教材:石油钻井常用英语手册

合集下载

钻井英语手册2319

钻井英语手册2319

A Handbook of English for Oil Drilling一.承包商人员( Contractor’s Personnel )Rig Manager 平台经理Equipment Supervisor 设备总监Materials Supervisor 材料总监Senior Toolpusher 高级队长Junior Toolpusher 值班队长Driller 司钻Assistant Driller (AD) 副司钻Derrick Man 井架工Floor Man (roughneck) 钻工Crane Operator吊车工Mechanic 机械师Electrician 电气师Repairman 修理工Welder 焊工Warehouse Man (stock Keeper) 材料员Safety Supervisor 安全监督Interpreter (translator) 翻译Chief Steward 管事Cook 厨师Steward厨工Laundry Man洗衣工clean boy (清洗工) 常用于井队现场雇用外籍清洁员。

二.作业者及服务公司人员(Operator’s Personnel and Service Company Personnel) Drilling Superintendent 钻井监督Company Man (Operator’s Representative) 公司代表Geologist 地质师Mud Logging Engineer (Mud logger) 泥浆录井工程师Sample Catcher捞砂工Mud Engineer 泥浆工程师Cementer 固井工Cement Engineer 固井工程师Testing Engineer 试油工程师Coring Engineer 取芯工程师Wireline Logging Engineer电测工程师三.钻井设备(Drilling Equipment) Drawworks 钻井绞车Rotary Table 转盘Bushing 补心Top Drive System (TDS) 顶驱Swivel 水龙头Crown Block 天车Traveling Block 游车Hook 大钩Derrick 井架Pipe Spinning Wrench 钻杆气动扳手Ezy-Torq 液压猫头Elmagco Brake 涡磁刹车Pipe handling Equipment 钻杆移动设备Iron roughneck 铁钻工Pipe Racking System 钻杆排放系统Drill String 钻柱Drilling Sub 钻井短节Fishing Tool 打捞工具Power Tong 动力大钳Air Winch (air tugger) 气动绞车Crown-O-Matic (Crown Saver) 防碰天车四.泥浆系统(Mud System)Mud Pump 泥浆泵Shale shaker 振动筛Mud Cleaner 泥浆清洁器Desilter 除泥器Desander 除砂器Degasser 除气器Centrifuge 离心机Mud Agitator 泥浆搅拌器Mud Mixing System 泥浆混合系统Centrifugal Pump 离心泵Standpipe Manifold立管管汇Rotary Hose 水龙带Bulk Air System and Tank吹灰系统和灰罐五.井控设备(Well Control Equipment) Ram Type Preventor 闸板防喷器Annular Type Preventor 万能防喷器BOP Stack 防喷器组Gate Valve 闸阀Choke and Kill Manifold 阻流压井管汇Remotely Operated Panel 远程控制面板Choke Control Panel 阻流控制面板BOP Handling Equipment 防喷器搬运设备Diverter 转喷器六.机房(Engine Room)Diesel Engine 柴油机Emergency Generator 应急发电机Air Compressor 空气压缩机Boiler 锅炉Air-conditioning System 空调系统Piping System 管汇系统Generator 发电机Transformer 变压器DC Motor 直流马达AC Motor 交流马达七.安全设备(Safety Equipment)Fire Control System 消防控制系统Fire Detection System 火情探测系统CO2 System 二氧化碳系统Fixed Fire Extinguishing System 固定消防系统Portable Extinguisher 移动灭火器Fire-Fight Equipment 消防设备Foam System 泡沫系统Escape Routes 逃生路线Breathing Apparatus 呼吸器Gas Detection System 气体探测系统Helicopter Facility 直升机设施Sick-Bay (Hospital) 医务室Pollution Control 防污控制八.其他( Others)Cementing Unit 固井装置Well Testing Equipment 试油设备Mud Logging Unit 泥浆录井房Wire Logging Unit 电测装置Meter 米Foot 英尺Inch 英寸Day (night) Shift 白(夜)班Crew Change倒班Position 岗位Evacuation撤离Rig 钻机Quarters (living quarters, accommodation area) 生活区Drill Floor (Rig floor) 钻台Control Room 控制室Air Compressor Room 空气压缩机房BOP Control Room控制房Engine Room 机房Warehouse (Store) 材料库房Sack Storage Area 散装材料储存区Mud pit 泥浆池Riser Rack Area 隔水管排放区Pipe Rack Area 钻杆排放区Pipe Slide滑道Ramp坡道Pump Room 泵房Coffee Room 咖啡室Mess (dining) Room 餐厅Recreation Room 娱乐房TV RoomChange Room工衣房Kitchen 厨房附录四. 钻具,井口工具,打捞工具Drill Pipe 钻杆Drill Collar 钻铤H eavy W eight D rill P ipe 加重钻杆Elevator 吊卡Tong 大钳Make-up Tong 上扣大钳Break-out Tong 卸扣大钳Mud Box泥浆防喷盒Casing Stabbing Board套管扶正器Slips 卡瓦Spider卡盘(蜘蛛)Mouse Hole 小鼠洞(接单根用) Kelly Spinner 方钻杆旋转器Kelly Cock 方钻杆阀Chain Tong 链钳Casing 套管Tubing 油管Drill String 钻柱Jar (drilling jar) 震击器Right Hand Thread 正扣Left Hand Thread 反扣Stabilizer 扶正器Stabilize(v稳定) Liner 尾管Conductor 导管Thread Protector 护丝Stand (钻杆) 立柱Single (钻杆) 单根Joint (钻具) 根Bend弯头Sub 短节Pup Joint 短钻杆, 短节Connector 接头Bit 钻头Bit Breaker 钻头盒Box 母扣Pin公扣Hole Opener 开眼钻头Reamer 扩眼钻头Overshot打捞筒Junk Basket打捞篮Junk Mill 平头磨鞋Spear 打捞矛Fishing Tap 打捞公锥Cross Over Sub (XO Sub) 转换接头Bottom Hole Assembly (BHA) 下部钻具组合附录五. 材料和工具Steel 钢Iron 铁Wood 木Chemicals 化学品Cement 水泥Barite 重晶石Fuel 柴油Helifuel 飞机燃油Lubricant (Lube/Lube oil) 润滑油Grease 黄油Thread Dope 丝扣油Gasoline 汽油Mud 泥浆Bentonite 般土Additive 添加剂Caustic Soda烧碱Weight Material 加重材料Thinner 稀释剂Oxygen 氧气Nitrogen 痰气Hydrogen Sulphide 二氧化硫Acetylene乙炔Compressed Air 压缩空气Hydraulic Fluid 液压油Spanner 扳手Hammer 铁锤Screw Driver 螺丝刀Multi meter 万用表Welding Machine 焊机Bar 撬杠Shackle卸扣Sling (钢丝) 绳套Container 集装箱附录六. 常用缩写形式BHA: bottom hole assembly 下部钻具组合DP: drill pipe 钻杆DC: drill collar 钻铤HWDP: heavy weight drill pipe 加重钻杆BOP: blowout preventer 防喷器TD: total depth总深TVD: true vertical depth (定向井的)垂直深度SCR: silicon controlled rectifier 可控硅OD: outside diameter 外径ID: inside diameter 内径BBL: barrel 桶LB: (拉丁语) Libra=pound (重量单位) PSI: p ound per s quare i nch 磅/英寸2 GAL: gallon 加仑POOH: p ull o ut o f h ole 起钻RIH: r un i n h ole 下钻WOC: wait on cement候凝RPM: revolution p er m inute 转速/分钟LPM: liter per minute 升/分钟SWL: safe working load安全工作负荷API: American Petroleum Institute 美国石油协会IADC: international association of drilling contractors 国际钻井承包商协会MPI: magnetic particle inspection磁粉探伤附录七:常用语Drilling 钻井Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业.Prepared bell nipple. 准备”喇叭口”短节.Make up 2 joints of drill pipe. 接两根钻杆.Break out this connection(joint). 卸开该接头.Run hole opener to sea bed. 下扩眼器到海底Mix gel fluid for drilling conductor hole. 为钻导管井眼配制高粘度泥浆.Make up bottom hole assembly. 组合下部钻具Check and reset crown-saver on every tour. 每个班都要检查并重新调整天车防碰装置.Number stands on trip out and trip in. 起下钻时给立柱编号.Pick up BHA and run to seafloor. 配下部钻具将其下到海底.Pick up stands. 接立柱Don’t drill faster than 15 minute s for 1 stand. 钻进速度别超过15分钟1根立柱Drop TOTCO. 投(陶特)测斜仪Fish TOTCO with overshot. 用打捞筒捞起测斜仪Resume drilling to T.D. 继续钻进到总深Circulate 15 minutes.循环15分钟Run in hole. 下钻Put out of hole. 起钻Make an inventory of all ring gaskets. 开一个所有垫圈的清单Use spinning tong. 使用气动扳手Operate the air winch. 操作气动绞车Lay down 57 joints of 5” drill pipe. 甩57根钻杆Pick up drill stem test tool. 提起钻杆测试工具Circulate mud for 2 hours. 循环泥浆2小时Move string during circulation. 在循环时注意活动钻具Circulate hole clean. 循环清洗井眼Circulate bottoms up. 循环泥浆几周Fill up every 5 stands. 每5柱灌泥浆一次Check mud weight every 15 minutes. 每15分钟检查泥浆比重Reverse out excess cement. 反循环替出多余的泥浆Change/replace old mud by new mud. 用新的泥浆替换出旧的泥浆Stop drilling. 停止钻进Drilling ahead. 钻进Pull out of hole bit. 起出钻头Change bit. 换钻头Run the wear bushing. 下抗磨补心The bit thread type is regular pin. 钻头丝扣是正规公扣What’s the make-up torque?上扣扭矩要多大?Run in 9” collars. 下9”钻铤The cathead can’t give enough torque. 猫头力量不够Connect crossover sub. 接上配合接头The tong angle is too small. 大钳的角度太小了Stop circulating. 停止循环泥浆Break out the stand. 卸立柱Set the single into the mousehole. 把这个单根放进鼠洞Can we break out the pipe with rotary table? 可用转盘卸扣吗? No! Break it out with tong. 不行! 要用大钳卸扣Spin it out with the air spanner. 用气动扳手卸扣Put the pipe wiper on the string. 装上钻杆刮泥器Don’t set this stand back. 这根钻杆不要放在钻杆盒上Make up the lift sub.接好提升短节Secure the safety clamp. 上紧安全卡瓦The bit is nearing the shoe. 钻头快到套管鞋了Slow down the running speed. 放慢下放速度This is the undergauged interval. 这是缩径井段This is the drilling program. 这是钻井设计书How much weight on bit is required? 要加多少钻压?Keep the rotary speed at 120---140 RPM. 转速保持120---140转/分Keep the flow rate at 30.00 LPM. 保持排量30升/分The pump pressure is too high. 泵压太高了Don’t ream the hole too fast. 划眼不要太快Notice the rotary torque. 注意转盘扭矩的变化The penetration rate is getting slower. 钻速变慢了The bit is nearly worn out. 钻头快磨光了Stop drilling at 2000 meters. 钻至2000米停钻Circulate for one hour. 循环一个小时The pump pressure has increased. 泵压升高了One nozzle may be plugged. 可能有一个水眼(或: 喷嘴)堵了What is the hook load? 悬重多少?What’s the pick-up weight? 上提重量是多少?What’s the lowering weight? 下放重量是多少?Run in HWDP. 下加重钻杆A stabilizer is needed here. 这里需要一个扶正器This is a flexible sub. 这是挠性接头This is the BHA log. 这是下部钻具组合记录Record all outside and inside diameters. 记录好所有(入井工具的)内外径We need a short drill collar. 需要一根短钻铤Pull the cat line. 拉猫头Operate the break lever. 操作(或:扶)刹把Stop the pumps. 停泵Make a wiper trip. 通井Retrieve wear bushing. 取出抗磨补心Bleed off pressure. (释)放压(力)Keep 5 wraps on the drum. 滚筒上留5圈Set slips. 座上卡瓦If tight hole, repeat wiper trip. 如果井眼缩径, 重复划眼Setback bottom hole assembly. 将下部钻具立于钻杆盒内Make sure all alarms are on. 确保所有的警报信号都开着Lay down TDS spinner. 拆下顶部驱动的旋扣器Run in hole bit #15 to bottom. 用15号钻头下钻到井底Run in hole to casing shoe. 下钻至套管鞋Pick up same bit and BHA. 装上同样的钻头和钻具组合Lay down5” HW drill pipe. 甩5”加重钻杆Move string every 2 hours. 每2小时活动钻具一次Keep area around shaker clean. 保持振动筛区域干净Control trip gas. 控制起下钻气Ream if needed. 如必要时进行划眼Select the best penetration rate. 选择最佳钻进速度Fix the traveling assembly.固定游动系统Check power tongs and spinning rope are on drill floor. 检查动力钳和尾绳是否在钻台What’s the weight on bit? 钻压是多少?What is the BHA of this well? 这口井的下部钻具如何组合?Drill out cement. 钻穿水泥Drill out 20” casing shoe. 钻穿20”套管鞋Latch the elevator. 扣吊卡Unlatch the elevator. 开吊卡Set the slips. 放卡瓦Adjust the crown-o-matic (crown saver). 调整防碰天车Lock the hook pin. 锁紧大钩销子Check OD of stabilizer. 检查扶正器的外径Perform leak off test. 进行地层破裂(或:渗漏)测试Connect kill and choke line. 接上压井和放喷管线Reverse out the drill pipe. 反循环清洗钻杆Make a short trip. 进行短途起下钻Change the cutters. 换割刀Slug the pipe. 灌重泥浆Drill the stand down. 钻完立柱Start/run the shale shaker. 开振动筛Start the desanders. 开除砂器Start the desilters. 开除泥器Change it with a 40 mesh screen. 换成40目筛布Shut it off. 关掉Pull it to the cat ramp. 把它拉到坡道上去Make a fast connection. 接单根要快Don’t dump the mud to the wellsite. 不要把泥浆排放到井场Disconnect it with a chain tong. 用链钳卸开Put a thread protector.加一个(丝扣)护箍Can we use the power slips? 可以使用动力卡瓦吗?Casing and Cementing 下套管与固井Run in hole to bottom for wiper trip. 下钻通井This is the casing program. 这是套管程序Prepare for running casing. 准备下套管Make everything ready for running 7”casing. 做好下7”套管的准备Make cementing job. 固井Displace cementing with mud pump. 用泥浆泵替泥浆Set cement plug from 2940 to 2790m. 在2940到2790米井段打水泥塞Pick up cementing head.接水泥头Cement samples are hard. 水泥样已凝固Pump in 3 cubic meters of spacer.注3方隔离液Pump down the plug. 泵压(胶)塞Wait on cement. 候凝The guide shoe will be connected. 接引鞋Connect the floor collar. 接浮箍Connect the air line to the casing stabbing board. 接好套管扶正台的气管线Run casing with the 350T slip elevator. 用350吨卡瓦式吊卡下套管Clean and dry 20” casing threads with rags. 清洁并擦干20”套管丝扣Where is the rabbit for drifting the casing? 套管通径规在哪里? How much is the horse power? 有多大马力?She has 6000 HP. 有6000马力Unleash the drilling tools. 卸开钻具Tighten up. 绷紧(或:上紧)一点Fishing 打捞The bit cutters have been lost in the hole. 牙轮落井Run in the reverse-circulation basket. 下反循环打捞篮There is a lot of junk in the hole. 井下有很多落物The fish is 235.46 meters long. 落鱼长度235.46米The fish top is at 2478.34 meters. 鱼顶位置2478.34米Coring 取芯Stop drilling for coring. 停钻准备取芯Make up core bit. 接取芯钻头What type of core bit is it? 这是什么型号的取芯钻头?Run in a diamond core bit. 下金刚石取芯钻头Let’s drop the ball for coring. 可以投球取芯The core has been broken off. 岩芯断了Put the core in the boxes. 把岩芯装在岩芯盒里Don’t brake suddenly. 不要猛刹车Take out the core. 岩芯出筒How long is the core? 岩芯多长The core recovery is 98%. 岩芯收获率是98%Run in the core barrel again. 继续下岩芯筒(或: 取芯筒)Run in hole core barrel. 下取芯筒Drop ball. 投钢球Recover core. 取出岩芯Use same parameters as for core #1.使用与1#取芯同样的参数Freeing Stuck Pipe 卡钻与解卡The down-hole problems are very complicated. 井下情况很复杂The hole is tight. 遇阻了Overpull while tripping out. 起钻遇卡(overpull: 超拉力) The formation is unstable. 地层不稳定The wall caving is severe. 井壁垮塌严重There are many return cuttings. 返出岩屑特别多The mud returns have decreased. 返出泥浆减少The hole is enlarged. 井眼扩大了The pipe’s stuck. 卡钻了Pull up to 150 tons. 上提150吨Slack off to 50 tons. 下放至50吨Ream down all the tight points. 在所有遇阻点进行划眼The rotary table can’t rotate. 转盘转不动Where is the sticking point? 卡点在哪里Make a tensile test. 做拉伸试验Back it off above the free point. 在卡点以上倒扣Where is the back-off position? 脱扣位置在哪Plug the well for side tracking. 打水泥塞侧钻Abnormal Well Condition and Well Control异常井况与压井The mud is gas out. 泥浆有气侵The pit has lowered quickly. 泥浆池液面下降很快The hole lost returns. 井口不返泥浆The returns are unstable. 返出泥浆量忽大忽小Where’s the thief zone? 漏失层在哪里Cut down the flow rate. 降低排量Lower the mud density. 降低比重Cut down the hydrostatic pressure. 减少静压The gas smell is strong. 天然气味度很浓There’s some trace of oil. 发现有油花The pump pressure is fluctuating. 泵压不稳It is a zone of abnormal pressure. 这是异常压力层The hole (well) is kicking! 井涌啦!Shut in the BOP! 关闭防喷器Sound the general alarm quickly! 快发出综合警报The stand pipe pressure is 10 kg/cm2. 立管压力10公斤/厘米2The casing pressure is 25 kg/cm2. 套压2510公斤/厘米2Fill out the kill sheet. 填写压井记录表Kill the well. 压井There’s a combination of lost returns and the kick. 又喷又漏, 情况复杂Reverse the gas out of the hole. 反循环排气What’s the lag time? 迟到时间是多少The well is now stable. 现在井眼已经稳定BOP and subsea Equipment 防喷器与水下设备Cut off the 30” conductor. 割掉30”隔水管Weld on the 30” bottom flange. 焊接30”法兰Hoist and nipple up 30” diverter. 吊装30”转喷器Change the 5” pipe rams to 3-1/2” rams. 把这个5”闸板换成3-1/2” Install blind ram. 安装防喷器的盲板芯子Check the seal ring of the conductor. 检查隔水管密封圈Cut off the lifting eye of the conductor. 切割隔水管耳环Test BOP. 测试防喷器Change annular BOP packing. 更换万能防喷器芯子Full pressure test the ram preventers. 对闸板防喷器进行全压试压Test annular BOP at 2500psi. 万能防喷器试压至2500psiCheck annular pressure. 检查环形空间压力Confirm the angle of the guide base. 确定基板角度The thread is covered with the quick-release protectors. 已戴好快卸护丝Establish the guide lines. 装导向绳Connect the TGB running tool. 接临时导向基板送入工具Land the TGB to sea. 下临时导向基板到海底Retrieve the running tool. 退出送入工具Run the BOP and risers. 下防喷器和隔水管Pick up the marine riser. 吊出隔水管Pick up the slip joint. 起伸缩节Adjust the riser tensioners. 调整隔水管张力Function test the diverter system. 对防喷器系统进行功能测试Retrieve the pin connector. 取出销钉连接器Run the test plug. 下试压塞Close the upper pipe ram. 关上部钻杆闸板防喷器Open the kill line valve. 开压井管线阀The compensation capacity is 400000 pounds. 补偿能力是400千磅The locking load is 1000000 pounds. 锁紧负荷1000千磅Land the BOP onto the well head. 座防喷器到井口头BOP carrier. 防喷器叉车Check for junk inside shoe joint. 检查浮鞋内有无落物Pick up 30” conductor handling slings and shackles. 吊上下30”导管的索具和卸扣Is slope indicator properly mounted? 水平仪是否装好?Check condition of all 30” casing connectors. 检查所有30”套管接头的情况Replace O-rings as required. 按需要, 更换O性密封圈Inspect and repair diverter. 检查并修理转喷器Record all pressure tests on a chart recorder. 用试压表记录试压记录Visually inspect all sealing element. 目视检查所有密封件Check and tighten all bolts. 检查并上紧所有螺栓Bleed off surface accumulators. 地面管线排空气Check for leaks. 检查有无泄漏Lift BOP stack and replace wellhead connector AX ring. 吊起防喷器组并更换连接器AX密封圈Function test wellhead. 对井口头进行功能试验Pressure test to 500psi then bleed off test pressure. 试压到500psi, 然后放掉压力Reduce hydraulic control manifold pressure to 5200 kpa. 将液压控制管线压力减少到5200千帕Switch to alternate control pod. 把闸门开关倒到控制面板Pressure test to 5000psi. 试压5000psiPick up test mandril and place in BOP. 吊起试压防喷器芯子并装入防喷器组Safety and Firefighting 安全与消防Get a Work Permit before you can start the hot work. 办理作业许可证才能进行动火作业Welding is not allowed. 不准动焊Put on your (safety) helmet. 戴上安全帽It’s a high voltage area. 这是高压区That’s against the rule. 这是违章作业Don’t walk under the crane load. 不要在吊物下走动The repairing is under way. 正在检修Keep your hands clear! (Keep you hands off! Do not touch!) 不要乱动Wear and secure your safety belt. 戴上并系好安全带Have your breathing apparatus near you. 保持防毒面具在附近It’s a drill. 这是演习It was a BOP drill. 这是防喷演习It’s for fire fighting. 这是消防用的This rope is too small. 这根绳子太细了A warning notice should be set up. 要挂警告牌Do you have an emergency program (contingency plan)? 你们有没有应急计划? It must be ready in an emergency condition. 必须始终保持良好的应急状态Sound fire alarm. 发消防警报This is a fire drill. 这是消防演习Remove the rust and paint with anti-corrosive primer. 除锈后上防锈底漆The station bills need to be updated. 应急部署表须更新Check the expiry date for all foam extinguisher. 检查所有泡沫灭火器的过期时间Safety procedure shall be followed at all the times. 在任何时候都应遵守安全程序Don’t switch on during drilling operation. 钻井作业期间不能合闸Provide two independent means to start the emergency generator engine. 应急发电机柴油机应有两套独立的起动方法Tell the base to get (or send) a chopper here. 通知基地派飞机来Helicopters are not allowed to land here. 飞机不能降落Report the weather condition to the pilot. 向飞行员报天气Repair and Maintenance 检修Have an overall check. 进行全面检查MPI the brake linkage system. 对刹车连接系统进行磁粉探伤Demonstrate that the make-up cathead can pull 7000 lbs. 证明上扣猫头能拉到7000磅Determine the origin of the air leak and rectify this. 找出漏气的地方并处理Note that the 3000 hour inspection on TDS is due. 注意顶驱的3000小时保养时间已到Check she ave rope pocket wear with a 1 3/8”+1 1/32 template. 用1 3/8”+1/32”量规检查绳槽磨损的情况Repair the handrails on the crown. 修理天车台的栏杆Function test the anti-freefall brake on monthly basis. 每月对天车防碰装置进行功能试验Get me a spanner, please. 请递给我一把扳手Renew brake rim because of excessive wear. 更换磨损严重的刹车鼓Clearly mark safe working load (SWL) on the air winch below the rig floor. 表明钻台底下气动绞车的安全工作负荷Measure the master bushings for wear. 测量主补心磨损情况Have BOP ram opened up for internal inspection. 打开防喷器闸板进行内部检查ground cable 地线triplex pump 三缸泵We need a 48” pipe wrench. 我们需要一把48”的管钳Strike it with a sledge hammer. 用大锤打We want a triangle file. 需要一把三角锉刀Tighten up the screw. 紧一下螺丝Check it with a level. 用水平尺量一下Put some engine oil. 抹点黄油Have it greased. 给它上黄油Check all the equipment. 检查所有设备There’s something wrong with it. 有点毛病Maintain the hoisting system. 保养提升系统Adjust the brake band. 调整绞车刹带Change the oil in the rotary gear box (transmission). 更换转盘变速箱机油Replace one water pump. 倒换一台冷却泵It’s quick-discharge air valve. 这是快速放气阀This clutch needs repair. 这台离合器需修理This tong needs replacing. 这把钳要更换了Cut off 45 meters of the drilling line. 切割大绳45米Check the pump liners and pistons. 检查(泥浆)泵缸套和活塞The piston has been washed. 活塞刺坏了The supercharge pump doesn’t take in water.灌注泵不上水Regulate the relief valve. 调整安全阀This part number is wrong. 这个配件号不对The multi-pen recorder has some problem. 多笔记录仪坏了Miscellaneous 其他No smoking here. 此处严禁吸烟Everything is OK. 一切准备就绪Speed up please. 请快点The geologist must be present. 地质人员必须到场Give me a hand, please. 请帮一下忙Do you understand? 明白吗?No way! 不行Help! Help! 救命Someone is injured. Medic! 有人受伤了, 医生Call for the medic. 叫医生Get a stretcher please. 拿担架来No more than 4 persons. 不能超过4人Drinking liquor is not allowed. 不许喝酒Don’t overrun your equipment. 不要超负荷运转Be careful at work. 工作时要小心No joking here. 别开玩笑Rig up for logging. 准备电测What is the next step? 下一步怎么办?Get everything ready as soon as possible! 尽快做好一切准备21。

