VERICUT。 10)VERICUT Utilities:模型修复工具和转换器(包括在验证模块中)。 2 虚拟机床的建模 虚拟机床是随着虚拟制造技术的发展而提出的一个新的研究领域,通过虚拟机床加工系统可以优化加工工艺、预报和检测加工质量,同时还可以优化切削参数、刀具路径,提高机床设备的利用率和生产效率。 在虚拟制造软件的研究领域中,建模的对象大多是局限于某一种或某一系列的机床,这种建模的方法不仅通用性差,工作量大,而且效率不高,影响仿真效果、制造周期和生产成本。针对不同类型机床的通用化建模方法是解决问题的必然出路,下面综合分析机床的结构特点,抽象出其功能模块,总结出通用性的建模方法。 机床结构分析与模块分解:常见的数控机床在结构上主要有床身、立柱、运动轴和工作台等部件,再配合刀具、夹具和一些辅助部件共同组成。其中床身起到支承和承载机床组件的作用;立柱在结构上起到了拉开加工刀具和工件的空间距离,实现运动轴的布局;工作台则用来摆放工件,通过夹具等辅助工具实现工件的定位与夹紧。根据结构的特点可将机床的组件划分为三种类型:通用模块、辅助模块、专用模块。其中,通用模块是指各类机床共有的零/部件,如床身、立柱、工作台等等;辅助模块是指刀具、夹具等机床工具;专用模块

(完整版)施工组织设计审核流程

施工组织设计审批流程 有修改意见修改补充有修改意见 编制施工组织设计 (工程科) 初审 (工程科) 公司会审 (公司技术负责人、各专业工程师、技术员参加) 施工组织设计审批 (监理组) 将批件返回单位 并送业主 施工组织设计实施

施工组织设计审批程序 一、编制依据 根据合同条款的有关规定、国家标准、江苏省地方标准制定本工作程序。 二、目的 控制工程总体安排和进展符合合同文件的规定。 三、适用范围 本程序使用于管片、板梁、栏板、护筒合同工程施工组织设计的控制。四、施工组织设计文件内容 施工组织设计文件内容包括:施工组织设计、施工方案等。 1、施工组织设计 1.1施工组织设计应包含以下内容: 1.1编制依据 1.2工程概况 1.3施工部署 1.4施工准备 1.5 主要施工方法 1.6主要管理措施 1.7施工总平面图 2、施工方案 选用于分部、分项或专项工程。 2.1编制依据 2.2施工部位的概况分析 2.3施工准备 2.4 施工安排 2.5 主要施工方法 2.6质量要求 2.7其他要求 五、施工组织设计文件的审批 1、施工组织设计文件应严格执行编制与审批程序。应按照以下要求组织编

制和审批工作。 2、单位内部的编制与审批 各类施工组织设计文件审批人员组成 3、修改与补充 3.1单位工程施工组织设计 工程施工过程中,当其施工条件、总体施工部署或主要施工方法发生变化时,项目负责人或项目技术负责人应组织相关人员对该文件进行修改和补充,并进行相关交底。 3.2施工方案 当工程施工条件发生变化,原方案不能满足施工要求时,项目技术负责人应及时组织相关人员对相应部分进行修改、补充并作好交底。 六、施工组织设计文件的审核程序 1、承包人在签定《合同协议书》后,应尽快组织各方人员进行图纸审核、确定施工方案,开始编制施工组织设计。 2、编制好施工组织是后工程科应组织内部初审并完善。 3、公司项目负责人组织公司相关技术人员对施工组织设计会审。 4、向监理组报送施工组织设计。 5、将批件返回单位并同时报送业主。 6、实施施工组织设计。

