Warranty Period: Means (i) a period of 18 (eighteen) months following Provisional Acceptance, during which SUBCONTRACTOR is responsible for making

good defects and damages in accordance with article 19.3;

The Service or WORK:Means all services or any portion of it to be provided by the SUBCONTRACTOR, including without limitation all work, labour, effort,

goods, materials and equipment to be provided and/or performed by

SUBCONTRACTOR, at its own cost and expense, in strict accordance with

the functional, performance, other specification and all other terms and

conditions of this SUBCONTRACTOR.

2. SCOPE OF WORK

2.1

2.2 The SUBCONTRACTOR hereby states that it has fully investigated in regard to the nature,

condition, quality, quantity, etc. of the Scope of Work to be performed.

2.3 The SUBCONTRACTOR further acknowledges that it has thoroughly investigated and

satisfied itself as to all general and local condition at the SITE and its surroundings in relation to the Scope of Work within the scope of the SUBCONTRACTOR.

7. WARRANTIES AND GUARANTEES

7.1.3 that materials, equipment, tools and supplies which become a part of the Scope of Work shall

be new, of the highest quality and of sufficient size and capacity and of proper constituents to perform property for the purpose and under the operating conditions specified in the SUBCONTRACT.

10. CHANGE OF SCOPE OF WORK

The PURCHASER reserves the right from time to time by written notice to the SUBCONTRACTOR, to modify , add or to reduce the Scope of Work under this SUBCONTRACT. In case of change to the Scope of Work, then the unit price and/or SUBCONTRACT Price shall be adjusted accordingly through a Change Order process as defined on APPENDIX F, either at PURCHASER own initiative or initiated by SUBCONTRACTOR. Such modifications, additions or reductions in the Scope of Work may include any modifications of the completion date.

14. PROCUREMENT

14.1 Unless it is defined as the PURCHASER supply of material under this SUBCONTRACT,

SUBCONTRACTOR shall provided all the

19. COMMENCEMENT, COMPLETION AND ACCEPTANCE OF WORK

19.1 COMMENCEMENT OF WORK ON SITE

The SUBCONTRACTOR shall commence the WORK on SITE in accordance with the

commencement date. Before commencing the WORK on SITE, the SUBCONTRACTOR shall have had its representative be present at the SITE,

1. Take into account 考虑

2.

相关文档
最新文档