钻井英语教材(修改版)

钻井英语教材(修改版)

钻井英语目录第一节钻井英语单词 (3)第二节井场用语,钻井常用短语及句子 (12)第三节钻井泥浆术语 (31)第四节常用安全术语 (33)第五节钻井设备英语 (35)第六节石油钻井英语情景会话 (42)附录一:平台人员、作业者及服务公司人员名称 (49)附录二:主要设备名称 (50)附录三:钻具、井口工具、打捞工具名称 (54)附录四:材料和工具名称 (55)附录五:常用缩写形式 (57)第一节钻井英语单词drilling crew 钻井队drill floor,rig floor,floor 钻台drawworks 绞车well-site, rig-site 井场rig manager 平台经理DC (drill collar) 钻铤drilling engineer 钻井工程师DP (drill pipe) 钻杆toolpusher 带班队长rotary table 转盘driller 司钻assistant driller 副司钻derrickman, monkeyman 井架工roughneck, floorman 钻工roustabout 场地工liner 缸套motor fire man 司机(motorman)wellhead 井口circulation & solid system 循环固控系统machinist 机械师,机工,机械大班electrician 电器师,电工,电器大班operation program 作业程序(指令) cathead 猫头caravan 营房,大篷车tong 大钳elevator 吊卡well depth 井深slip 卡瓦makeup 上扣spud in 开钻breakout 卸扣ROP (rate of penetration),drilling speed, penetration rate 钻速trip 起下钻diesel-engine 柴油机loss circulation 井漏,循环漏失working uniform 工作服brake handle, brake bar 刹把water well condition 水井井况circulating tank, circulation tank 循环罐normal drilling 正常钻进reserve tank 储备罐parameter 参数trip tank 补给罐,尖底罐, 起下钻泥浆罐(起下钻计量罐)rotary speed 转盘转速(转速)shale shaker 振动筛pump pressure 泵压WOB (weight on bit) 钻压mesh 目,网孔;啮合,编织torque 扭矩screen cloth 筛布displacement 排量safety meeting 班前会pump stroke 泵冲shift exchange 交班、(倒班)mud pump 泥浆泵master 师傅,主人;征服,控制,精通in charge of 负全责,经营,照顾obtain 获得,得到according to 根据,依照normal 正常的,正规的,标准的introduce 介绍,传入,引进,提出progress 前进,行进,进展supervisor 监督location 井场,井位inspection 检查,考察,验收cellar 方井soild (control) system 固控系统waste pit 污水池、废水池Top Drive (Drilling System)顶(部)驱(动)钻井系统Project Department 项目部on duty 值班modify 整改、修改clinic 医务室electic al rig 电动钻机disconnect 拆开,分离,断开pipeline 管线order 指令,命令,顺序Company 公司,甲方Operator 业主,甲方Contractor 承包商,乙方pump house 泵房schedule 时间表,进度表size 尺寸,大小,尺码information 通知,信息,资料equipment 设备,装备,器材instruction 指令,指示,说明书SCR house 可控硅房replace 更换,替换,代替brake shoe 刹车块wear out 磨损safety 安全,保险,安全设备fax 传真guy 家伙,人standpipe 立管Campsite 营地crownblock 天车traveling block 游车dog-house 司钻休息室(钻工值班房) rat hole 大鼠洞mouse hole小鼠洞spudding inspection 开钻验收fill in 填充catwalk 狭窄的过道,高空走道;高台,天车台casing float collar 套管浮箍casing float valve 套管浮阀casing guide shoe 套管引鞋cement水泥,注水泥,结合剂,胶结剂plug 插头safety pin安全销glove手套quick-connector快速接头fire exting u isher灭火器stretcher担架First Aid紧急救护control board控制板weight mdicator指重表rotary torque indicator转盘扭矩表sling吊绳绳套deadline anchor死绳固定器brake system刹车系统drum滚筒safety line保险绳safety belt安全带hydraulic tong液压大钳slip卡瓦(和上面的重复)elevator吊卡(和上面的重复)bit breaker钻头盒chain tong链钳pipe tong管钳wrench板手pliers钳子、老虎钳scissor剪刀cable slot电缆槽vacuum degasser真空除气器butterfly valve蝶阀desilter除泥器desander除砂器degasser除气器mud gun泥浆枪agitator搅拌器leakage漏,泄漏,渗漏barite重晶石hopper漏斗piston活塞union由壬fuel tank燃油罐、高架罐remote control station远控房BOP stacks防喷器组kill line 压井管线choke line节流管线blowout preventer防喷器annular环空ram闸板low pressure低压fire blanket消防毯fire sand防火砂kitchen厨房storeroom储藏室bathroom卫生间(浴室)spudding date开钻日期spudding time 开钻时间string钻柱BHA(bottom hole assembly)井下钻具组合drilling jar随钻震击器drill box钻杆盒drilling program钻井程序、钻井指令drilling fluid钻井液mix up混和、调配、混淆mud material泥浆材料LCM(lost circulation material)堵漏材料、堵漏剂mud engineer泥浆工程师day tour白班night tour夜班drilling progress钻井进度routine inspection例行检查、日常cave in塌陷、塌下、井壁坍塌loss漏失kick井涌hole section井段casing setting depth套管坐封深度downhole problem(trouble)井下事故(井下复杂情况)undergauge 缩径tight hole井径缩小的井眼tight spot (井径)缩小点、缩小段footage钻井进尺formation地层、岩层、构造、组织make up a joint接单根(立柱)sticking 粘附、刺、卡钻sticking point卡点free point解卡点??hook weight悬重unfreeze解卡back-off倒扣fishing 打捞sidetrack侧钻back reaming倒划眼soak oil泡油soak releasing 泡解卡剂slough off坍塌ream down划眼borehole operation井下作业deviational survey 井斜测量(测斜)make a trip 起下钻bouncing 跳跃的、大的、重的、跳钻bit bouncing 蹩跳bit balling 泥包钻头cutting 切削、切割、切屑、钻屑cutting sample 砂样mud logging 综合录井sandstone 砂岩Pooh(pull out of hole) 起钻RIH(run in hole)下钻junk 落物、金属屑、碎物junk sub 打捞(落物)接头scrape 擦、刮、擦痕、刮掉bit gauge 钻头规centralizer 扶正器hold pressure 蹩压day rate 日费standby rate 等待日费、待命费run casing下套管cementing operation固井作业drift casing套管通径??clean thread洗扣geologist地质师、地质学家casing shoe套管鞋thread protector护丝casing tong套管钳wiper trip通井rigid centralizer刚性扶正器guide shoe引鞋float-collar浮箍accident事故、意外事件slurry水泥浆WOC(waiting-on--cement)候凝期nipple up安装(防喷器)primary cement job正注固井wireline log电测test pressure 试压International practice国际惯例choke manifold节流管汇lay down the string倒钻具nut螺母bolt螺栓、螺钉screw bolt螺栓、螺杆pipe ram半封闸板shut-down停工HWDP (heavy weight drill pipe) 加重钻杆calibrate 校正、定标judgment 判断bleed off lin e排砂(排放)管线commence 开始、着手isolate 隔离、隔绝、绝缘welding 焊接、压实、压结mud property 泥浆性能MW(mud weight) 泥浆比重mud density 泥浆密度funnel viscosity 漏斗粘度PV(plastic viscosity) 塑性粘度well control drill 井控演习、防喷演习increase 增大、增加、增大decrease 减少、降低;减少之量pressure gauge 压力表casing pressure 套(管)压(力)choke valve 节流阀coring operation 取心作业hole collapse井壁坍塌pressure surge 压力激动、压力涌动bump pressure 碰压cement head 水泥头re v erse circulation 反循环cement 水泥,注水泥;结合剂;粘紧,粘牢(重复)cement accelerator 水泥促凝剂cement hardener 水泥速凝剂, 水泥硬化剂cement head (注) 水泥头cementing jobs 注水泥作业cement job 固井作业cement squeeze 挤水泥bonus 奖金,红利completion job 完井作业hand pump 手摇泵,手压泵workshop 车间,工场nipple down 卸下nipple up 装上,接上,装配,安装(重复) ID (inside diameter) 内径torque-on-bit 钻头扭矩tubing bonnet 油管头tubing hanger 油管悬挂器, 油管挂tubing joint 油管接箍landing head (悬挂油管用)油管头,(油管)联顶头landing joint 联顶节[下套管或油管联顶时用]TBG (tubing) 油管spacer fluid 封隔液mud logging unit 综合录井仪cooperation 合作,协作sample sack 砂样袋engage 从事;啮合deadline anchor 死绳固定器,死绳锚(重复)drilling cost 钻井成本evaluate 评价,估价,求…的值in advance 预先overpressure 过压,超压力swab 抽汲eliminate 排除,消除pipe bouncing 钻具蹩跳drill string failure 断钻具twist-off 脱扣horizontal well 水平井vertical well 垂直井stainless steel 不锈钢anticline 背斜porosity 孔隙度potential 潜在的,可能的; 潜能,潜力densimeter 密度计communication 传达,信息,交流,通讯hook velocity 大钩速度verify 检验,查证,核实confirm 确定,批准,印证incredible 难以置信的round trip 起下钻resume normal drilling 恢复正常钻进goal 目的,目标understanding 理解,认识,谅解kill operation 压井作业wireline [electric] log 电测井GR 自然伽玛scrap iron 铁屑cotton yarn 棉纱paint 油漆cavern 大山洞,大岩洞,溶洞,穴fossil 化石;陈腐的,守旧的gas-bearing 含气的water-bearing 含水的DST(drill-stem test) 中途测试, 钻杆测试water loss 失水flow pressure 流动压力daily output 日产量target zone 目的层finishing drilling 完钻thermometer 温度计re v er s e circulation 反循环build up 建造,安装;压力增加,压力恢复build up a joint??Well Control & Drill Procedures井控措施及防喷演习程序LIST OF ABBREVIATIONS缩写表BHP - Bottom-Hole Pressure 井底压力BOP - Blow out Preventer 防喷器(重复)CDPP - Circulating drill pipe pressure 循环钻杆压力CP - Casing pressure 套管压力(重复)CSG – Casing 套管(重复)DC - Drill collar 钻铤DP - Drill pipe 钻杆ECD - Equivalent circulating density当量循环密度EMW - Equivalent Mud Weight 当量泥浆比重FCP - Final Circulating Pressure 最终循环压力Gm – Mud weight 泥浆比重HPHT - High pressure high temperature 高压高温HWDP - Heavy Weight Drill Pipe加重钻杆(重复)ICP - Initial Circulating Pressure初始循环压力LOT - Leak-Off Test地漏测试MAASP - Maximum Allowable Annular Surface Pressure最大容许环空表面压力MD - Measured depth测量深度MEMW - Maximum equivalent mud weight最大当量泥浆比重Ps - Static pressure静压力Q - Flow rate 流量ROP - Rate of penetration机械钻速SICP - Shut-in Casing Pressure关井套压SIDPP - Shut-in Drill Pipe Pressure关井钻杆压力TVD - Total vertical depth垂直总深kill and choke lines 压井和节流管线kill fuild 压井液killing well 压井kill job 压井作业kill line压井管线kill rate 压井排量kill string 压井管柱kill-weight-fluid 加重压井液,高比压井液operating skill 操作技巧view point 观点engage in 从事,啮合primary control 首要控制,一次井控secondry control 二等控制,二次井控tertiary control第三位控制,三次井控safety margin 安全系数circulate out循环带出wildcat 探井pressure surge 压力波动,压力骤增(重复)Kick Control Sheet 井涌控制表circulating bottoms up循环井底至井口的泥浆行程active mud system在用泥浆系统fill the hole 灌满井眼human failure 人为事故differential pressure压差additive 添加剂obstruction阻塞,阻挡evidence 迹象,证明lower Kelly cock 方钻杆下旋塞upper Kelly cock 方钻杆上旋塞stripping 强行起下钻potential 潜在的,可能的;势,位shut-in procedures 关井程序,关井步骤soft shut-in procedures 软关井程序with a careful eye on留心saver sub 保护接头pipehandler 管子操作装置Driller’s Method 司钻法water-based system 水基体系implement 执行overcome 克服Daily Drilling Report 钻井日报表up-to-date 现代化的,最新(式)的,当今的chilksan line活动弯头管线H2S ( hydrogen sulfide) 硫化氢Muster point (Muster board) 紧急集合点(紧急集合点标识牌)Wind sock 风向标SCBA (self-contained breathing apparatus) 呼吸器Oxygen, acetylene 氧气,乙炔Alarm 警报Ambulance 救护车Emergency team 应急小组Fire pump, Fire drill, Fire hose, ax, rope 消防泵,消防演习,消防水龙带,消防斧,消防绳JSA (job safety analysis)工作中安全因素分析HSE (health, safety and environment) 健康,安全,环保Escaping route 逃生路线Inflammables 易燃物品Work Permit (Permit to Work) 工作许可(证)Safety meeting for running casing, liner, electric log 下套管,尾管,电测安全会PPE (personal protection equipment) 劳保用品Special operation 特殊作业Vehicle inspection 车辆检查Housekeeping 打扫卫生Crane 吊车MSDS(material safety data sheet)泥浆药品安全使用手册first aid box 急救箱Helmet安全帽Safety glasses 护目Fall arrester 防坠器VIS (viscosity) 粘度PV (plastic viscosity) 塑性粘度(重复)YP (yield point) 屈服粘度(流动点) Gels (gel strength) 静切力(胶凝强度)low viscosity低粘high viscosity (hi-vis)高粘lightweight low-viscosity mud低比重低粘泥浆water tank水罐caustic soda 烧碱dangerous 危险sand trap 沉沙罐、锥形罐trip tank 计量罐pill tank加药罐waste pit 排沙池fluid loss 失水第二节井场用语,钻井常用短语及句子钻井(Drilling)1、Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业。