Cadence仿真简介

时序计算和Cadence仿真结果的运用 中兴通讯康讯研究所EDA设计部余昌盛刘忠亮 摘要:本文通过对源同步时序公式的推导,结合对SPECCTRAQuest时序仿真方法的分析,推导出了使用SPECCTRAQuest进行时序仿真时的计算公式,并对公式的使用进行了说明。 关键词:时序仿真源同步时序电路时序公式 一.前言 通常我们在时序仿真中,首先通过时序计算公式得到数据信号与时钟信号的理论关系,在Cadence仿真中,我们也获得了一系列的仿真结果,怎样把仿真结果正确的运用到公式中,仿真结果的具体含义是什么,是我们正确使用Cadence仿真工具的关键。下面对时序计算公式和仿真结果进行详细分析。 二.时序关系的计算 电路设计中的时序计算,就是根据信号驱动器件的输出信号与时钟的关系(Tco——时钟到数据输出有效时间)和信号与时钟在PCB上的传输时间(Tflytime)同时考虑信号驱动的负载效应、时钟的抖动(Tjitter)、共同时钟的相位偏移(Tskew)等,从而在接收端满足接收器件的建立时间(Tsetup)和保持时间(Thold)要求。通过这些参数,我们可以推导出满足建立时间和保持时间的计算公式。 时序电路根据时钟的同步方式的不同,通常分为源同步时序电路(Source-synchronous timing)和共同时钟同步电路(common-clock timing)。这两者在时序分析方法上是类似的,下面以源同步电路来说明。 源同步时序电路也就是同步时钟由发送数据或接收数据的芯片提供。图1中,时钟信号是由CPU驱动到SDRAM方向的单向时钟,数据线Data是双向的。 图1

图2是信号由CPU 向SDRAM 驱动时的时序图,也就是数据与时钟的传输方向相同时 的情况。 Tsetup ’ Thold ’ CPU CLK OUT SDRAM CLK IN CPU Signals OUT SDRAM Signals IN Tco_min Tco_max T ft_clk T ft_data T cycle SDRAM ’S inputs Setup time SDRAM ’S inputs Hold time 图2 图中参数解释如下: ■ Tft_clk :时钟信号在PCB 板上的传输时间; ■ Tft_data :数据信号在PCB 板上的传输时间; ■ Tcycle :时钟周期 ■ Tsetup’:数据到达接收缓冲器端口时实际的建立时间; ■ Thold’:数据到达接收缓冲器端口时实际的保持时间; ■ Tco_max/Tco_min :时钟到数据的输出有效时间。 由图2的时序图,我们可以推导出,为了满足接收芯片的Tsetup 和Thold 时序要求,即 Tsetup’>Tsetup 和Thold’>Thold ,所以Tft_clk 和Tft_data 应满足如下等式: Tft_data_min > Thold – Tco_min + Tft_clk (公式1) Tft_data_max < Tcycle - Tsetup – Tco_max + Tft_clk (公式2) 当信号与时钟传输方向相反时,也就是图1中数据由SDRAM 向CPU 芯片驱动时,可 以推导出类似的公式: Tft_data_min > Thold – Tco_min - Tft_clk (公式3) Tft_data_max < Tcycle - Tsetup – Tco_max - Tft_clk (公式4) 如果我们把时钟的传输延时Tft_clk 看成是一个带符号的数,当时钟的驱动方向与数据 驱动方向相同时,定义Tft_clk 为正数,当时钟驱动方向与数据驱动方向相反时,定义Tft_clk 为负数,则公式3和公式4可以统一到公式1和公式2中。 三.Cadence 的时序仿真 在上面推导出了时序的计算公式,在公式中用到了器件手册中的Tco 参数,器件手册中 Tco 参数的获得,实际上是在某一种测试条件下的测量值,而在实际使用上,驱动器的实际 负载并不是手册上给出的负载条件,因此,我们有必要使用一种工具仿真在实际负载条件下 的信号延时。Cadence 提供了这种工具,它通过仿真提供了实际负载条件下和测试负载条件 下的延时相对值。 我们先来回顾一下CADENCE 的仿真报告形式。仿真报告中涉及到三个参数:FTSmode 、

cadence仿真流程

第一章在Allegro 中准备好进行SI 仿真的PCB 板图 1)在Cadence 中进行SI 分析可以通过几种方式得到结果: * Allegro 的PCB 画板界面,通过处理可以直接得到结果,或者直接以*.brd 存盘。 * 使用SpecctreQuest 打开*.brd,进行必要设置,通过处理直接得到结果。这实际与上述方式类似,只不过是两个独立的模块,真正的仿真软件是下面的SigXplore 程序。 * 直接打开SigXplore 建立拓扑进行仿真。 2)从PowerPCB 转换到Allegro 格式 在PowerPCb 中对已经完成的PCB 板,作如下操作: 在文件菜单,选择Export 操作,出现File Export 窗口,选择ASCII 格式*.asc 文件格式,并指定文件名称和路径(图1.1)。 图1.1 在PowerPCB 中输出通用ASC 格式文件

