英文缩写中英文对照表

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

缩写说明

Metrics:

HR Dept.:

L.W.D.C: Lost Work Day Case Rate

Quality Dept.:

COQ: Cost of Quality (质量成本)

WIR: Wiring Incident Report (配线报告)

FTQ: First Time Quality (

WFCC: Worldwide Formal Customer Complaint (所有客户正式的反馈)PPM:Pieces per Million (一百万产品)

RRPPM: Return & Reject Piece Per Million (不合格部品多少钱)IPTV: Incident Per Thousand Vehicles (运输中发生的事故部品)

Engineering Dept.:

C/O: Changeover time (对策转变时间)

C/T: Cycle Time (周期时间)

PDT: Planned Downtime (计划停产期)

LT: Lost Time (损失时间)

DT: Downtime (停产期)

OA: Operational Availability (操作可行性)

OE: Operational Effectiveness(效力的可行性)

PC&L Dept.:

OEM: On time Shipments (及时出货)

IPM: Incident Per Million (事故损失的钱数)

E&O: Excess & Obsolete (超额完成&荒废的)

PRR: Problem Resolving Request (问题分析请求)

MU: Material Utilization (材料的利用)

Others:

Tpct: Total Production Cycle Time (整体生产周期)

MCR: Material Cost Reduction (材料成本的精简)

6SIGMA

DMAIC: Define, Measure, Analysis, Improve, Control

VOC: Voice of Customer

CTQ: Critical to Quality

SIPOC: Supplier, Input, Process, Output, Customer

I&CIM: Innovation, & Continuos Improvement

TMAP: Though Map

PMAP: Process Map

MSE: Measure System Evaluation

FMEA: Failure Modes and Effects Analysis

NEM: Numerical Evaluation of Metrics

ANOVA: Analysis of Variance

DOE : Design of Experiments

LEAN

1.DMS -- Delphi Manufacturing system

⏹EEI : Employee Environment & Involvement

⏹WPO: Workplace Organization

⏹QS: Quality System

⏹OA: Operational Availability

⏹MM: material movement

⏹MSD: Manufacturing System Design

2.KMS -- Kaizen Manufacturing system

3.OSKKK -- Observation, Standardization, Kaizen, Kaizen, Kaizen ……

4.PFP -- People Focus practice

5.VSM—Value Stream Mapping

6.TPM: Total Production Maintenance

7.PMP: Production Maintenance Partnership

8.PM: Planned Maintenance

9.TPS: Toyota Production System

10. SMED: Single Minutes of Exchange Die

12. FIFO: First In First Out

13. 5S: Clear (Sort), Organize ( Straighten), Clean(Sweep), Maintain (Standardize),

Continuous Improvement ( Sustain)

14. NWG: Natural Work Group

15. WIP: Work In Process

16. PFEP: Plant For Every Part

17. JIT: Just in Time

相关文档
最新文档