石油专业英语(钻井)课件

石油专业英语(钻井)课件

石油专业英语(钻井)2008-08-02 21:02Drilling 钻井Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业. Prepared bell nipple. 准备”喇叭口”短节.Make up 2 joints of drill pipe. 接两根钻杆.Break out this connection. 卸开该接头.Run hole opener to sea bed. 下扩眼器到海底Mix gel fluid for drilling conductor hole. 为钻导管井眼配制高粘度泥浆.Make up bottom hole assembly. 组合下部钻具Check and reset crown-saver on every tour. 每个班都要检查并重新调整天车防碰装置.Number stands on trip out and trip in. 起下钻时给立柱编号.Pick up BHA and run to seafloor. 将下部钻具下到海底.Pick up stands. 接立柱(一个立柱就是三根钻杆接在一起)Don’t drill faster than 15 minutes for 1 stand. 钻进速度别超过15分钟1根立柱Drop TOTCO. 投(陶特)测斜仪Fish TOTCO with overshot. 用打捞筒捞起测斜仪Resume drilling to T.D. 继续钻进到总深Circulate 15 minutes.循环15分钟Run in hole. 下钻Put out of hole. 起钻Make an inventory of all ring gaskets. 开一个所有垫圈的清单Use spinning tong. 使用气动扳手Operate the air winch. 操作气动绞车Lay down 57 joints of 5”drill pipe. 甩57根钻杆Pick up drill stem test tool. 提起钻杆测试工具Circulate mud for 2 hours. 循环泥浆2小时Move string during circulation. 在循环时注意活动钻具Circulate hole clean. 循环清洗井眼Circulate bottoms up. 循环泥浆几周Fill up every 5 stands. 每5柱灌泥浆一次Check mud weight every 15 minutes.每15分钟检查泥浆比重Reverse out excess cement. 反循环替出多余的泥浆Change/replace old mud by new mud.用新的泥浆替换出旧的泥浆Stop drilling. 停止钻进Drilling ahead. 钻进Pull out of hole bit. 起出钻头Change bit. 换钻头Run the wear bushing. 下抗磨补心The bit thread type is regular pin. 钻头丝扣是正规公扣What’s the make-up torque? 上扣扭矩要多大?Run in 9”collars. 下9”钻铤The cathead can’t give enoughtorque. 猫头力量不够Connect crossover sub. 接上配合接头The tong angle is too small. 大钳的角度太小了地质年代术语英汉对照2008-08-0221:04stratum 地层stratigraphic correlation 地层对比horizon 层位key bed 标志层barren bed 哑层lacuna 缺失hiatus 间断continuity 连续discontinuity 不连续conformity 整合unconformity 不整合angular unconformity 角度不整合para-unconformity 平行不整合geochronologic unit 地质年代单位eon 宙era 代period 纪epoch 世stage 期chron 时chronostratigraphic unit 年代地层单位eonothem 宇erathem 界system 系series 统stage 阶chronozone 时带biostratigraphic unit 生物地层单位biostratigraphic zone 生物地层带lithostratigraphic unit 岩石地层单位group 群formation 组member 段bed 层geochronologic scale 地质年代表Phaneozoic Eon(Eonothem)显生宙(宇)Cainozoic Era(Erathem) 新生代(界)Cenozoic Era(Erathem) 新生代(界)Quaternary Period(System) 第四纪(系)Holocene Epoch(Series) 全新世(统)Pleistocene Epoch(Series) 更新世(统)Tertiary Period(System) 第三纪(系)Neogene Period(System) 新第三纪(系)Pliocene Epoch(Series) 上新世(统)Miocene Epoch(Series) 中新世(统)Paleogene Period(System) 老第三纪(系)Oligocene Epoch(Series) 渐新世(统)Eocene Epoch(Series) 始新世(统)Paleocene Epoch(Series) 古新世(统)Mesozoic Era(Erathem) 中生代(界)Cretaceous Period(System) 白垩纪(系)Jurassic Period(System) 侏罗纪(系)triassic Period(System) 三叠纪(系)Palaeozoic Era(Erathem) 古生代(界)Permian Period(System) 二叠纪(系)Carboniferous Period(System) 石炭纪(系)Devonian Period(System) 泥盆纪(系)Silurian Period(System) 志留纪(系)Ordovician Period(System) 奥陶纪(系)Cambrian Period(System) 寒武纪(系)Cryptozoic Eon(Eonothem) 隐生宙(宇)Proterozoic Eon(Eonothem) 元古宙(宇)Neoproterozoic Era(Erathem) 新元古代(界)Sinian Period(System 震旦纪(系)Mesoproterozoic Era(Erathem) 中元古代(界)Palaeoproterozoic Era(Erathem) 古元古代(界)Archaean Eon(Eonothem) 太古宙(宇)Precambrian 前寒武纪石油钻井词汇Part One SLICK-LINE(钢丝作业)A. TOOLS rope socket 绳帽stem 加重杆roll stem 滚轮加重杆Tungsten stem 钨加重杆Lead stem 铅加重杆link jar 机械震击器tubular jar 管状震击器hydraulic jar 液压震击器spring jar 弹簧震击器knuckle joint 万向节swivel joint 旋转节wellhead adapter 井口变扣短节X-Over 变扣gauge cutter 通井规selective downshift tool 选择性滑套开关工具shiftting tool 移位工具blind box 盲锤L.I.B(lead impression block) 铅印swaging tool 胀管器spear 打捞矛prong grab 内捞矛center spear 外捞矛catcher 捕捉器wirefinder 钢丝探测器Go devil-F.B 平底撞棍Go devil-C.B 刀杆撞棍retriever 钢丝打捞器overshot 卡瓦打捞筒magnetic fishing tool 磁力打捞工具sidewall cutter 刮管刀alligator grab 鳄鱼爪sand bailer 捞沙筒pipe wrench 管钳tong chain 链钳spanner 扳手wireline clamp 钢丝夹hay pulley 地滑轮dump bailer 倾倒筒saw 锯子saw blade 锯条punch 冲子file 锉刀flat file 板锉,扁锉hammer 榔头pliers,vice 老虎钳wire cutter 断线钳forfex 剪刀tongs 大钳,钳子,管钳flat bit tongs 扁嘴钳screwdriver 改锥,螺丝刀wire stripper 剥皮钳,掳线钳wire-stripper pliers 剥线钳B. EQUIPMENTstuffing box 防喷盒lubricator upper section 上防喷管lubricator middle section 中防喷管lubricator lower section 下防喷管blowout preventer(BOP) 防喷器wellhead adapter 井口变扣短节Lincoln pump 林肯泵hand pump assy.for stuffing box 手压泵Fire extinguisher 灭火器hand tool box 手工具箱injector 注油器lifting cap BOP吊帽trolly 防喷管支撑架parasol 阳伞work vice 台钳chain block 链葫芦tie down chain 系紧链fixed pulley 定滑轮wobble pump 手摇泵wire line clamp 钢丝绳夹wire rope sling 绳套,钢丝吊绳winch 绞车winch barrel(drum) 绞车滚筒winch brake 绞车刹车winch drive shaft universal joint 绞车主动轴万向节winch drum shaft 绞车滚动轴winch line 吊装用绳套winch control panel 绞车控制面板winch truck 吊车C. OPERATIONSRTTS Operation for Shoot andPull RTTS完井服务RTTS Operation for CementSqueezing RTTS固井服务(挤水泥)Pulling Y Block 捞Y堵塞器Open SSD(Slide Side Door) 开生产滑套Close SSD(Slide Side Door) 关生产滑套Open Circulating SSD(Slide SideDoor) 开循环滑套Close Circulating SSD(Slide SideDoor) 关循环滑套Running Gauge Cutter 通井Clean up 地面完井放喷Open Drain Valve 砸泻油阀Pulling Test Plug 捞测试阀Running Jet Pump 投射流泵Pulling Jet Pump 捞射流泵Running Flow Regulator 投配水器Pulling Flow Regulator 捞配水器Fishing Drop Bar 捞点火棒Measuring Static Pressure 测静压Measuring Flowing Pressure 测流压Measuring BHPBU(Bottom Hole Pressure Build Up) 测压力恢复Measuring BHP(Bottom Hole Pressure) Testing with Jet Pump 带泵测压(射流泵)Multi-Rate BHP(Bottom Hole Pressure) Testing 系统试井Slick-line Operation for Completion 钢丝配合完井服务Slick-line Operation for acidizing 配合酸化钢丝作业Running Plug 投堵塞器Pulling Plug 捞堵塞器Run Impression Block 下铅印Running Prong 投平衡杆Sand Level detection 探沙面Run Sand Bailer 下捞砂桶Open SSSV(Sub Surface Safety Valve) by Force 强行打开井下安全阀Running Go Devil 剪切钢丝Fishing Slickline 打捞钢丝Running Side Pocket Plug 投偏心堵塞器Pulling Side pocket Plug 捞偏心堵塞器Running Side Pocket Check Valve 投偏心阀Pulling Side Pocket Check Valve 捞偏心阀Sand Sampling 取砂样Stable Test 稳定试井Slickline Swab 抽吸Running Hanger 投悬挂器Pulling Hanger 捞悬挂器D. SPARE PARTSgrease injection control head 注脂头grease oil 注脂油grease oil tank 注脂油桶BOP pump c/w hose 手压泵及管线pressure test hose 试压管线lubricator bleed off manifold 防喷管针阀Martin Decker W-15 oil 马丁代克油Martin Decker WT indicator c/whose 指重器及管线picking for stuffing box 盘根bearing for the sheave for stuffingbox 轴承O-ring for lubricator 防喷管O环ram assembly for BOP 防喷管闸板总成O-ring for BOP BOP O环O-ring for wellhead adapter 井口变扣O环pin 销钉counter head 计数头cable for counter 计数器软轴bearing of hay pulley 地滑轮轴承Part two Pressure gaugeaccordance 一致,和谐accuracy 精确性,正确度acquisition 获得,获得物alignment 校直,调准append 附加,添加,悬挂apply 申请,应用available 可利用的,有用的battery 电池battery housing 电池筒battery tester 电池测量器baud rate 波特率bull nose 底堵cable 电缆,电线cable head 电缆头,电缆接头calculation 计算,考虑calibration 标度,刻度,校准calibration drift 漂移calibration parameter 标定参数cartesian 笛卡儿曲线certification 证书com port 串行通讯端口command 命令,掌握,支配communicate 沟通,交流,通讯compensate 偿还,补偿configuration 构造,结构,配置,外形configure 配置,设定consist 组成,构成control panel 控制面板convert 转换,使转变cross-over between gauge 压力计间变扣crystal 水晶,晶体current 电流damage 危险,损害data acquisition 获得数据decode 解码,译解delta time 累计时间deviate 偏离diagnostic 诊断diameter 直径digital 数字的directory 目录discussion 讨论display 显示器,显示,展示downhole tools 井下工具drain 消耗,耗尽dump data 回放数据durability 耐用性element 元素,元件,成分elevated temperature 高温encoder 译码器,编码器establish 建立,安置filter 过滤,筛选firmware 固件(软件硬件相结合)fixed rate 固定采样率flash 闪光,闪现frequency 频率,周率gauge 压力计graph 图表,曲线图grease for transducer 传感器用油housing 壳,壳体incorporate 合并,混合indicate 指出,显示individual 个别的,单独的install 安装,安置instrument 工具,器械,器具interface box 接口箱interface box 接口箱internal diagnostics 内部诊断lapse 失误,下降,过失linear plot 线性平面图log 日志maintenance 维护,保持manual 手册,指南manufacture 制造,加工merge 合并,并入,结合memory 存储器,内存module 模块observe 观察,观测offer 提供,企图parallel communication 并行通信period 周期,时期plug 堵,塞,插上,插栓port 端口,港口potential 潜在的,可能的presentation 陈述,表达presentation software 操作软件printer 打印机prior 优先的,在前的procedure 步骤,手续program 程序,节目prune 剪除,修剪,删除quality 质量,品质,性质quartz 石英range 范围,射程real time 实际时间record mode 记录模式reduce 减小,缩小,简化remote control 遥控,遥控操作remove 移动,开除,移交require 请求,要求resolution 分辨率response 回答,响应scale 刻度,天平,比例尺select 选择,挑选setup 机构,安装,装备,组织silicone oil 硅油sleep mode 休眠模式spanner for gauge 压力计专用扳手SRO(surface read-out) 地面直读surpass 超过,胜过talk mode 对话模式terminal 终点终端thread grease 丝扣油transducer 传感器,变频器,交换器transient 短暂的,瞬时的transmit 传输,传送,发射信号transport 传送器,运输机transportation box 压力计箱troubleshooting 发现并修理故障truncate 截取,修剪update 更新,校正,修正upload 上载variable rate 可变采样率various 不同的,多样的version 版本,译本volt 伏特voltage 电压wand 棒,棍,杖zoom 放大,缩放Part three PVT取样 air chamber plug extractor 空气室拉出手柄air chamber plug retaining ringextractor 梭管套旋出手柄air chamber tube assy 导流管air hose assy. 扫空管allen key 内六角autoclave vacuum nipple 抽真空头B/bench hose assy. 样瓶转样管back-up ring 背环compression spring 压缩弹簧filler funnel 漏斗flow regulator body 节流器flow regulator end cap 端帽flow regulator extractor 节流器拉出手柄fuse/110V 保险丝/110Vglycol 甘醇heating jacket for cylinder 样瓶加温器heating jacket for sampler 取样器加温器holder 装配手柄internal circlip 内簧卡internal circlip for cylinder 取样瓶卡环lock grubscrew 锁紧螺丝needle valve 针阀needle valve assy.extractor 针阀手柄needle valve body 针阀组件needle valve BUR former 针阀背环工具off ball 钢球off diskspring 弹簧片piston assy. 活塞总成piston removal 活塞移位工具piston ring 活塞环piston rod 活塞杆piston valve stem 梭阀杆pols-lock pin 锁定销钉pols-lock spring 锁定销钉弹簧posi lock pin depressing tool 锁定按压工具prime hand pump 注油器prime hand pump adaptor 注油器适配器prime port adaptor assy. 加压口适配器prime port nipple plug 加压口堵头prime port spanner 加压阀扳手prime pump assy. 手压泵适配器prime pump hose assy. 手压泵输出管push rod 推杆relief valve stem 调压阀杆retaining ring 制动环reversible circlip pliers 卡簧手钳safety solvent 清洗液sample analysis 试样分析,样品分析sample analyzer 试样分析器sample bailer 采样筒sample blob 井底取样器sample bomb 高压取样瓶,样品存储器sample bottle 取样瓶,采样瓶sample bottle valve adaptor 样瓶接头sample chamber 样品室sample cock 取样旋塞,取样拷克sample collection 取样,样品收集sample collection procedure 取样点,采样点sample collector 取样程序sample connection 试样收集器,采样员sample container 取样接头sample contamination 样瓶,样筒,样品容器sample cup 样品污染sample cylinder 样品杯sample cylinder tag 样瓶,样筒sample date 样瓶标签sample depth 取样日期sample frequency 采样深度sample hose 采样信号sample identification 取样井,采样井sample integrity 采样频率sample interval 样品管,采样胶皮管sample period 样品鉴定sample point 样品的真实性sample signal 取样间隔,取样速度sample well 取样周期sampler hose assy. 取样器软管总成setting screw 制动螺丝setting fork 导流叉管setting tool 空气定位销手柄setting tool 梭杆推进套shuttle mechanism assy. 触发机构tee ring seals T型密封环test gauge 压力表tool body clamp 取样器夹具tool dressing aids 更换'O'环工具torque wrench 扭矩扳手torque wrench adaptor 扭矩扳手接头torque wrench adaptor 扭矩扳手接头transfer bench assy. 转样器总成transfer lock sleeve 转样护帽transfer port adaptor 转样适配器transfer port plug 转样口堵头trigger mech. assy. 