图1.2 PowerPCB 导出格式设置窗口 点击图1.1 的保存按钮后出现图1.2 ASCII 输出定制窗口,在该窗口中,点击“Select All”项、在Expand Attributes 中选中Parts 和Nets 两项,尤其注意在Format 窗口只能选择PowerPCB V3.0 以下版本格式,否则Allegro 不能正确导入。 3)在Allegro 中导入*.ascPCB 板图 在文件菜单,选择Import 操作,出现一个下拉菜单,在下拉菜单中选择PADS 项,出现PADS IN 设置窗口(图1.3),在该窗口中需要设置3 个必要参数: 图1.3 转换阿三次文件参数设置窗口 i. 在的一栏那填入源asc 文件的目录

cadence入门教程

本文介绍cadence软件的入门学习,原理图的创建、仿真,画版图和后仿真等一全套过程,本教程适合与初学着,讲到尽量的详细和简单,按照给出的步骤可以完全的从头到尾走一遍,本教程一最简单的反相器为例。 打开终端,进入文件夹目录,输入icfb&启动软件,主要中间有个空格。 启动后出现下图: 点击Tools的Library Manager,出现如下: 上面显示的是文件管理窗口,可以看到文件存放的结构,其中Library就是文件夹,Cell就是一个单元,View就是Cell的不同表现形式,比如一个mos管是一个Cell,但是mos管有原理图模型,有版图模型,有hspice参数模型,有spectre参数模型等,这就列举了Cell的4个View。他们之间是树状的关系,即,Library里面有多个Cell,一个Cell里面有多个View。应该保持一个好习惯就是每个工程都应该建立一个Library,Cell和View之间的管理将在后面介绍。

现在建立工程,新建一个Library,如下左图,出现的对话框如下有图: 在上右图中选择合适的目录,并敲入名字,这里取的是inv,这就是新建的文件夹的名字,以后的各种文件都在这个文件夹下。OK后出现下面对话框 这个对话框是选择是否链接techfile,如果只是原理图仿真而不用画版图,就选择Dont need a techfile,这里我们要画版图,而且有工艺库,选择Attach to an existing techfile,OK 后出现下面对话框:

在technology Library选择tsmc18rf,我们使用的是这个工艺库。Inv的文件夹就建好了,在Library Manager就有它了,如下图: 文件夹建好了后,我们要建立原理图,在inv的Library里面新建Cell如下:

施工组织设计基本步骤

由于施工工程项目的大小不同,所要求编制组织设计的内容也有所不同,但其方法和步骤基本大同小异,大致可按以下步骤进行。 (1)收集编制依据文件和资料 1)工程项目设计施工图纸。 2)工程项目所要求的施工进度和要求。 3)施工定额、工程概预算及有关技术经济指标。 4)施工中可配备的劳力、材料和机械装备情况。 5)施工现场的自然条件和技术经济资料。 (2)编写工程概况 主要阐述工程的概貌、特征和特点,以及有关要求等。 (3)选择施工方案、确定施工方法 主要确定对工程施工的先后顺序、选择施工机械类型及其合理布置.明确工程施工的流向及流水参数的计算,确定主要项目的施工方法等(总设计还需先做出施工总体布署方案)。 (4)制定施工进度计划 包括对分部分项工程量的计算、绘制进度图表。对进度计划的调整平衡等。 (5)计算施工现场所需要的各种资源需用量及其供应计划(包括各种劳力、材料、机械及其加工预制品等)。 (6)绘制施工平面图 (7)其他 提出对有关工得的质量通病和易于发生安全问题的环节。订出防治措施、制定降低成本(如节约劳力、材料、机具及临时设施费等)的具体措施、超奖减罚等的具体要求和技术经济指标。 施工组织设计编制的程序和方法 一、施工组织设计编制的程序 (一)计算工程量 通常可以利用工程预算中的工程量。工程量计算准确,才能保证劳动力和资源需要量计算的正确和分层分段流水作业的合理组织,故工程必须根据图纸和较为准确的定额资料进行计算。如工程的分层段按流水作业方法施工时,工程量也应相应的分层分段计算。 (二)确定施工方案