触发机构总成trigger spring 触发弹簧vacuum hand pump 真空泵vibra gauge 压力表Part four OthersAa directional engineer 定向井工程师a drilling engineer 钻井工程师a drilling supervisor 钻井监督a senior mud engineer 高级泥浆工程师a toolpusher 队长,技师abandoned drill 弃船演习accelevator 促凝剂acidity 酸性adapter 接头additive 添加剂/处理剂ahead water 先行水air chamber 空气包air hoist 气动绞车alarm 警报alkalinity 碱性泥浆比重amplitude log 声幅测井anchor 锚angle 角钢annular return velocity 泥浆返回流速annular space 环形空间annular velocity 环空流速apparent viscosity 视黏度asbestos 石棉assistant tug boat 护航船assistant driller 副钻aviation fuel 航空油Bback off 倒扣back pressure 回压back pressure valve 回压阀ball 球ball up 泥包barge engineer 平台工程师barite 重晶石bearing 轴承bearing angle 方位bed 床behind water 尾水bit 钻头bit bearing 钻头轴承bit breaker 钻头装卸器bit cost 钻头成本bit diameter 钻头直径bit gauge 钻头规bit life 钻头寿命bit nozzle 钻头水眼bit position 钻头位置bit sub 钻头接头bit time 钻头纯钻时间bit tooth 钻头牙齿bit torque 钻头扭矩bit type 钻头型号bit wear 钻头磨损blasting cap 雷管blow out 井喷blow out preventer 防喷器boiler 锅炉bolt 螺栓bolt,nut 螺丝,螺母bore hole 裸眼bore hole well 井壁boring 钻孔bottom hole 井底bottom fill 沉砂bottom hole pressure 井底压力bottom hole pressure 井底压力bottoms up 携带岩屑box 母扣brake 刹车break out 卸扣breech lock 泡栓build up 压力恢复bulk density 堆积密度;松装密度bulk tank 灰罐bumper sub 缓冲器buoyancy coefficient 浮力系数bushing 补芯butane 丁烷Ccable 电缆calcium remover 除钙剂calculating free piont 计算卡点深度calibration 刻度casing 套管,螺纹联接的兀接箍casing head 套管头casing spool 套管四通casing burst pressure 套管破裂压力casing elevator 套管吊卡casing monkey board 套管平台casing pressure 套压casing program 套管程序casing scraper 套管刮管器casing shoe 套管鞋casing sub 套管接头casing tong 套管大钳cathead 猫头cave in 坍塌cement 水泥cement basket 水泥伞cement bond log 固井质量检验cement flush 水泥冲洗cement slurry 水泥浆cement slurry for lead 先行水泥浆cementing 固井cementing line 固井管线cementing pump 固井泵center latch elevator 中开门吊卡centralizer 套管扶正器centrifugal pump 离心泵chain block 倒链change bit 换钻头chart 卡片check valve 单流阀chemical tank 化学药剂缸chemical treatment 化学处理chemicals 化学剂choke 油嘴choke line 阻流管汇choke manifold 试油树christmas tree 采油树circulating pressure 循环压力circulation 循环circulation rate 循环速度clamp 卡子clay contamination 粘土侵clock 时钟clog house 值班房cock 水龙头coefficient of friction 摩擦系数colloid 胶体completion 完井computer 计算机conductor 隔水导管cone 牙轮cone bit 牙轮钻头connector 联结器contamination of mud 泥浆污染contract 合同contractor 承包商control room 控制室conventional mud 普通泥浆cooker 炊事员core 岩心core barrel 取芯筒core bit 取芯钻头core catcher 岩心爪core gun 取芯器core handling tools 取芯工具core recovery 取芯收获率coring 取芯coupling 联接扣cover 外壳crane operator 吊车司机critical velocity 临界速度cross 十字接头cross over,x-over(XO) 大小头,短节,变扣接头,旁通管crossover sub 配合接头crown block 天车cut off workline 割大绳cylinder 缸Ddaily production 日产量deadline 死绳deadline anchor 死绳固定器deck 甲板declination 偏差/方位角degas ser 除气器dehydration 失水densimeter 密度计depth 井深derrick 井架derrick man 架工desander 除砂器desilter 沉淀池, 滤水池detonator 炸药deviation survey 井斜测量diamond bit 金刚石钻头die collar 打捞卡瓦diesel oil 柴油different pressure sticking 压差卡钻directional well 定向井discharge of pump 泵排量dispersing agent 分散剂displace 替diver 潜水员doctor 医生drag 遇阻draw works 绞车drier(dring oven) 干燥计drift angle 倾角drift mandrel 通径规drifting 通径drill pipe 钻杆drill spool 钻井四通drill stem 钻柱drill strings 钻杆拄drill water 钻井水drill collar 钻铤drill floor 钻台drill floor 钻台driller 司钻drilling 钻进drilling technician 钻井技术员drilling assembly 钻具组合drilling break 进尺突然加快drilling cost 钻井成本drilling crew 钻井队员drilling engineer 钻井工程师drilling equipment 钻井装置,钻机drilling line 大绳drilling log 钻井记录drilling ration 钻速drilling recorder 钻井记录仪drilling rig 钻井船drilling troubles 井下事故drum shaft 滚筒轴DST(drill stem test) 延长DST测试dump valve 放泄阀duplex slush pump 双缸泥浆泵DV collar 分级注水泥短接DV port DV孔Eelbow 弯接头electric logging 电测electric submerged pump(ESP) 电潜泵electrician 电工elevator 吊卡elevator link 吊环emulsifier 乳化剂engine room 机舱erecting equipment 安装设备erecting tools 安装工具erode out 刺坏error 误差ethane 乙烷exploration 勘探extended well testing 延长测试external upset 外加厚Ffalse threading 造扣field maintenance 现场维护,现场保养fill line 灌泥浆管线filling up mud 灌泥浆filter cake 泥饼filter paper 滤纸filtration educing agent 降失水剂finger board 指梁fire drill 消防演习fishing 打捞fishing bumper sub 打捞缓冲器fishing jars 打捞震击器fishing job 打捞作业fishing neck 打捞颈fishing tools 打捞工具fishing up 打捞出落鱼flash welded tool joint 闪光焊接接头flashlight 手电float collar 浮箍float shoe 浮鞋floor man 钻工flow 放喷flow line 泥浆出口管线flow rate 流量flow line 出油管flow rate 流速flowing bean(nipple) 油嘴flowing pressure gradient 流压梯度fluid loss 失水量fluorescence 荧光反应formation 地层formation conductivities 地层电导率formation damage 破坏地层fracturing 压裂free pipe 未卡部分钻柱free point 自由点free standing mast 无绷绳轻便井架fresh water 淡水full hole(FH) 贯眼扣function 函数funnel viscometer 漏斗黏度计Ggamma ray 射线gamma ray log 自然测井gas reservoir 气层gas analysis 气体分析gas chromatography 气体色谱仪gas cut 气侵gas in mud 泥浆中气量gas oil ratio 油气比gas out 气侵gas showing 气体显示gasoline 汽油gauge 量规gear 牙轮gel 凝胶gel cement 胶质水泥gel mud 胶质泥浆gel strength 切力generator 发动机geothermal gradient 地温梯度goose neck 鹅颈管grade 级/等级grease 黄油guide shoe 引鞋gun perforation 射孔完井gypsum mud 石膏泥浆Hhammer 锤子hard ware 硬件heavy mud 重泥浆/加重泥浆heavy viscosity mud 高粘泥浆heavy weight drill pipe 加重钻杆heavy bodied 很稠的,粘滞的helicopter 直升飞机helicopter port 飞机平台helmet 安全帽hole opener 扩眼器hole size 井眼尺寸hole straightening 井眼校正/纠斜hook 大钩hook load 大钩负荷hook load off bottom 钻柱离底时大钩负荷hook position 大钩位置hopper 漏斗hose 软管/水龙带hull 船身hydraulic pressure 静水压力hydraulic oil 液压油hydrostatic pressure 静水压力IIF(internal flush) 内平扣indented bolt 齿纹螺栓indented chisel 齿状钻头,牙轮钻头indirect flushing 反循环洗井,反向冲洗induction electrical survey 感应电测井inertia brake 惯性刹车initial gel strength 出切inner barrel 内岩心筒inner string cementing 内管注水泥input 输入insert bit 镶齿钻头inside bop drill 安装回压凡尔演习intake profile 吸水剖面internal upset 内加厚internal-external upset 内外加厚interpreter 翻译invaded zone 侵入带invasion diameter 侵入直径inverse circulation 反洗井inverse well-flushing 反洗井isobutane 异丁烷isopentane 异戊烷Jjack knife mast 折叠式轻便井架jack up type drilling unit 自升式钻井船jars 震击器joint 单根junk basket 打捞蓝Kkelly 方钻杆kelly bushing 方钻杆补芯kelly cock 方钻杆考可kelly down 方入kelly down depth 方入深度kelly drive 方钻杆滚子补芯kelly spinner 方钻杆旋扣器kelly up 方余key seat 键槽key seating sticking 键槽卡钻kick 井涌kick control 控制井涌kill line 压井管汇killing a well 压井Llaminar flow 层流latching elevator 扣吊卡lay down 甩lay time 迟到时间leak 漏life raft 救生筏lifeboat 救生艇lift jacket 救生衣lifting sub 提升短接light weight mud 轻泥浆lignite 铁络盐lignite mud 铁络盐泥浆lime 石灰lime mud 石灰泥浆limit switch 相限开关line 管线line cleaning 管线清洗line test 管线试压liner 缸套,尾管liner hanger 尾管挂living quarters 居住区loading 装船logging cable 测井电缆logging program 测井程序logging tool 测井工具loosen 放松lost circulation 井漏lost circulation materials 堵漏剂lubricating oil 润滑油lubricator(assembly,system) 防喷管(装置,系统)Mmachine oil 机油main tug boat 主拖轮make up 上扣make up torque 上扣扭矩mast 钻机master bushing 转盘大补芯master valve 总闸门material man 材料员mean sea level 平均海平面mechanic 机械工mechanist 机械师methane 甲烷mica 云母milled teeth bit 铣齿钻头milling tool 铣具/磨鞋miring water 溶解水mixing pump 混合泵monkey board 二层台morning tour 白班motormen 机工mouse hole 鼠洞mud 泥浆mud agitator 泥浆搅拌器mud balance 泥浆密度计mud column 泥浆柱mud conditioning 泥浆处理/配泥浆mud conductivity 泥浆导电率mud density 泥浆密度mud ditch 泥浆槽mud flow meter 泥浆流量计mud gun 泥浆枪mud line 泥浆管线mud logging 泥浆录井mud pump 泥浆泵mud resistivity 泥浆电阻率mud retort 泥浆蒸馏水mud return line 泥浆返出管线mud tank 泥浆池mud temperature 泥浆温度mud testing 泥浆测试mud volume 泥浆量mud weight indicator 泥浆比重计mud tank 泥浆罐multiple completion 多层完井MW(mud weight) 泥浆重量,泥浆密度Nnail 钉子natural flow 自喷NDBOPS(nipple down blowout preventers) 卸下防喷器组NDT(nipple down tree) 拆卸井口装置,拆卸采油树near bit stabilizer 金钻头扶正器neutron 中子射线nipple down 卸下,拆卸nipple seating 座落接头no return 未返回水泥浆normal circulation 正循环normal butane 正丁烷normal pentane 正戊烷nozzle size 水眼尺寸nut 螺母Ooff bottom 不接触井底office 办公室oil base mud 油基泥浆oil reservoir 油层on bottom 接触井底open 打开open hole 裸眼opening 扩眼o-ring O环outer barrel 外岩心筒oven 烘箱over pulling 遇卡overshot 打捞筒Ppacker 封隔器packing 密封圈paint 油漆panel 面板paraffin plugging 蜡堵paraffin valve 清蜡闸门paraffin-treatment 清蜡处理paraffin-troubles 结蜡井parts 零件pentane 戊烷PH control additive PH控制剂phenolphthalein 酚酞pile hammer 打桩机pin 销子,公扣pincers 钳子pipe wrench 管子扳手piston 活塞piston rod 活塞杆pit drill 防喷演习pit level 泥浆液面pit level 泥浆池液面pit volume increase 泥浆增加量plastic viscosity 塑性黏度plug 水泥塞plug container 水泥头plug flow 塞流plugging back cementing 回堵注水泥pollution 污染polymer 聚合物portland cement 硅酸盐水泥potassium chlorate 氯化钾power slip 动力卡瓦power source 电源power swivel 动力水龙头power tong 动力大钳power law model 幂律模型pressure decline 压力降pressure equilibrium 压力平衡pressure gage 压力表pressure gradient 压力梯度pressure gradient 压力梯度pressure loss 压力损失pressure loss in pipe 管内压力损失pressure of mud column 泥浆柱压力pressure loss in annular 环空压力损失pressurized air 压缩空气preventer of double ram type 双闸板式防喷器production 生产propane 丙烷pry bar 撬杠,杠杆pull out of the hole 起钻pulley 滑轮pulley 滑轮pulling slip 起卡瓦pumice 浮石pump count 累计泵冲数pump efficiency 泵效pump pressure 泵压pump speed 泵速pump stroke counter 泥浆泵冲数pup joint 短接put into gear 挂挡put on break 刹车,制动PWV(production wing valve) 生产翼阀Qquick coupling 快速接头,快接管箍Rradio operator 电报员radioactivity log 放射性测井rag line 大棕绳rain density 颗粒密度rat hole 鼠洞rate of penetration 转速reamer 释放,丢手reaming 辊轴扶正器recorder 划眼red lead 记录仪reducer 丝扣油,铅油,管件润滑油regular 大小头release 正规扣relief valve 泄压阀,泄流阀reserve pit 储存池reservoir pressure 油层压力retarder 缓凝剂return 返回水泥浆return mud 反出泥浆returning fluid 井口反出液reverse circulation 反循环reverse circulation 反循环revolution 运转revolution 转数revolutions per minute 每分钟转数Reynolds number 雷诺数rig down 拆卸钻机rig up 安装钻机rig in 安装,连接rig out 拆卸ring gasket 钢圈/垫圈riser 隔水导管rope damp 绳头,绳卡rotary hose 泥浆水龙带rotary slip 转盘卡瓦rotary speed 转盘转数rotary table 转盘rotation bases 倒班roughneck 钻工roustabout 水手run casing 下套管run in the hole 下钻run length 进尺run bridge plug 下桥塞run gauge cutter 通井running tool 下入工具running in test 试车running repair 日常修理,现场维修RWTO(returned well to production) 井恢复生产Ssafety belt 安全带safety clamp 安全卡子safety joint 安全接头safety valve 安全阀sampling depth 取样井深sampling interval 取样间隔sand bridge 砂桥sand trouble 砂堵sandline 捞砂绳saturated salt-water mud 饱和盐水泥浆screw 螺钉seal 密封/封堵seating nipple 座落接头sea-water mud 海水泥浆sensor 传感器separater 分离器set back 立根盒setting slip 放卡瓦shaft 轴shale shaker 振动筛shallow gas 试气层shear rate 剪切速度shear pin 剪切销钉sheave 滑轮shock sub 减振器shoe guide 引鞋short trip 短起下钻shut in 关井shut in casing pressure 关井套管压力shut in drill pipe pressure 关井钻杆压力shut in pressure 关井压力shut off 关闭side wall neutron log 井壁中子测井silicon flour 硅粉silicon-controlled rectifier 可控硅整流器single joint elevator 单根吊卡single ram 单闸板slip 卡瓦slip type elevator 卡瓦式吊卡slip velocity 沉积速度slip workline 倒大绳slow pump 低泵速sludge tank 加重泥浆池slush pump 泥浆泵socket 插座solid content 固体含量sonic log 声波测井sonic wave 声波spacer 隔离液spare parts 备件spider 卡盘spontaneous potential log 自然电位测井spool 四通spring 弹簧spud in 开钻squeeze cementing 挤水泥stabilizer 扶正器stabilizing agent 稳定剂stage cementing 分级注水泥stainless steel 不锈钢stand 立柱stand pipe 立管stand the test 试验合格,经受考验standby 待机stand-by boat 值班船starting outfit 启动设备static pressure 静压steam 蒸气sticking 卡钻/被卡stinger 导向插头,引鞋,尾管stinger sub 插入式短节stop lost circulation 堵漏storm 风暴straight well 直井眼sub 接头,短接submerged pump 潜水泵substructure 井架底座sucking line 上水管线suction tank 吸入池supercharge pump 泥浆灌注泵supervisor 监督supply boat 供应船support 支架surge pressure 冲击压力suspending weight 悬重swab pressure 抽吸压力swabbing 抽吸switch 开关TT/B/G 牙齿/轴承/外径磨损table torque meter 转盘扭矩表table height 转盘高度taper milling 锥形刮刀technician 技术人员,技师tee 三通temperature log 温度测井ten minutes gel 终切test paper 试纸thread 丝扣tie back tool 回接工具tighten 上紧TOF(top of fishing) 落鱼顶部tong 大钳tong torque meter 大钳扭矩表ton-mile 吨-英里TOOH(tool out of hole) 起出下入井中的工具tool joint 钻杆接头tool pusher 钻井技师top valve 采油树清蜡闸门,试井闸门torch burner 喷灯torque 扭矩total depth 总井深total gas 气全量total pit 泥浆池总体积tour Shift 班towing 拖航transmission 传动装置/变速器traveling block 游动滑车tri-cone bit 三牙轮钻头trip 起下钻trip tank 计量罐tripping time 起下钻时间tubing 油管tubing hanger 油管挂tubing spool 油管四通tubing head 油管头tubing pressure 油压turbo drill 涡轮钻具turbulent flow 紊流twist off 脱扣typhoon 台风Uunconnect switch 非接触式开关unfreezing 解卡unlatching elevator 开吊卡unloading 卸栽upset 加厚Vvalve master 主阀variable density log 变密度测井V-door 井架大门vent pipe 放空管ventilate 放空,吹扫ventilation 通风,通风设备vertical depth 垂直深度viscosity 黏度volume inside pipe 管内容量volume of annulus 环空容量WW.O.O(wait on orders) 等待指令wait on 等指令wait on cement 候凝wait on(stand by) 待命walkie-talkie 对讲机wall scraper 井壁刮刀WAP(well performance analysis) 井的动态分析warning board 警告牌wash over 洗井,套洗,冲刷wash tank 洗罐,分离罐washer 洗衣机wash-over fishing operation 套洗打捞作业,套洗落鱼作业water flood pump(injection) 注水泵water flush 水循环洗井water injector(injection well) 注水井water lost(WL) 泥浆失水wax containing crude 含蜡原油waxy 蜡,蜡状物,含蜡的WDBS(weight going down before sticking) 仪器遇阻前下行重量weather 气候WEG(wireline entryguide) 喇叭口weight in air 空气中重量weight in mud 泥浆中重量weight indicator 指重表weight material 加重剂weight on bit 钻压weighted mud 重泥浆/加重泥浆welder 电焊工well 井well cleaning 洗井well head 井口well head assembly 井口装置well head pressure 井口压力well shooting 地震测井well bean 井口油嘴well blowout 井喷well bore clean up 洗井,well cementation 固井,挤水泥well cementing operation 固井作业well completing data 完井资料,数据well completing fluid 完井液well completinginformation 完井资料, wellcompleting test 完井测试well completion 完井well condition 井况well control device 井控装置well control equipment 井控设备well control fluid 压井液well control information 井控资料well control manifold 井口控制管汇well control operation 压井作业well deflection 井斜well flow under balance 诱喷well killing 压井well killing job 压井作业well killing method 压井方法well performance testing 系统试井,井动态测试,井生产测试well pulling job 起油管作业well pulling service 修井起下作业well sampling 井下取样well sand up 油井砂堵well screen 油井筛管well service tank 修井液罐well service hoist 修井机well service work 修井作业well site illumination 井场照明well testing supervisor 试油,测试监督well-completion practice 完井作业wellhead cap 井口帽wellhead choke 井口油嘴wellhead control valve 井口总阀门wellhead tap 井口短节wetting agent 润滑剂WHP(wellhead platform) 井口平台wiper trip 通井wire 钢丝wire line(WL) 电缆work accident 操作事故work assignment 工作安排work string reciprocation 工。

钻井(石油专业英语)

钻井(石油专业英语)

一、U153 (F9)二、泥浆1mud microanalysis gain in activs活动池泥浆微量增加43shakers dumping mud to sea从振动筛放泥浆到海2mud microanalysis declin activs活动池泥浆微量减少44dumping mud to sea放泥浆下海3DRILLING / drill ahead钻进 / 钻新地层45adding barite in activs加重晶石到活动池4Trnsf mud f/pit2 to activs从2#池传泥浆到活动池46increase MW.增加比重(加重泥浆)5Pull out of hole起钻47mud loss over shakers振动筛跑泥浆6continue Run in hole继续下钻48pump plug back mud 泵堵漏泥浆7Short trip out / in短起钻 / 短下钻49dumping sand trap mud放空沉砂池泥浆8Sliding滑动钻进50mix mud into pit#xx配泥浆在xx号泥浆池9Deviation survey / Retrieve survey tool测斜 / 收回测斜工具51add mud material to pit#xx加泥浆材料到泥浆池10mud losses over shakers泥浆损失在振动筛52add lubricant to activs加润滑剂到活动池11cement job固井作业53add loss circulation material 加堵漏材料12electric logs电测井54add sea water to pit#xx加海水到泥浆池13wait on cement 候疑55add sea water to pit#xx slowly慢加海水到泥浆池14geological circulation地质循环56add defoamer加除泡剂15start coring (core)开始取芯57weighting mud加重泥浆16drop carbide @ pipe 投电石在钻杆内58mud gain in activs活动池泥浆增加17carbide gas up电石气返出59mud decline activs活动池泥浆减少18mud losses / mud gain泥浆损失 / 泥浆增加60mud decrement activs活动池泥浆减量19kick井涌61hight viscosity mud高粘度泥浆20filling trip tank填充计量罐62low viscosity mud低粘度泥浆21empty trip tank排空计量罐63replace mud to hole替泥浆至井眼22start degasser / stop degasser开脱气器 / 关脱气器64displace slug mud to hole替重泥浆至井眼23start mixing / stop mixing开始配泥浆 / 停止配泥浆65conditioning mud调整泥浆24replace mud to hole 替泥浆到井眼66back circ.反循环25displace slug mud to hole替重泥浆到井眼67start /stop desander and desilter开除砂器和除泥器26slow pump rate test低泵速试验68heary mud重泥浆27continue runing in BOP & Riser 继续下防喷器和隔水管69light-weigh mud轻泥浆28make up B.H.A.组合 BHA70thick mud稠泥浆29finishing job完井作业71thin mud稀泥浆30conditionning mud调整泥浆72No returns inf.driller & sup.泥浆有进无出通知司钻和监督31run in wear bushing下抗磨补芯73blind drilling泥浆有进无出钻进32L / D run tool & cmt head74change gas line换气管线33Run in casing / filling casing下套管 / 填充套管75carbide投电石检查34continue start desander and desilter继续开除砂器和除泥器76conn gas单根气35add mud material (lubricant) to activs加泥浆材料到活动池(润滑剂)77inject gas analyse注气样分析36cut / slip drilling line切割 / 滑移钻井大绳78blow gas line通气管线37continue activs weighting mud活动池继续加重泥浆79sampie introduction进样38SPP decrease inf. driller & sup.泵压减少通知司钻和监督80aftereffect后效39SPP increase inf. driller & sup.泵压增加通知司钻和监督81calibration FCP.刻度、调校色谱仪40mud decrease inf. driller & sup.泥浆减少通知司钻和监督82start / stop degasser开 / 停脱气器41mud gain inform driller & superuisor泥浆增加通知司钻和监督83end drilling 结束钻进1-91-10。

海洋石油钻井常用英语手册之欧阳家百创编

海洋石油钻井常用英语手册之欧阳家百创编

A Handbook of English forOffshore Oil Drilling欧阳家百(2021.03.07)海洋石油钻井常用英语手册Drilling 钻井Carry out drilling operation in accordance with the drilling program.按钻井程序进行钻井作业.Prepared bell nipple. 准备”喇叭口”短节.Make up 2 joints of drill pipe. 接两根钻杆.Break out this connection. 卸开该接头.Run hole opener to sea bed. 下扩眼器到海底Mix gel fluid for drilling conductor hole. 为钻导管井眼配制高粘度泥浆.Make up bottom hole assembly. 组合下部钻具Check and reset crown-saver on every tour. 每个班都要检查并重新调整天车防碰装置.Number stands on trip out and trip in. 起下钻时给立柱编号.Pick up BHA and run to seafloor. 将下部钻具下到海底.Pick up stands. 接立柱Don’t drill faster than 15 minutes for 1 stand. 钻进速度别超过15分钟1根立柱Drop TOTCO. 投(陶特)测斜仪Fish TOTCO with overshot. 用打捞筒捞起测斜仪Resume drilling to T.D. 继续钻进到总深Circulate 15 minutes.循环15分钟Run in hole. 下钻Put out of hole. 起钻Make an inventory of all ring gaskets. 开一个所有垫圈的清单Use spinning tong. 使用气动扳手Operate the air winch. 操作气动绞车Lay down 57 joints of 5” drill pipe. 甩57根钻杆Pick up drill stem test tool. 提起钻杆测试工具Circulate mud for 2 hours. 循环泥浆2小时Move string during circulation. 在循环时注意活动钻具Circulate hole clean. 循环清洗井眼Circulate bottoms up. 循环泥浆几周Fill up every 5 stands. 每5柱灌泥浆一次Check mud weight every 15 minutes. 每15分钟检查泥浆比重Reverse out excess cement. 反循环替出多余的泥浆Change/replace old mud by new mud. 用新的泥浆替换出旧的泥浆Stop drilling. 停止钻进Drilling ahead. 钻进Pull out of hole bit. 起出钻头Change bit. 换钻头Run the wear bushing. 下抗磨补心The bit thread type is regular pin. 钻头丝扣是正规公扣What’s the make-up torque? 上扣扭矩要多大?Run in 9” collars. 下9”钻铤The cathead can’t give enough torque. 猫头力量不够Connect crossover sub. 接上配合接头The tong angle is too small. 大钳的角度太小了Stop circulating. 停止循环泥浆Break out the stand. 卸立柱Set the single into the mousehole. 把这个单根放进鼠洞Can we break out the pipe with rotary table? 可用转盘卸扣吗?No! Break it out with tong. 不行! 要用大钳卸扣Spin it out with the air spanner. 用气动扳手卸扣Put the pipe wiper on the string. 装上钻杆刮泥器Don’t set this stand back. 这根钻杆不要放在钻杆盒上Make up the lift sub. 接好提升短节Secure the safety clamp. 上紧安全卡瓦The bit is nearing the shoe. 钻头快到套管鞋了Slow down the running speed. 放慢下放速度This is the undergauged interval. 这是缩径井段This is the drilling program. 这是钻井设计书How much weight on bit is required? 要加多少钻压?Keep the rotary speed at 120---140 RPM. 转速保持120---140转/分Keep the flow rate at 3000 LPM. 保持排量3000升/分The pump pressure is too high. 泵压太高了Don’t ream the hole too fast. 划眼不要太快Notice the rotary torque. 注意转盘扭矩的变化The penetration rate is getting slower. 钻速变慢了The bit is nearly worn out. 钻头快磨光了Stop drilling at 2000 meters. 钻至2000米停钻Circulate for one hour. 循环一个小时The pump pressure has increased. 泵压升高了One nozzle may be plugged. 可能有一个水眼(或: 喷嘴)堵了What is the hook load? 悬重多少?What’s the pick-up weight? 上提重量是多少?What’s the lowering weight? 下放重量是多少?Run in HWDP. 下加重钻杆A stabilizer is needed here. 这里需要一个扶正器This is a flexible sub. 这是挠性接头This is the BHA log. 这是下部钻具组合记录Record all outside and inside diameters. 记录好所有(入井工具的)内外径We need a short drill collar. 需要一根短钻铤Pull the cat line. 拉猫头Operate the break lever. 操作(或:扶)刹把Stop the pumps. 停泵Make a wiper trip. 通井Retrieve wear bushing. 取出抗磨补心Bleed off pressure. (释)放压(力)Keep 5 wraps on the drum. 滚筒上留5圈Set slips. 座上卡瓦If tight hole, repeat wiper trip. 如果井眼紧, 重复划眼Setback bottom hole assembly. 将下部钻具立于钻杆盒内Make sure all alarms are on. 确保所有的警报信号都开着Lay down TDS spinner. 拆下顶部驱动的旋扣器Run in hole bit #15 to bottom. 用15号钻头下钻到井底Run in hole to casing shoe. 下钻至套管鞋Pick up same bit and BHA. 装上同样的钻头和钻具组合Lay down 5” HW drill pipe. 甩5”加重钻杆Move string every 2 hours. 每2小时活动钻具一次Keep area around shaker clean. 保持振动筛区域干净Control trip gas. 控制起下钻气Ream if needed. 如必要时进行划眼Select the best penetration rate. 选择最佳钻进速度Fix the traveling assembly. 固定游动系统Check power tongs and spinning rope are on drill floor. 检查动力钳和尾绳是否在钻台What’s the weight on bit? 钻压是多少?What is the BHA of this well? 这口井的下部钻具如何组合?Drill out cement. 钻穿水泥Drill out 20” casing shoe. 钻穿20”套管鞋Latch the elevator. 扣吊卡Unlatch the elevator. 开吊卡Set the slips. 放卡瓦Adjust the crown-o-matic (crown saver). 调整防碰天车Lock the hook pin. 锁紧大钩销子Check OD of stabilizer. 检查扶正器的外径Perform leak off test. 进行地层破裂(或:渗漏)测试Connect kill and choke line. 接上压井和放喷管线Reverse out the drill pipe. 反循环清洗钻杆Make a short trip. 进行短途起下钻Change the cutters. 换割刀Slug the pipe. 灌重泥浆Drill the stand down. 钻完立柱Start/run the shale shaker. 开振动筛Start the desanders. 开除砂器Start the desilters. 开除泥器Change it with a 40 mesh screen. 换成40目筛布Shut it off. 关掉Pull it to the cat ramp. 把它拉到坡道上去Make a fast connection. 接单根要快Don’t dum p the mud into the sea. 不要把泥浆排放到海里Disconnect it with a chain tong. 用链钳卸开Put a thread protector. 加一个(丝扣)护箍Can we use the power slips? 可以使用动力卡瓦吗?Casing and Cementing 下套管与固井Run in hole to bottom for wiper trip. 下钻通井This is the casing program. 这是套管程序Prepare for running casing. 准备下套管Make everything ready for running 7”casing. 做好下7”套管的准备Make cementing job. 固井Displace cementing with mud pump. 用泥浆泵替泥浆Set cement plug from 2940 to 2790m. 在2940到2790米井段打水泥塞Pick up cementing head. 接水泥头Cement samples are hard. 水泥样已凝固Pump in 3 cubic meters of spacer. 注3方隔离液Pump down the plug. 泵压(胶)塞Wait on cement. 候凝The guide shoe will be connected. 接引鞋Connect the floor collar. 接浮箍Connect the air line to the casing stabbing board. 接好套管扶正台的气管线Run casing with the 350T slip elevator. 用350吨卡瓦式吊卡下套管Clean and dry 20” casing threads with rags. 清洁并擦干20”套管丝扣Where is the rabbit for drifting the casing? 套管通径规在哪里?Rig Move, Anchoring and Positioning 拖航, 抛锚, 定位What is our position now? 我们现在船位在哪里?What’s the moving speed now? (What’s the towering speed?) 拖航速度是多少?The speed is about 4 knots. 船速是4节左右Which one is the main tug? 主拖是哪条船?The main tug is Nanhai 205. 主拖是南海205Which one is the chase boat? 护航船是哪一条?How much is the horse power? 有多大马力?She has 6000 HP. 有6000马力Move the rig off location 50 feet. 将平台移开50英尺We are ready to drop the anchor. 我们已经做好抛锚的准备了Secure all the movable equipment. 固定好各种活动的设备Preload. (自升式)压载Ballast. (半潜式)压载Put the preload water into the tank. 向压载舱灌压压载水We need 5500 tons of preload water. 需要5500吨压载水Shall we preload right now? 马上开始压载吗?Drain the water off. 放水The rig is overloaded. 平台已超载Jack up (jack down) the rig. 升(降)船The draft is 3.5 meters. 船体吃水3.5米The jetting pressure is 100psi. 冲桩压力是100psiPenetrate the legs. 插桩How much penetration do we have? 入泥多深了?No.1 and No.2 legs indicate 10 meters. 1,2号桩腿插入10米Fix the upper and lower wedges. 固定上下楔块Pay out the anchor line. 放出锚缆绳Skid the derrick. 移开井架The rig is short of potable water now. 平台缺乏饮用水Drop No.2 and No.3 anchors. 抛2号和3号锚Why has the main engine stopped? 主机为什么停?Unleash the drilling tools. 卸开钻具Tighten up. 绷紧(或:上紧)一点Turn on the cooling water for the windlasses. 开锚机刹车冷却水Retrieve the No.1 to No.8 anchors. 起1到8号锚Check the paint marks at the anchor winches. 检查锚机上的油漆记号Prepare for a location move. 准备好移井位Commence anchor handling. 开始起锚(或抛锚)Secure all equipment stored on deck. 固定好所有存放在甲板上的设备Carry out stability and load calculations. 做稳性和载荷计算Pass pendant line, shackle and buoy to anchor handling vessel. 将起抛锚短索, 卸扣和浮标吊起给起锚船Lower the windward anchor to seafloor. 抛上风锚到海底Pick up the leeward anchor first. 先起下风锚Take anchor chaser (or chaser) back to rig. 将捞/抛锚环送回平台Hook up towing lines to tug boat. 将拖缆连接到拖轮Sound fog signal for two seconds every twenty seconds. 发大雾信号, 每20秒钟响两秒Fishing 打捞The bit cutters have been lost in the hole. 牙轮落井Run in the reverse-circulation basket. 下反循环打捞篮There is a lot of junk in the hole. 井下有很多落物The fish is 235.46 meters long. 落鱼长度235.46米The fish top is at 2478.34 meters. 鱼顶位置2478.34米Coring 取芯Stop drilling for coring. 停钻准备取芯Make up core bit. 接取芯钻头What type of core bit is it? 这是什么型号的取芯钻头?Run in a diamond core bit. 下金刚石取芯钻头Let’s drop the ball for coring. 可以投球取芯The core has been broken off. 岩芯断了Put the core in the boxes. 把岩芯装在岩芯盒里Don’t brake suddenly. 不要猛刹车Take out the core. 岩芯出筒How long is the core? 岩芯多长The core recovery is 98%. 岩芯收获率是98%Run in the core barrel again. 继续下岩芯筒(或: 取芯筒)Run in hole core barrel. 下取芯筒Drop ball. 投钢球Recover core. 取出岩芯Use same parameters as for core #1. 使用与1#取芯同样的参数Freeing Stuck Pipe 卡钻与解卡The down-hole problems are very complicated. 井下情况很复杂The hole is tight. 遇阻了Overpull while tripping out. 起钻遇卡(overpull: 超拉力)The formation is unstable. 地层不稳定The wall caving is severe. 井壁垮塌严重There are many return cuttings. 返出岩屑特别多The mud returns have decreased. 返出泥浆减少The hole is enlarged. 井眼扩大了The pipe’s stuck. 卡钻了Pull up to 150 tons. 上提150吨Slack off to 50 tons. 下放至50吨Ream down all the tight points. 在所有遇阻点进行划眼The rotary table can’t rotate. 转盘转不动Where is the sticking point? 卡点在哪里Make a tensile test. 做拉伸试验Back it off above the free point. 在卡点以上倒扣Where is the back-off position? 脱扣位置在哪Plug the well for side tracking. 打水泥塞侧钻Abnormal Well Condition and Well Control异常井况与压井The mud is gas out. 泥浆有气侵The pit has lowered quickly. 泥浆池液面下降很快The hole lost returns. 井口不返泥浆The returns are unstable. 返出泥浆量忽大忽小Where’s the thief zone? 漏失层在哪里Cut down the flow rate. 降低排量Lower the mud density. 降低比重Cut down the hydrostatic pressure. 减少静压The gas smell is strong. 天然气味度很浓There’s some trace of oil. 发现有油花The pump pressure is fluctuating. 泵压不稳It is a zone of abnormal pressure. 这是异常压力层The hole (well) is kicking! 井涌啦!Shut in the BOP! 关闭防喷器Sound the general alarm quickly! 快发出综合警报The stand pipe pressure is 10 kg/cm2. 立管压力10公斤/厘米2 The casing pressure is 25 kg/cm2. 套压2510公斤/厘米2Fill out the kill sheet. 填写压井记录表Kill the well. 压井There’s a combination of lost returns and the kick. 又喷又漏, 情况复杂Reverse the gas out of the hole. 反循环排气What’s the lag time? 迟到时间是多少The well is now stable. 现在井眼已经稳定BOP and subsea Equipment 防喷器与水下设备Cut off the 30” conductor. 割掉30”隔水管Weld on the 30” bottom flange. 焊接30”法兰Hoist and nipple up 30” diverter. 吊装30”转喷器Change the 5” pipe rams to 3-1/2” rams. 把这个5”闸板换成3-1/2” Install blind ram. 安装防喷器的盲板芯子Check the seal ring of the conductor. 检查隔水管密封圈Cut off the lifting eye of the conductor. 切割隔水管耳环Test BOP. 测试防喷器Change annular BOP packing. 更换万能防喷器芯子Full pressure test the ram preventers. 对闸板防喷器进行全压试压Test annular BOP at 2500psi. 万能防喷器试压至2500psiCheck annular pressure. 检查环形空间压力Confirm the angle of the guide base. 确定基板角度The thread is covered with the quick-release protectors. 已戴好快卸护丝Establish the guide lines. 装导向绳Connect the TGB running tool. 接临时导向基板送入工具Land the TGB to sea. 下临时导向基板到海底Retrieve the running tool. 退出送入工具石油钻井英语--课堂上学不到的内容 2Run the BOP and risers. 下防喷器和隔水管Pick up the marine riser. 吊出隔水管Pick up the slip joint. 起伸缩节Adjust the riser tensioners. 调整隔水管张力Function test the diverter system. 对防喷器系统进行功能测试Retrieve the pin connector. 取出销钉连接器Move the BOP to the moonpool door. 将防喷器移到园井甲板的活动门上Run the test plug. 下试压塞Close the upper pipe ram. 关上部钻杆闸板防喷器Open the kill line valve. 开压井管线阀The compensation capacity is 400000 pounds. 补偿能力是400千磅The locking load is 1000000 pounds. 锁紧负荷1000千磅Support the riser. 接隔水管支撑环Remove the hose bundles. 卸下垮接软管Assure the self-controlled rotation. 保证自控转动Set the LMRP on the test pump. 将下部防喷器插入总成座放到试压桩上Connect the flex joint to the riser. 连接隔水管与挠性接头Land the BOP onto the well head. 座防喷器到井口头Run the subsea TV for monitoring. 下水下电视观察Remove all the riser running tools. 取出所有的隔水管送入工具BOP carrier. 防喷器叉车Lower the universal guide frame. 下放万能导向架Paint mark the top 6 meters of 30” conductor white. 在30”隔水管的顶部6米处用白漆涂上记号Check adequate length for guidelines. 检查导向绳的长度是否足够Move temporary guide base (TGB) into moonpool. 将临时导向基板到园井甲板Test pull to check connection. 试拉检查连接Grease TGB and running tool as required. 按要求给导向基板及下入工具上黄油Test fit TGB and running tool. 用下入工具试临时导向基板连接Check for junk inside shoe joint. 检查浮鞋内有无落物Pick up 30” conductor handling slings and shackles. 吊上下30”导管的索具和卸扣Is slope indicator properly mounted? 水平仪是否装好?Ensure subsea TV is in good condition. 确保水下电视处于良好的状态Place BOP stack on the test pump. 将防喷器组放在试压桩上Check condition of all 30” casing connectors. 检查所有30”套管接头的情况Replace O-rings as required. 按需要, 更换O性密封圈Attach slope indicator below camera position. 在摄像机下面装上水平仪Inspect and repair diverter. 检查并修理转喷器Prepare spud plate and wireline to check water depth. 准备测深板和钢丝绳测量水深Record all pressure tests on a chart recorder. 用试压表记录试压记录Visually inspect all sealing element. 目视检查所有密封件Check and tighten all bolts. 检查并上紧所有螺栓Bleed off surface accumulators. 地面管线排空气Check for leaks. 检查有无泄漏Lift BOP stack and replace wellhead connector AX ring. 吊起防喷器组并更换连接器AX密封圈Function test wellhead. 对井口头进行功能试验Fill kill and choke valves with seawater. 将压井阀和阻流阀注满海水Pressure test to 500psi then bleed off test pressure. 试压到500psi, 然后放掉压力Reduce hydraulic control manifold pressure to 5200 kpa. 将液压控制管线压力减少到5200千帕Switch to alternate control pod. 把闸门开关倒到控制面板Guidelines are slacked off. 导向绳松了Slack off drill pipe and release running tool. 放松钻杆并卸开下入工具Run subsea TV to observe bit entering the TGB. 下水电视观察钻头是否进入临时导向基板Don’t rotate until hole opener passes through the TGB. 在扩眼器通过临时导向基板前不要旋转Position permanent guide base (PGB) below rotary table. 在转盘下安放永久导向基板Monitor riser level via trip tank. 用计量罐来控制隔水管内的液面Pressure test to 5000psi. 试压5000psiPick up test mandril and place in BOP. 吊起试压防喷器芯子并装入防喷器组Safety and Firefighting 安全与消防Get a Work Permit before you can start the hot work. 办理作业许可证才能进行动火作业Welding is not allowed. 不准动焊Put on your (safety) helmet. 戴上安全帽It’s a high voltage area. 这是高压区That’s against the rule. 这是违章作业Don’t walk under the crane load. 不要在吊物下走动The repairing is under way. 正在检修Keep your hands clear! (Keep you hands off! Do not touch!) 不要乱动Wear and secure your safety belt. 戴上并系好安全带Life jacket must be worn when working outboard or overhead. 舷外或高空作业要穿救生衣Have your breathing apparatus near you. 保持放毒面具在附近It’s a drill. 这是演习It was a BOP drill. 这是防喷演习Get in the lifeboat in order. 按顺序进入救生艇Put on life jacket! 穿好救生衣Abandon the vessel! 弃船Sound the abandonment alarm! 发出弃船警报Go to the helideck! 去飞机坪集合Aboard the lifeboat. 登上救生艇Aboard the supply boat to shore! 乘拖船上岸Check life saving apparatus periodically. 定期检查救生设备It’s for fire fighting. 这是消防用的Start the fire pump. 启动消防泵This rope is too small. 这根绳子太细了It should be function tested. 需做功能测试A warning notice should be set up. 要挂警告牌Do you have an emergency program (contingency plan)? 你们有没有应急计划?It must be ready in an emergency condition. 必须始终保持良好的应急状态Will the typhoon hit our rig? 台风要袭击我们的平台吗?We will have to evacuate the rig. 我们要撤离平台Personnel on board (POB). 在船人员总数Sound fire alarm. 发消防警报This is a fire drill. 这是消防演习conduct abandon ship drill. 举行弃船演习Release the boat hooks. 释放救生艇吊钩Board the life boat. 登救生艇Remove the rust and paint with anti-corrosive primer. 除锈后上防锈底漆Three rafts are located near life boat station port side. 在左舷救生艇站附近还存放有3个救生筏Wear work vests when working below the cellar deck. 在圆井甲板面下面工作时须穿工作救生衣The station bills need to be updated. 应急部署表须更新Check the expiry date for all foam extinguisher. 检查所有泡沫灭火器的过期时间Close all the water-tight doors. 关闭所有水密门Safety procedure shall be followed at all the times. 在任何时候都应遵守安全程序Anchor wires should have a Spelter type socket at anchor side. 抛锚绳靠锚的一端应使用锌压头Colour code all the connection at the loading station. 在供给站管线接头处用颜色表明各管线Verify that a high level alarm is installed on the sludge tank. 确认污水舱安装有高位警报Don’t switch on during drilling operation. 钻井作业期间不能合闸Provide two independent means to start the emergency generator engine. 应急发电机柴油机应有两套独立的起动方法Have the boom pennant wires of port crane re-certified. 重新认证左舷吊车扒杆变幅绳Clean the internals of the emergency switchboard. 清洁应急配电盘内部Helicopter and Supply Vessel 直升机与供应船Load out Contractor’s riser at Zhanjiang anchorage. 在湛江锚地把承包商的隔水管装上平台Offload casing. (从供应船上)卸套管Load (offload or unload) the boat. 装(卸)船Get the food container loaded on the boat. 把食品集装箱装上船The helicopter will land on rig soon. 直升机很快就要在平台降落Tell the base to get (or send) a chopper here. 通知基地派飞机来Helicopters are not allowed to land here. 飞机不能降落Report the weather condition to the pilot. 向飞行员报天气Inform the boat come to standby. 通知拖轮过来待命Call the boat to come along port side. 通知拖轮过来靠左舷We will take the personnel basket. 我们乘坐吊篮Repair and Maintenance 检修Have an overall check. 进行全面检查MPI the brake linkage system. 对刹车连接系统进行磁粉探伤Demonstrate that the make-up cathead can pull 7000 lbs. 证明上扣猫头能拉到7000磅Determine the origin of the air leak and rectify this. 找出漏气的地方并处理Adjust the brake band equalizer beam properly. 适当调整刹带平衡梁Note that the 3000 hour inspection on TDS is due. 注意顶驱的3000小时保养时间已到Check sheave rope pocket wear with a 1 3/8”+1 1/32 template. 用1 3/8”+1/32”量规检查绳槽磨损的情况Repair the handrails on the crown. 修理天车台的栏杆Function test the anti-freefall brake on monthly basis. 每月对天车防碰装置进行功能试验Get me a spanner, please. 请递给我一把扳手Renew brake rim because of excessive wear. 更换磨损严重的刹车鼓Clearly mark safe working load (SWL) on the air winch below the rig floor. 表明钻台底下气动绞车的安全工作负荷Measure the master bushings for wear. 测量主补心磨损情况Have BOP ram opened up for internal inspection. 打开防喷器闸板进行内部检查Install a ground cable on the triplex pump motor. 给三缸泵马达安装接地线We need a 48” pipe wrench. 我们需要一把48”的管钳Strike it with a sledge hammer. 用大锤打We want a triangle file. 需要一把三角锉刀Tighten up the screw. 紧一下螺丝Check it with a level. 用水平尺量一下Put some engine oil. 抹点黄油Have it greased. 给它上黄油Put out of hole test string. 取出测试管串Check all the equipment. 检查所有设备There’s something wrong with it. 有点毛病Rig inspection will be performed in August. 验船安排在8月份Maintain the hoisting system. 保养提升系统Adjust the brake band. 调整绞车刹带Change the oil in the rotary gear box (transmission). 更换转盘变速箱机油Replace one water pump. 倒换一台冷却泵It’s quick-discharge air valve. 这是快速放气阀This clutch needs repair. 这台离合器需修理This tong needs replacing. 这把钳要更换了Slip 6 meters of the drilling line. 滑移钻井大绳6米Cut off 45 meters of the drilling line. 切割大绳45米Check the pump liners and pistons. 检查(泥浆)泵缸套和活塞The piston has been washed. 活塞刺坏了The supercharge pump doesn’t take in wat er. 灌注泵不上水Regulate the relief valve. 调整安全阀This part number is wrong. 这个配件号不对The multi-pen recorder has some problem. 多笔记录仪坏了Miscellaneous 其他No smoking here. 此处严禁吸烟Everything is OK. 一切准备就绪Speed up please. 请快点The geologist must be present. 地质人员必须到场We have to wait on weather. 必须等候天气There will be strong wind. 有强风Give me a hand, please. 请帮一下忙Do you understand? 明白吗?No way! 不行Man overboard! 有人落水Help! Help! 救命Someone is injured. Medic! 有人受伤了, 医生Call for the medic. 叫医生Get a stretcher please. 拿担架来No more than 4 persons. 不能超过4人Drinking liquor is not allowed. 不许喝酒Don’t overrun your equipment. 不要超负荷运转Be careful at work. 工作时要小心No joking here. 别开玩笑Rig up for logging. 准备电测What is the next step? 下一步怎么办?Get everything ready as soon as possible! 尽快做好一切准备附录一: 平台人员岗位名称一. 承包商人员( Contractor’s Personnel )Rig Manager 平台经理Equipment Supervisor 设备总监Materials Supervisor 材料总监Senior Toolpusher 高级队长Junior Toolpusher 值班队长Driller 司钻Sub Sea Engineer (SSE) 水下工程师Assistant Driller (AD) 副司钻Derrick Man 井架工Floor Man (roughneck) 钻工Barge Master (captain) 船长First Mate (Barge engineer) 大副Control Room Operator (CRO) 压载工Ballast Control Operator (BCO) 压载工Chief Engineer 轮机长Head of Routabout 甲板班长Crane Operator 吊车工Routabout 甲板工Mechanic 机械师Electrician 电气师Repairman 修理工Motorman 轮机员Welder 焊工Radio Operator 电报员Warehouse Man (stock Keeper) 材料员Medic 医生Safety Supervisor 安全监督Interpreter (translator) 翻译Chief Steward 管事Cook 厨师。