如果施工组织总设计已有原则规定,则该项工作的任务就是进一步具体化,否则应全面加以考虑。需要特别加以研究的是主要分部、分项工程的施工方法和施工机械的选择,因为它对整个单位工程的施工具有决定性的作用。具体施工顺序的安排和流水段的划分,也是需要考虑的重点。 (三)组织流水作业,排定施工进度 根据流水作业的基本原理,按照工期要求、工作面的情况、工程结构对分层分段的影响以及其他因素,组织流水作业,决定劳动力和机械的具体需要量以及各工序的作业时间,编制网络计划,并按工作日排出施工进度。 (四)计算各种资源的需要量和确定供应计划 依据采用的劳动定额和工程量及进度可以决定劳动量(以工日为单位)和每日的工人需要量。依据有关定额和工程量及进度,就可以计算确定材料和加工预制品的主要种类和数量及其供应计划。 (五)平衡劳动力、材料物资和施工机械的需要量并修正进度计划 根据对劳动力和材料物资的计算就可绘制出相应的曲线以检查其平衡状况。如果发现有过大的高峰或低谷,即应将进度计划作适当的调整与修改,使其尽可能趋于平衡,以便使劳动力的利用和物资的供应更为合理。 (六)设计施工平面图 施工平面图应使生产要素在空间上的位置合理、互不干扰,能加快施工进度。 二、施工组织设计编制的方法 (一)施工方案的制订原则和内容 1.施工方案制订的原则 (1)制订方案首先必须从实际出发,切实可行,符合现场的实际情况,有实现的可能性。制订方案在资源、技术上提出的要求应该与当时已有的条件或在一定时间能争取到的条件相吻合,否则是不能实现的,因此只有在切实可行的范围内尽量求其先进和快速。 (2)满足合同要求的工期,就是按工期要求投入生产,交付使用,发挥技资效益,这对国民经济的发展具有重大的意义。所以在制订施工方案时,必须保证在竣工时间上符合合同的要求,并能争取提前完成。为此,在施工组织上要统筹安排,均衡施工,在技术上尽可能地采用先进的施工技术、施工工艺、新材料,在管理上采用现代化的管理方法进行动态管理和控制。 (3)确保工程质量和施工安全。工程建设是百年大计,要求质量第一,保证施工安全是社会的要求。因此,在制订方案时应充分考虑工程质量和施工安全,并提出保证工程质量和施工安全的技术组织措施,使方案完全符合技术规范、操作规范和安全规程的要求。 (4)在合同价控制下,尽量降低施工成本,使方案更加经济合理,增加施工生产的盈利。从施工成本的直接费(人工、材料、机具、设备、周转性材料等)和间接费中找出节约的途径,采取措施控制直接消耗,减少非生产人员。 2.施工方案制订的内容 施工方案包括的内容很多,主要有:施工方法的确定、施工机具和设备的选择、施工顺序的安排、科学的施工组织、合理的施工进度、现场的平面布置及各种技术措施。施工方案前两项属于施工技术问题,后四项属于科学施工组织和管理问题。 (1)施工方法的确定:施工方法是施工方案的核心内容,具有决定性作用。施工方法一经确定,机具设备的选择就只能以满足它的要求为基本依据,施工组织也是在这个基础上进行。 (2)施工机械的选择:正确拟订施工方案和选择施工机械是合理组织施工的关键,二者又有相互紧密的联

相关文档
最新文档