钻井英语手册

钻井英语手册

PART1 Installation of well head assembly and pressure test井口安装及测试1. Full pressure test the ram preventers. 对闸板防喷器进行全压试压。

2. Test annular BOP at 2500psi.( pound per square inch) 万能防喷器试压至2500psi。

3.Hoist and rig up the 30" Tee.吊装30"三通。

4.Connect the 12 "pneumatic valve and the flow line. 连接12"气阀及管线。

5.Hoist and nipple up the 30"diverter. 吊装30"转喷器。

6.Have the 30"diverter pressure-tested with 1000psi. 30"转喷器试压1000磅/英寸2。

7. Move the 135/8 "BOP to the well head. 将135/8"防喷器组移到井口。

8.This ring gasket can't be used any more. to Change a new one, please. 这个钢圈不能用了,换个新的。

9.Tighten up the well-head guy-lines . 井口绷绳绷紧一些。

10.Change the 5" pipe rams to 31/2 " rams. 把这个5"闸板换成31/2"的。

11.Have the annular preventer pressure-tested to 5,000psi. 环形防喷器试压5000磅/英寸2。

钻井英语手册

钻井英语手册

钻井英语手册第一部分海上钻井英语口语500句一、RIG JACKING-DOWN AND LEG-PULLING OUT 降船及拔桩1、Everything’s ready for the move? Has the unloading finished?准备工作做得怎么样?卸载做完没有?2、They are working to remove the wedges?现在正在拔桩脚楔块。

3、The derrick has been skidded to the towing position?井架已移到适航位置。

4、Drop NO.2 anchor first,and then No.3.先抛2号锚,后抛3号锚。

5、How far are going to lay out the anchor line?锚缆绳需要放多少?6、Keep five warps on the drum and lay out the rest.尽可能放,滚筒上留5圈。

7、We ’ve got through with the anchors,It ’s ready for the boat to connect now.已抛完锚,可以接拖了。

8、Have you got emergency equipments ready for the moving?拖航作业的应急器材准备完了吗?9、The variable load is over the allowable limit. We’ll have to unload the surpluscement,drilling to unload the surplus cement,drilling water and some diesel oil. 可变负荷超过允许量了,应该卸掉多余的水泥、钻井水,以及部分油。

10、Is it O.K to jack the rig down today?今天可以降船吗?11、We can’t jack down the rig as the weather is bad.天气不好,不能降船。

钻井常用英语手册

钻井常用英语手册

A Handbook of English for Offshore Oil Drilling海洋石油钻井常用英语手册附录一: 平台人员岗位名称一. 承包商人员( Contractor’s Personnel )Rig Manager 平台经理Equipment Supervisor 设备总监Materials Supervisor 材料总监Senior Toolpusher 高级队长Junior Toolpusher 值班队长Driller 司钻Sub Sea Engineer (SSE) 水下工程师Assistant Driller (AD) 副司钻Derrick Man 井架工Floor Man (roughneck) 钻工Barge Master (captain) 船长First Mate (Barge engineer) 大副Control Room Operator (CRO) 压载工Ballast Control Operator (BCO) 压载工Chief Engineer 轮机长Head of Routabout 甲板班长Crane Operator 吊车工Routabout 甲板工Mechanic 机械师Electrician 电气师Repairman 修理工Motorman 轮机员Welder 焊工Radio Operator 电报员Warehouse Man (stock Keeper) 材料员Medic 医生Safety Supervisor 安全监督Interpreter (translator) 翻译Chief Steward 管事Cook 厨师Steward 厨工Laundry Man 洗衣工二. 作业者及服务公司人员( Operator’s Personnel and Service Company Personnel) Drilling Superintendent 钻井监督Company Man (Operator’s Representative) 公司代表Geologist 地质师Mud Logging Engineer (Mud logger) 泥浆录井工程师Sample Catcher 捞砂工Mud Engineer 泥浆工程师ROV Engineer 潜水工程师Cementer 固井工Cement Engineer 固井工程师Testing Engineer 试油工程师Coring Engineer 取芯工程师Wireline Logging Engineer电测工程师附录二: 平台主要设备一. 钻井设备(Drilling Equipment): Drawworks 钻井绞车Rotary Table 转盘Bushing 补心Top Drive System (TDS) 顶驱Swivel 水龙头Crown Block 天车Traveling Block 游车Hook 大钩Derrick 井架Pipe Spinning Wrench 钻杆气动扳手Ezy-Torq 液压猫头Elmagco Brake 涡磁刹车Pipe handling Equipment 钻杆移动设备Iron roughneck 铁钻工Pipe Racking System 钻杆排放系统Drill String 钻柱Drilling Sub 钻井短节Fishing Tool 打捞工具Power Tong 动力大钳Air Winch (air tugger) 气动绞车Crown-O-Matic (Crown Saver) 防碰天车二. 泥浆系统(Mud System)Mud Pump 泥浆泵Shale shaker 振动筛Mud Cleaner 泥浆清洁器Desilter 除泥器Desander 除砂器Degasser 除气器Centrifuge 离心机Mud Agitator 泥浆搅拌器Mud Mixing System 泥浆混合系统Centrifugal Pump 离心泵Standpipe Manifold 立管管汇Rotary Hose 水龙带Bulk Air System and Tank 吹灰系统和灰罐三. 井控设备(Well Control Equipment): Ram Type Preventor 闸板防喷器Annular Type Preventor 万能防喷器BOP Stack 防喷器组Gate Valve 闸阀Choke and Kill Manifold 阻流压井管汇Remotely Operated Panel 远程控制面板Choke Control Panel 阻流控制面板BOP Handling Equipment 防喷器搬运设备Diverter 转喷器四. 海事系统(Marine System)Ballast System 压载系统Bilge System 污水系统Vent 通风口, 通气口Air Supply Fan 供气扇Mooring System 锚泊系统Communication Equipment 通讯系统Jacking System 升降系统Skidding System 井架滑移系统Windlass 锚机Anchor 锚Pendant 短索Buoy 浮标Lifting and Handling Equipment 起吊和搬运设备五. 机房(Engine Room)Diesel Engine 柴油机Emergency Generator 应急发电机Water Maker (desalinization unit) 造淡机Air Compressor 空气压缩机Boiler 锅炉Air-conditioning System 空调系统Sea Water Service Pump 海水供给系统Piping System 管汇系统Generator 发电机Transformer 变压器DC Motor 直流马达AC Motor 交流马达六. 安全设备(Safety Equipment)Fire Control System 消防控制系统Fire Detection System 火情探测系统CO2 System 二氧化碳系统Fixed Fire Extinguishing System 固定消防系统Portable Extinguisher 移动灭火器Fire-Fight Equipment 消防设备Foam System 泡沫系统Lifeboat 救生艇(Inflatable) Life Raft (气涨式)救生筏Davit 吊艇架Escape Routes 逃生路线Breathing Apparatus 呼吸器Life Buoy 救生圈Gas Detection System 气体探测系统Helicopter Facility 直升机设施Sick-Bay (Hospital) 医务室Pollution Control 防污控制七. 其他( Others)Cementing Unit 固井装置Well Testing Equipment 试油设备Mud Logging Unit 泥浆录井房Wire Logging Unit 电测装置ROV 潜水器Meter 米Foot 英尺Inch 英寸Supply Boat (supply vessel) 供应船Standby boat 值班船Day (night) Shift 白(夜)班Crew Change 倒班Crew 船员, 队员, 井队Position 岗位Draft (draught) 吃水Air Gap 空气间隙, 气隙Penetration (桩腿插桩)入泥Evacuation 撤离Rig (Drilling rig) 钻机, 钻井船附录三. 平台场所Bow 船首Stern 船尾Forward (FWD) or fore 船首的Aft 船尾的Port 左舷Starboard (STBD) 右舷Upper Deck 上部甲板Main Deck 主甲板Quarters (living quarters, accommodation area) 生活区Drill Floor (Rig floor) 钻台Bridge (Pilot house, Steerwheel house) 驾驶室Control Room 控制室Helideck 直升机甲板Cementing Unit Room 固井泵房Air Compressor Room 空气压缩机房BOP Control Room BOP控制房Radio Room 报房Engine Room 机房Thruster Room 推进器房Warehouse (Store) 材料库房Paint Room (paint locker) 油漆房库Leg 桩腿Jacking House 升降室Column 立柱Sack Storage Area 散装材料储存区Mud pit 泥浆池Cellar Deck 圆井甲板Riser Rack Area 隔水管排放区Pipe Rack Area 钻杆排放区Pipe Slide 滑道Ramp 坡道Spud Tank 桩脚箱Pontoon 浮箱Moonpool 月池/园井甲板Pump Room 泵房Shale Shaker House 振动筛房Coffee Room 咖啡室Rig Office 平台办公室Mess (dining) Room 餐厅Recreation Room 娱乐房TV RoomChange Room 工衣房Kitchen 厨房附录四. 钻具,井口工具,打捞工具Drill Pipe 钻杆Drill Collar 钻铤Heavy Weight Drill Pipe 加重钻杆Elevator 吊卡Tong 大钳Make-up Tong 上扣大钳Break-out Tong 卸扣大钳Mud Box 泥浆防喷盒Casing Stabbing Board 套管扶正器Slips 卡瓦Spider 卡盘Mouse Hole 小鼠洞(接单根用) Kelly Spinner 方钻杆旋转器Kelly Cock 方钻杆阀Chain Tong 链钳Casing 套管Tubing 油管Drill String 钻柱Jar (drilling jar) 震击器Right Hand Thread 正扣Left Hand Thread 反扣Stabilizer 扶正器Rabit 通管器Liner 尾管Conductor 导管Thread Protector 护丝Stand (钻杆) 立柱Single (钻杆) 单根Joint (钻具) 根Bend 弯头Sub 短节Pup Joint 短钻杆, 短节Connector 接头Bit 钻头Bit Breaker 钻头盒Box 母扣Pin 公扣Hole Opener 开眼钻头Reamer 扩眼钻头Overshot 打捞筒Junk Basket 打捞篮Junk Mill 平头磨鞋Spear 打捞矛Fishing Tap 打捞公锥Cross Over Sub (XO Sub) 转换接头Bottom Hole Assembly (BHA) 下部钻具组合附录五. 材料和工具Steel 钢Iron 铁Wood 木Chemicals 化学品Cement 水泥Barite 重晶石Potable Water 淡水Drilling Water 钻井水Sea Water 海水Fuel 柴油Helifuel 飞机燃油Lubricant (Lube/Lube oil) 润滑油Grease 黄油Thread Dope 丝扣油Ballast Water 压载水Bilge Water 舱底水Gasoline 汽油Mud 泥浆Bentonite 般土Additive 添加剂Caustic Soda 烧碱Weight Material 加重材料Thinner 稀释剂Oxygen 氧气Nitrogen 痰气Hydrogen Sulphide 二氧化硫Acetylene 乙炔Compressed Air 压缩空气Hydraulic Fluid 液压油Spanner 扳手Hammer 铁锤Screw Driver 螺丝刀Multimeter 万用表Welding Machine 焊机Bar 撬杠Shackle 卸扣Sling (钢丝) 绳套Container 集装箱附录六. 常用缩写形式BHA: bottom hole assembly 下部钻具组合DP: drill pipe 钻杆DC: drill collar 钻铤HWDP: heavy weight drill pipe 加重钻杆BOP: blowout preventer 防喷器TD: total depth 总深TVD: true vertical depth (定向井的)垂直深度SCR: silicon controlled rectifier 可控硅OD: outside diameter 外径ID: inside diameter 内径BBL: barrel 桶LB: (拉丁语) Libra=pound (重量单位) PSI: pound per square inch 磅/英寸2 GAL: gallon 加仑POOH: pull out of hole 起钻RIH: run in hole 下钻WOW: wait on weather 等候天气WOC: wait on cement 候凝JU: Jackup 自升式(钻井船)SEMI: semi submersible 半潜式(钻井船)RPM: revolution per minute 转速/分钟LPM: liter per minute 升/分钟KN: knot 节(海里/小时)SWL: safe working load 安全工作负荷API: American Petroleum Institute 美国石油协会IADC: international association of drilling contractors 国际钻井承包商协会MPI: magnetic particle inspection 磁粉探伤附录七:常用语Drilling 钻井Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业.Prepared bell nipple. 准备”喇叭口”短节.Make up 2 joints of drill pipe. 接两根钻杆.Break out this connection. 卸开该接头.Run hole opener to sea bed. 下扩眼器到海底Mix gel fluid for drilling conductor hole. 为钻导管井眼配制高粘度泥浆.Make up bottom hole assembly. 组合下部钻具Check and reset crown-saver on every tour. 每个班都要检查并重新调整天车防碰装置.Number stands on trip out and trip in. 起下钻时给立柱编号.Pick up BHA and run to seafloor. 将下部钻具下到海底.Pick up stands. 接立柱Don’t drill faster than 15 minutes for 1 stand. 钻进速度别超过15分钟1根立柱Drop TOTCO. 投(陶特)测斜仪Fish TOTCO with overshot. 用打捞筒捞起测斜仪Resume drilling to T.D. 继续钻进到总深Circulate 15 minutes.循环15分钟Run in hole. 下钻Put out of hole. 起钻Make an inventory of all ring gaskets. 开一个所有垫圈的清单Use spinning tong. 使用气动扳手Operate the air winch. 操作气动绞车Lay down 57 joints of 5” drill pipe. 甩57根钻杆Pick up drill stem test tool. 提起钻杆测试工具Circulate mud for 2 hours. 循环泥浆2小时Move string during circulation. 在循环时注意活动钻具Circulate hole clean. 循环清洗井眼Circulate bottoms up. 循环泥浆几周Fill up every 5 stands. 每5柱灌泥浆一次Check mud weight every 15 minutes. 每15分钟检查泥浆比重Reverse out excess cement. 反循环替出多余的泥浆Change/replace old mud by new mud. 用新的泥浆替换出旧的泥浆Stop drilling. 停止钻进Drilling ahead. 钻进Pull out of hole bit. 起出钻头Change bit. 换钻头Run the wear bushing. 下抗磨补心The bit thread type is regular pin. 钻头丝扣是正规公扣What’s the make-up torque? 上扣扭矩要多大?Run in 9” collars. 下9”钻铤The cathead can’t give enough torque. 猫头力量不够Connect crossover sub. 接上配合接头The tong angle is too small. 大钳的角度太小了Stop circulating. 停止循环泥浆Break out the stand. 卸立柱Set the single into the mousehole. 把这个单根放进鼠洞Can we break out the pipe with rotary table? 可用转盘卸扣吗? No! Break it out with tong. 不行! 要用大钳卸扣Spin it out with the air spanner. 用气动扳手卸扣Put the pipe wiper on the string. 装上钻杆刮泥器Don’t set this stand back. 这根钻杆不要放在钻杆盒上Make up the lift sub. 接好提升短节Secure the safety clamp. 上紧安全卡瓦The bit is nearing the shoe. 钻头快到套管鞋了Slow down the running speed. 放慢下放速度This is the undergauged interval. 这是缩径井段This is the drilling program. 这是钻井设计书How much weight on bit is required? 要加多少钻压?Keep the rotary speed at 120---140 RPM. 转速保持120---140转/分Keep the flow rate at 3000 LPM. 保持排量3000升/分The pump pressure is too high. 泵压太高了Don’t ream the hole too fast. 划眼不要太快Notice the rotary torque. 注意转盘扭矩的变化The penetration rate is getting slower. 钻速变慢了The bit is nearly worn out. 钻头快磨光了Stop drilling at 2000 meters. 钻至2000米停钻Circulate for one hour. 循环一个小时The pump pressure has increased. 泵压升高了One nozzle may be plugged. 可能有一个水眼(或: 喷嘴)堵了What is the hook load? 悬重多少?What’s the pick-up weight? 上提重量是多少?What’s the lowering weight? 下放重量是多少?Run in HWDP. 下加重钻杆A stabilizer is needed here. 这里需要一个扶正器This is a flexible sub. 这是挠性接头This is the BHA log. 这是下部钻具组合记录Record all outside and inside diameters. 记录好所有(入井工具的)内外径We need a short drill collar. 需要一根短钻铤Pull the cat line. 拉猫头Operate the break lever. 操作(或:扶)刹把Stop the pumps. 停泵Make a wiper trip. 通井Retrieve wear bushing. 取出抗磨补心Bleed off pressure. (释)放压(力)Keep 5 wraps on the drum. 滚筒上留5圈Set slips. 座上卡瓦If tight hole, repeat wiper trip. 如果井眼紧, 重复划眼Setback bottom hole assembly. 将下部钻具立于钻杆盒内Make sure all alarms are on. 确保所有的警报信号都开着Lay down TDS spinner. 拆下顶部驱动的旋扣器Run in hole bit #15 to bottom. 用15号钻头下钻到井底Run in hole to casing shoe. 下钻至套管鞋Pick up same bit and BHA. 装上同样的钻头和钻具组合Lay down 5” HW drill pipe. 甩5”加重钻杆Move string every 2 hours. 每2小时活动钻具一次Keep area around shaker clean. 保持振动筛区域干净Control trip gas. 控制起下钻气Ream if needed. 如必要时进行划眼Select the best penetration rate. 选择最佳钻进速度Fix the traveling assembly. 固定游动系统Check power tongs and spinning rope are on drill floor. 检查动力钳和尾绳是否在钻台What’s the weight on bit? 钻压是多少?What is the BHA of this well? 这口井的下部钻具如何组合?Drill out cement. 钻穿水泥Drill out 20” casing shoe. 钻穿20”套管鞋Latch the elevator. 扣吊卡Unlatch the elevator. 开吊卡Set the slips. 放卡瓦Adjust the crown-o-matic (crown saver). 调整防碰天车Lock the hook pin. 锁紧大钩销子Check OD of stabilizer. 检查扶正器的外径Perform leak off test. 进行地层破裂(或:渗漏)测试Connect kill and choke line. 接上压井和放喷管线Reverse out the drill pipe. 反循环清洗钻杆Make a short trip. 进行短途起下钻Change the cutters. 换割刀Slug the pipe. 灌重泥浆Drill the stand down. 钻完立柱Start/run the shale shaker. 开振动筛Start the desanders. 开除砂器Start the desilters. 开除泥器Change it with a 40 mesh screen. 换成40目筛布Shut it off. 关掉Pull it to the cat ramp. 把它拉到坡道上去Make a fast connection. 接单根要快Don’t dump the mud into the sea. 不要把泥浆排放到海里Disconnect it with a chain tong. 用链钳卸开Put a thread protector. 加一个(丝扣)护箍Can we use the power slips? 可以使用动力卡瓦吗?Casing and Cementing 下套管与固井Run in hole to bottom for wiper trip. 下钻通井This is the casing program. 这是套管程序Prepare for running casing. 准备下套管Make everything ready for running 7”casing. 做好下7”套管的准备Make cementing job. 固井Displace cementing with mud pump. 用泥浆泵替泥浆Set cement plug from 2940 to 2790m. 在2940到2790米井段打水泥塞Pick up cementing head. 接水泥头Cement samples are hard. 水泥样已凝固Pump in 3 cubic meters of spacer. 注3方隔离液Pump down the plug. 泵压(胶)塞Wait on cement. 候凝The guide shoe will be connected. 接引鞋Connect the floor collar. 接浮箍Connect the air line to the casing stabbing board. 接好套管扶正台的气管线Run casing with the 350T slip elevator. 用350吨卡瓦式吊卡下套管Clean and dry 20” casing threads with rags. 清洁并擦干20”套管丝扣Where is the rabbit for drifting the casing? 套管通径规在哪里?Rig Move, Anchoring and Positioning 拖航, 抛锚, 定位What is our position now? 我们现在船位在哪里?Wh at’s the moving speed now? (What’s the towering speed?) 拖航速度是多少? The speed is about 4 knots. 船速是4节左右Which one is the main tug? 主拖是哪条船?The main tug is Nanhai 205. 主拖是南海205Which one is the chase boat? 护航船是哪一条?How much is the horse power? 有多大马力?She has 6000 HP. 有6000马力Move the rig off location 50 feet. 将平台移开50英尺We are ready to drop the anchor. 我们已经做好抛锚的准备了Secure all the movable equipment. 固定好各种活动的设备Preload. (自升式)压载Ballast. (半潜式)压载Put the preload water into the tank. 向压载舱灌压压载水We need 5500 tons of preload water. 需要5500吨压载水Shall we preload right now? 马上开始压载吗?Drain the water off. 放水The rig is overloaded. 平台已超载Jack up (jack down) the rig. 升(降)船The draft is 3.5 meters. 船体吃水3.5米The jetting pressure is 100psi. 冲桩压力是100psiPenetrate the legs. 插桩How much penetration do we have? 入泥多深了?No.1 and No.2 legs indicate 10 meters. 1,2号桩腿插入10米Fix the upper and lower wedges. 固定上下楔块Pay out the anchor line. 放出锚缆绳Skid the derrick. 移开井架The rig is short of potable water now. 平台缺乏饮用水Drop No.2 and No.3 anchors. 抛2号和3号锚Why has the main engine stopped? 主机为什么停?Unleash the drilling tools. 卸开钻具Tighten up. 绷紧(或:上紧)一点Turn on the cooling water for the windlasses. 开锚机刹车冷却水Retrieve the No.1 to No.8 anchors. 起1到8号锚Check the paint marks at the anchor winches. 检查锚机上的油漆记号Prepare for a location move. 准备好移井位Commence anchor handling. 开始起锚(或抛锚)Secure all equipment stored on deck. 固定好所有存放在甲板上的设备Carry out stability and load calculations. 做稳性和载荷计算Pass pendant line, shackle and buoy to anchor handling vessel. 将起抛锚短索, 卸扣和浮标吊起给起锚船Lower the windward anchor to seafloor. 抛上风锚到海底Pick up the leeward anchor first. 先起下风锚Take anchor chaser (or chaser) back to rig. 将捞/抛锚环送回平台Hook up towing lines to tug boat. 将拖缆连接到拖轮Sound fog signal for two seconds every twenty seconds. 发大雾信号, 每20秒钟响两秒Fishing 打捞The bit cutters have been lost in the hole. 牙轮落井Run in the reverse-circulation basket. 下反循环打捞篮There is a lot of junk in the hole. 井下有很多落物The fish is 235.46 meters long. 落鱼长度235.46米The fish top is at 2478.34 meters. 鱼顶位置2478.34米Coring 取芯Stop drilling for coring. 停钻准备取芯Make up core bit. 接取芯钻头What type of core bit is it? 这是什么型号的取芯钻头? Run in a diamond core bit. 下金刚石取芯钻头Let’s drop the ball for coring. 可以投球取芯The core has been broken off. 岩芯断了Put the core in the boxes. 把岩芯装在岩芯盒里Don’t brake suddenly. 不要猛刹车Take out the core. 岩芯出筒How long is the core? 岩芯多长The core recovery is 98%. 岩芯收获率是98%Run in the core barrel again. 继续下岩芯筒(或: 取芯筒)Run in hole core barrel. 下取芯筒Drop ball. 投钢球Recover core. 取出岩芯Use same parameters as for core #1. 使用与1#取芯同样的参数Freeing Stuck Pipe 卡钻与解卡The down-hole problems are very complicated. 井下情况很复杂The hole is tight. 遇阻了Overpull while tripping out. 起钻遇卡(overpull: 超拉力)The formation is unstable. 地层不稳定The wall caving is severe. 井壁垮塌严重There are many return cuttings. 返出岩屑特别多The mud returns have decreased. 返出泥浆减少The hole is enlarged. 井眼扩大了The pipe’s stuck. 卡钻了Pull up to 150 tons. 上提150吨Slack off to 50 tons. 下放至50吨Ream down all the tight points. 在所有遇阻点进行划眼The rotary table can’t rotate. 转盘转不动Where is the sticking point? 卡点在哪里Make a tensile test. 做拉伸试验Back it off above the free point. 在卡点以上倒扣Where is the back-off position? 脱扣位置在哪Plug the well for side tracking. 打水泥塞侧钻Abnormal Well Condition and Well Control异常井况与压井The mud is gas out. 泥浆有气侵The pit has lowered quickly. 泥浆池液面下降很快The hole lost returns. 井口不返泥浆The returns are unstable. 返出泥浆量忽大忽小Where’s the thief zone? 漏失层在哪里Cut down the flow rate. 降低排量Lower the mud density. 降低比重Cut down the hydrostatic pressure. 减少静压The gas smell is strong. 天然气味度很浓There’s some trace of oil. 发现有油花The pump pressure is fluctuating. 泵压不稳It is a zone of abnormal pressure. 这是异常压力层The hole (well) is kicking! 井涌啦!Shut in the BOP! 关闭防喷器Sound the general alarm quickly! 快发出综合警报The stand pipe pressure is 10 kg/cm2. 立管压力10公斤/厘米2The casing pressure is 25 kg/cm2. 套压2510公斤/厘米2Fill out the kill sheet. 填写压井记录表Kill the well. 压井There’s a combination of lost returns and the kick. 又喷又漏, 情况复杂Reverse the gas out of the hole. 反循环排气What’s the lag time? 迟到时间是多少The well is now stable. 现在井眼已经稳定BOP and subsea Equipment 防喷器与水下设备Cut off the 30” conductor. 割掉30”隔水管Weld on the 30” bottom flange. 焊接30”法兰Hoist and nipple up 30” diverter. 吊装30”转喷器Change the 5” pipe rams to 3-1/2” rams. 把这个5”闸板换成3-1/2” Install blind ram. 安装防喷器的盲板芯子Check the seal ring of the conductor. 检查隔水管密封圈Cut off the lifting eye of the conductor. 切割隔水管耳环Test BOP. 测试防喷器Change annular BOP packing. 更换万能防喷器芯子Full pressure test the ram preventers. 对闸板防喷器进行全压试压Test annular BOP at 2500psi. 万能防喷器试压至2500psiCheck annular pressure. 检查环形空间压力Confirm the angle of the guide base. 确定基板角度The thread is covered with the quick-release protectors. 已戴好快卸护丝Establish the guide lines. 装导向绳Connect the TGB running tool. 接临时导向基板送入工具Land the TGB to sea. 下临时导向基板到海底Retrieve the running tool. 退出送入工具Run the BOP and risers. 下防喷器和隔水管Pick up the marine riser. 吊出隔水管Pick up the slip joint. 起伸缩节Adjust the riser tensioners. 调整隔水管张力Function test the diverter system. 对防喷器系统进行功能测试Retrieve the pin connector. 取出销钉连接器Move the BOP to the moonpool door. 将防喷器移到园井甲板的活动门上Run the test plug. 下试压塞Close the upper pipe ram. 关上部钻杆闸板防喷器Open the kill line valve. 开压井管线阀The compensation capacity is 400000 pounds. 补偿能力是400千磅The locking load is 1000000 pounds. 锁紧负荷1000千磅Support the riser. 接隔水管支撑环Remove the hose bundles. 卸下垮接软管Assure the self-controlled rotation. 保证自控转动Set the LMRP on the test pump. 将下部防喷器插入总成座放到试压桩上Connect the flex joint to the riser. 连接隔水管与挠性接头Land the BOP onto the well head. 座防喷器到井口头Run the subsea TV for monitoring. 下水下电视观察Remove all the riser running tools. 取出所有的隔水管送入工具BOP carrier. 防喷器叉车Lower the universal guide frame. 下放万能导向架Paint mark the top 6 meters of 30” conductor white. 在30”隔水管的顶部6米处用白漆涂上记号Check adequate length for guidelines. 检查导向绳的长度是否足够Move temporary guide base (TGB) into moonpool. 将临时导向基板到园井甲板Test pull to check connection. 试拉检查连接Grease TGB and running tool as required. 按要求给导向基板及下入工具上黄油Test fit TGB and running tool. 用下入工具试临时导向基板连接Check for junk inside shoe joint. 检查浮鞋内有无落物Pick up 30” conductor handling slings and shackles. 吊上下30”导管的索具和卸扣Is slope indicator properly mounted? 水平仪是否装好?Ensure subsea TV is in good condition. 确保水下电视处于良好的状态Place BOP stack on the test pump. 将防喷器组放在试压桩上Check condition of all 30” casing connectors. 检查所有30”套管接头的情况Replace O-rings as required. 按需要, 更换O性密封圈Attach slope indicator below camera position. 在摄像机下面装上水平仪Inspect and repair diverter. 检查并修理转喷器Prepare spud plate and wireline to check water depth. 准备测深板和钢丝绳测量水深Record all pressure tests on a chart recorder. 用试压表记录试压记录Visually inspect all sealing element. 目视检查所有密封件Check and tighten all bolts. 检查并上紧所有螺栓Bleed off surface accumulators. 地面管线排空气Check for leaks. 检查有无泄漏Lift BOP stack and replace wellhead connector AX ring. 吊起防喷器组并更换连接器AX密封圈Function test wellhead. 对井口头进行功能试验Fill kill and choke valves with seawater. 将压井阀和阻流阀注满海水Pressure test to 500psi then bleed off test pressure. 试压到500psi, 然后放掉压力Reduce hydraulic control manifold pressure to 5200 kpa. 将液压控制管线压力减少到5200千帕Switch to alternate control pod. 把闸门开关倒到控制面板Guidelines are slacked off. 导向绳松了Slack off drill pipe and release running tool. 放松钻杆并卸开下入工具Run subsea TV to observe bit entering the TGB. 下水电视观察钻头是否进入临时导向基板Don’t rotate until ho le opener passes through the TGB. 在扩眼器通过临时导向基板前不要旋转Position permanent guide base (PGB) below rotary table. 在转盘下安放永久导向基板Monitor riser level via trip tank. 用计量罐来控制隔水管内的液面Pressure test to 5000psi. 试压5000psiPick up test mandril and place in BOP. 吊起试压防喷器芯子并装入防喷器组Safety and Firefighting 安全与消防Get a Work Permit before you can start the hot work. 办理作业许可证才能进行动火作业Welding is not allowed. 不准动焊Put on your (safety) helmet. 戴上安全帽It’s a high voltage area. 这是高压区That’s against the rule. 这是违章作业Don’t walk under the crane load. 不要在吊物下走动The repairing is under way. 正在检修Keep your hands clear! (Keep you hands off! Do not touch!) 不要乱动Wear and secure your safety belt. 戴上并系好安全带Life jacket must be worn when working outboard or overhead. 舷外或高空作业要穿救生衣Have your breathing apparatus near you. 保持放毒面具在附近It’s a drill. 这是演习It was a BOP drill. 这是防喷演习Get in the lifeboat in order. 按顺序进入救生艇Put on life jacket! 穿好救生衣Abandon the vessel! 弃船Sound the abandonment alarm! 发出弃船警报Go to the helideck! 去飞机坪集合Aboard the lifeboat. 登上救生艇Aboard the supply boat to shore! 乘拖船上岸Check life saving apparatus periodically. 定期检查救生设备It’s for fire fighting. 这是消防用的Start the fire pump. 启动消防泵This rope is too small. 这根绳子太细了It should be function tested. 需做功能测试A warning notice should be set up. 要挂警告牌Do you have an emergency program (contingency plan)? 你们有没有应急计划?It must be ready in an emergency condition. 必须始终保持良好的应急状态Will the typhoon hit our rig? 台风要袭击我们的平台吗?We will have to evacuate the rig. 我们要撤离平台Personnel on board (POB). 在船人员总数Sound fire alarm. 发消防警报This is a fire drill. 这是消防演习conduct abandon ship drill. 举行弃船演习Release the boat hooks. 释放救生艇吊钩Board the life boat. 登救生艇Remove the rust and paint with anti-corrosive primer. 除锈后上防锈底漆Three rafts are located near life boat station port side. 在左舷救生艇站附近还存放有3个救生筏Wear work vests when working below the cellar deck. 在圆井甲板面下面工作时须穿工作救生衣The station bills need to be updated. 应急部署表须更新Check the expiry date for all foam extinguisher. 检查所有泡沫灭火器的过期时间Close all the water-tight doors. 关闭所有水密门Safety procedure shall be followed at all the times. 在任何时候都应遵守安全程序Anchor wires should have a Spelter type socket at anchor side. 抛锚绳靠锚的一端应使用锌压头Colour code all the connection at the loading station. 在供给站管线接头处用颜色表明各管线Verify that a high level alarm is installed on the sludge tank. 确认污水舱安装有高位警报Don’t switch on during drilling operation. 钻井作业期间不能合闸Provide two independent means to start the emergency generator engine. 应急发电机柴油机应有两套独立的起动方法Have the boom pennant wires of port crane re-certified. 重新认证左舷吊车扒杆变幅绳Clean the internals of the emergency switchboard. 清洁应急配电盘内部Helicopter and Supply Vessel 直升机与供应船Load out Contractor’s riser at Zhanjiang anchorage. 在湛江锚地把承包商的隔水管装上平台Offload casing. (从供应船上)卸套管Load (offload or unload) the boat. 装(卸)船Get the food container loaded on the boat. 把食品集装箱装上船The helicopter will land on rig soon. 直升机很快就要在平台降落Tell the base to get (or send) a chopper here. 通知基地派飞机来Helicopters are not allowed to land here. 飞机不能降落Report the weather condition to the pilot. 向飞行员报天气Inform the boat come to standby. 通知拖轮过来待命Call the boat to come along port side. 通知拖轮过来靠左舷We will take the personnel basket. 我们乘坐吊篮。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

A Handbook of English for Oil Drilling石油钻井常用英语手册职工培训教材系列辽河石油勘探局钻井二公司六分公司二OO七年四月A Handbook of English for Oil Drilling石油钻井常用英语手册一、DRILLING 钻井1.Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业.2.Prepared bell nipple. 准备”喇叭口”短节.3.Make up 2 joints of drill pipe. 接两根钻杆.4.Break out this connection. 卸开该接头.5.Make up bottom hole assembly. 组合下部钻具6.Check and reset crown-saver on every tour. 每个班都要检查并重新调整天车防碰装置.7.Number stands on trip out and trip in. 起下钻时给立柱编号.8.Pick up BHA and run to seafloor. 将下部钻具下到海底.9.Pick up stands. 接立柱10.Don’t drill faster than 15 minutes for 1 stand. 钻进速度别超过15分钟1根立柱11.Drop TOTCO. 投(陶特)测斜仪12.Fish TOTCO with overshot. 用打捞筒捞起测斜仪13.Resume drilling to T.D. 继续钻进到总深14.Circulate 15 minutes.循环15分钟15.Run in hole. 下钻16.Put out of hole. 起钻17.Make an inventory of all ring gaskets. 开一个所有垫圈的清单e spinning tong. 使用气动扳手19.Operate the air winch. 操作气动绞车y down 57 joints of 5” drill pipe. 甩57根钻杆21.Pick up drill stem test tool. 提起钻杆测试工具22.Circulate mud for 2 hours. 循环泥浆2小时23.Move string during circulation. 在循环时注意活动钻具24.Circulate hole clean. 循环清洗井眼25.Circulate bottoms up. 循环泥浆几周26.Fill up every 5 stands. 每5柱灌泥浆一次27.Check mud weight every 15 minutes. 每15分钟检查泥浆比重28.Reverse out excess cement. 反循环替出多余的泥浆29.Change/replace old mud by new mud. 用新的泥浆替换出旧的泥浆30.Stop drilling. 停止钻进31.Drilling ahead. 钻进32.Pull out of hole bit. 起出钻头33.Change bit. 换钻头34.Run the wear bushing. 下抗磨补心35.The bit thread type is regular pin. 钻头丝扣是正规公扣36.What’s the make-up torque? 上扣扭矩要多大?37.Run in 9” collars. 下9”钻铤38.The cathead ca n’t give enough torque. 猫头力量不够39.Connect crossover sub. 接上配合接头40.The tong angle is too small. 大钳的角度太小了41.Stop circulating. 停止循环泥浆42.Break out the stand. 卸立柱43.Set the single into the mousehole. 把这个单根放进鼠洞44.Can we break out the pipe with rotary table? 可用转盘卸扣吗?45.No! Break it out with tong. 不行! 要用大钳卸扣46.Spin it out with the air spanner. 用气动扳手卸扣47.Put the pipe wiper on the string. 装上钻杆刮泥器48.Don’t set this stand back. 这根钻杆不要放在钻杆盒上49.Make up the lift sub. 接好提升短节50.Secure the safety clamp. 上紧安全卡瓦51.The bit is nearing the shoe. 钻头快到套管鞋了52.Slow down the running speed. 放慢下放速度53.This is the undergauged interval. 这是缩径井段54.This is the drilling program. 这是钻井设计书55.How much weight on bit is required? 要加多少钻压?56.Keep the rotary speed at 120---140 RPM. 转速保持120---140转/分57.Keep the flow rate at 3000 LPM. 保持排量3000升/分58.The pump pressure is too high. 泵压太高了59.Don’t ream the hole too fast. 划眼不要太快60.Notice the rotary torque. 注意转盘扭矩的变化61.The penetration rate is getting slower. 钻速变慢了62.The bit is nearly worn out. 钻头快磨光了63.Stop drilling at 2000 meters. 钻至2000米停钻64.Circulate for one hour. 循环一个小时65.The pump pressure has increased. 泵压升高了66.One nozzle may be plugged. 可能有一个水眼(或: 喷嘴)堵了67.What is the hook load? 悬重多少?68.What’s the pick-up weight? 上提重量是多少?69.What’s the lowering weight? 下放重量是多少?70.Run in HWDP. 下加重钻杆71.A stabilizer is needed here. 这里需要一个扶正器72.This is a flexible sub. 这是挠性接头73.This is the BHA log. 这是下部钻具组合记录74.Record all outside and inside diameters. 记录好所有(入井工具的)内外径75.We need a short drill collar. 需要一根短钻铤76.Pull the cat line. 拉猫头77.Operate the break lever. 操作(或:扶)刹把78.Stop the pumps. 停泵79.Make a wiper trip. 通井80.Retrieve wear bushing. 取出抗磨补心81.Bleed off pressure. (释)放压(力)82.Keep 5 wraps on the drum. 滚筒上留5圈83.Set slips. 座上卡瓦84.If tight hole, repeat wiper trip. 如果井眼紧, 重复划眼85.Setback bottom hole assembly. 将下部钻具立于钻杆盒内86.Make sure all alarms are on. 确保所有的警报信号都开着y down TDS spinner. 拆下顶部驱动的旋扣器88.Run in hole bit #15 to bottom. 用15号钻头下钻到井底89.Run in hole to casing shoe. 下钻至套管鞋90.Pick up same bit and BHA. 装上同样的钻头和钻具组合y down 5” HW drill pipe. 甩5”加重钻杆92.Move string every 2 hours. 每2小时活动钻具一次93.Keep area around shaker clean. 保持振动筛区域干净94.Control trip gas. 控制起下钻气95.Ream if needed. 如必要时进行划眼96.Select the best penetration rate. 选择最佳钻进速度97.Fix the traveling assembly. 固定游动系统98.Check power tongs and spinning rope are on drill floor. 检查动力钳和尾绳是否在钻台99.What’s the we ight on bit? 钻压是多少?100.What is the BHA of this well? 这口井的下部钻具如何组合?101.Drill out cement. 钻穿水泥102.Drill out 20” casing shoe. 钻穿20”套管鞋tch the elevator. 扣吊卡104.Unlatch the elevator. 开吊卡105.Set the slips. 放卡瓦106.Adjust the crown-o-matic (crown saver). 调整防碰天车107.Lock the hook pin. 锁紧大钩销子108.Check OD of stabilizer. 检查扶正器的外径109.Perform leak off test. 进行地层破裂(或:渗漏)测试110.Connect kill and choke line. 接上压井和放喷管线111.Reverse out the drill pipe. 反循环清洗钻杆112.Make a short trip. 进行短途起下钻113.Change the cutters. 换割刀114.Slug the pipe. 灌重泥浆115.Drill the stand down. 钻完立柱116.Start/run the shale shaker. 开振动筛117.Start the desanders. 开除砂器118.Start the desilters. 开除泥器119.Change it with a 40 mesh screen. 换成40目筛布120.Shut it off. 关掉121.Pull it to the cat ramp. 把它拉到坡道上去122.Make a fast connection. 接单根要快123.Don’t dump the mud into the s ea. 不要把泥浆排放到海里124.Disconnect it with a chain tong. 用链钳卸开125.Put a thread protector. 加一个(丝扣)护箍126.Can we use the power slips? 可以使用动力卡瓦吗?二、CASING AND CEMENTING 下套管与固井127.R un in hole to bottom for wiper trip. 下钻通井128.T his is the casing program. 这是套管程序129.P repare for running casing. 准备下套管130.M ake everything ready for running 7”casing. 做好下7”套管的准备131.M ake cementing job. 固井132.D isplace cementing with mud pump. 用泥浆泵替泥浆133.S et cement plug from 2940 to 2790m. 在2940到2790米井段打水泥塞134.P ick up cementing head. 接水泥头135.C ement samples are hard. 水泥样已凝固136.P ump in 3 cubic meters of spacer. 注3方隔离液137.P ump down the plug. 泵压(胶)塞138.W ait on cement. 候凝139.T he guide shoe will be connected. 接引鞋140.C onnect the floor collar. 接浮箍141.C onnect the air line to the casing stabbing board. 接好套管扶正台的气管线142.R un casing with the 350T slip elevator. 用350吨卡瓦式吊卡下套管143.C lean and dry 20” casing threads with rags. 清洁并擦干20”套管丝扣144.W here is the rabbit for drifting the casing? 套管通径规在哪里?三、FISHING 打捞145.The bit cutters have been lost in the hole. 牙轮落井146.Run in the reverse-circulation basket. 下反循环打捞篮147.There is a lot of junk in the hole. 井下有很多落物148.The fish is 235.46 meters long. 落鱼长度235.46米149.The fish top is at 2478.34 meters. 鱼顶位置2478.34米四、FREEING STUCK PIPE 卡钻与解卡190.The down-hole problems are very complicated. 井下情况很复杂191.The hole is tight. 遇阻了192.Overpull while tripping out. 起钻遇卡(overpull: 超拉力)193.The formation is unstable. 地层不稳定194.The wall caving is severe. 井壁垮塌严重195.There are many return cuttings. 返出岩屑特别多196.The mud returns have decreased. 返出泥浆减少197.The hole is enlarged. 井眼扩大了198.The pipe’s stuck. 卡钻了199.Pull up to 150 tons. 上提150吨200.Slack off to 50 tons. 下放至50吨201.Ream down all the tight points. 在所有遇阻点进行划眼202.The rotary table can’t rotate. 转盘转不动203.Where is the sticking point? 卡点在哪里204.Make a tensile test. 做拉伸试验205.Back it off above the free point. 在卡点以上倒扣206.Where is the back-off position? 脱扣位置在哪207.Plug the well for side tracking. 打水泥塞侧钻五、ABNORMAL WELL CONDITION AND WELL CONTROL异常井况与压井168.The mud is gas out. 泥浆有气侵169.The pit has lowered quickly. 泥浆池液面下降很快170.The hole lost returns. 井口不返泥浆171.The returns are unstable. 返出泥浆量忽大忽小172.Where’s the thief zone? 漏失层在哪里173.Cut down the flow rate. 降低排量174.Lower the mud density. 降低比重175.Cut down the hydrostatic pressure. 减少静压176.The gas smell is strong. 天然气味度很浓177.There’s some trace of oil. 发现有油花178.The pump pressure is fluctuating. 泵压不稳179.It is a zone of abnormal pressure. 这是异常压力层180.The hole (well) is kicking! 井涌啦!181.Shut in the BOP! 关闭防喷器182.Sound the general alarm quickly! 快发出综合警报183.The stand pipe pressure is 10 kg/cm2. 立管压力10公斤/厘米2184.The casing pressure is 25 kg/cm2. 套压2510公斤/厘米2185.Fill out the kill sheet. 填写压井记录表186.Kill the well. 压井187.Ther e’s a combination of lost returns and the kick. 又喷又漏, 情况复杂188.Reverse the gas out of the hole. 反循环排气189.What’s the lag time? 迟到时间是多少190.The well is now stable. 现在井眼已经稳定六、PREPERATION BEFORE MAKING HOLE钻前准备191.Tell the mechanic to check the motor torque . 让机械师检查马达扭矩。

相关文档
最新文档